| 1 | Taking out existing CC PCC Tiles from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge DSR 16.83 |
| 2 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DSR 16.82 |
| 3 | Taking out existing channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 4 | Laying old PCC Kerb in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished kerb edging shall be measured for payment. |
| 5 | Laying old Channel in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished Channel edging shall be measured for payment. |
| 6 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. DSR 15.60 |
| 7 | Providing and fixing PCC kerbs of size 2’-0” x0'-9” having 4” thickness at bottom and 3” thickness at top and made of plain cement concrete 1:2:4 duly vibrated and compacted. The rates also includes fixing in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished kerb edging shall be measured for payment. |
| 8 | Providing and fixing PCC Channel of size 2'-0\\" x 1'-0\\" x 3\\" thick duly mixed, mechanically & compacted made of PCC 1:2:4 duly cured and finished. The rates also includes fixing in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished Channel edging shall be measured for payment. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) DSR 4.1.10 |
| 10 | Laying old PCC tiles of any design/ shape laid in required line, level, curvature, colour and pattern over and including 20 mm thick cement sand mortar 1:4 including grouting of joints complete as per the direction of Engineer-in-charge. |
| 11 | Providing and fixing 5 mm thick Asbestoes Strip of 65 mm wide in joints of cement concrete flooring complete as per specification and direction of Engineer-in-charge. |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) DSR 4.1.2 Please Enable Macros to View BoQ information |