| 1 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [Through Rate] |
| 2 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 3 | [33.1.3]Boring with 100 mm diameter casing pipe for hand pump / tube well, in all soils except ordinary hard rocks requiring blasting, including removing the casing pipe after the hand pump / tube well is lowered and tested : 3. Beyond 12 m and up to 18 m depth [Through Rate] |
| 4 | [33.11.3]Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 plain slotted (having slot of size 1.6/3.2 mm) mild steel threaded and socketed/ plain bevel ended pipe (type A) of required dia, conforming to IS: 8110, of reputed and approved make, having wall thickness not less than 5.40 mm, including painted with outside surface with two coats of anticorrosive bitumastic paint of approved brand and manufacture, including hire and labour charges, fittings and accessories, all complete, for all depths, as per direction of Engineer -in-charge. 3. 200 mm nominal size dia [Through Rate] |
| 5 | [33.12]Supplying, filling, spreading and levelling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads and lifts, all complete as per direction of Engineer-in-charge. [Through Rate] |
| 6 | [33.13]Supplying, filling, spreading and levelling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads and lifts, all complete as per direction of Engineer-in-charge. [Through Rate] |
| 7 | [33.14]Supplying, filling, spreading and levelling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads and lifts, all complete as per direction of Engineer -in-charge. [Through Rate] |
| 8 | [33.15]Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading and sizes as per actual requirement, all complete as per direction of Engineer-in-charge. [Through Rate] |
| 9 | [33.16.3]Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for bore well of: 3. 200 mm dia [Through Rate] |
| 10 | [33.17.3]Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tube well as per IS: 2800 (part I), including necessary bolts and nuts of required size complete. 3. 200 mm clamp [Through Rate] |
| 11 | [33.19]Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by `V` notch method or any other approved method, measuring static level and draw down etc. by step draw down method, collecting water samples and getting tested in approved laboratory, i/c disinfection of tube well, all complete, including hire and labour charges of air compressor, tools and accessories etc., all as per requirement and direction of Engineer-in-charge. [Through Rate] |
| 12 | [33.5]Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four Nos. longitudinal and 9 Nos. cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge. [Through Rate] |
| 13 | [33.7.1.1]Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire and running charges of all equipments, tools, plants and machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre and up to 150 metre depth below ground level. 1.1. All types of soil 300 mm dia [Through Rate] |
| 14 | [33.8.3]Supplying, assembling, lowering and fixing in vertical position in bore well, Unplasticised PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings and accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 3. 200 mm nominal size dia [Through Rate] |
| 15 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 16 | [5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate] |
| 17 | [6.1.8]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 8. 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 18 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |