| 1 | Earth work in excavation of foundation trenches in all type of soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. |
| 2 | Supplying of filling sand in foundation and plinth including watering,ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of Engineer-In-Charge. |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (11/2\\") size Crusher black broken granite stone metal of approved size and quality and from approved quarry including hoisting lowering and laying concrete in layers not exceding 15 cm (6\\") thick to the required level ramming, watering and curing etc complete including cost and conveyance of all materials with all taxes and royalities and all labour with T&P required for the work etc. complete including dewatering if required. |
| 4 | RCC Work of M-20 Grade with 20mm and down grade black hard granite cursher broken stone chips |
| 5 | Straightening bentup coiled Rods cutting,bending, cracking hooking, welding to jointing if required the M.S. rod or tor steel or binding wires and tying the grills hoisting lowering and placing in proper position as required for R.C.Cworkws with cost,conveyance and taxes of M.S. rods or tor steel and binding wires of 18 to 20 guage and labour with all T&P required for the work etc. compite in all floors weight of binding wireswillnot be considered for payment and payment will be made on weight of M.S. Rods or tor steel only |
| 6 | Providing and errection of over head signage as per clause 802-7 and 802.3 a design support system of M.S. square pipe as trusses as per structural design requirement and approved plans placing in position by mechanicl means and trusses and vertical support. |
| 7 | Providing and errection of over head signage as per clause 802-7 and 802.3 a design support system of M.S Bolt, Nut & Washers as per structural design requirement and approved plans placing in position by mechanicl means. |
| 8 | Double stage centering and shuttring for roof slab Balconies and projections above 3.60m and 7.20 m heights. (data for 9.30 sqm) |
| 9 | Providing and erecting heavy durable FRP Gate made with 4-layered ISO-UV fiber basin with industrial mate inside, including MS-iron angler frame and bone, weather coat shiny dust free colour over it as per approved drawing including cost, conveyance, royalty, taxes of all materials, labour, T&P, excavation, curing etc. complete, under supervision of Engineer-In-Charge. |
| 10 | Hoisting joists and trusses and placing in position (Labour only). Please Enable Macros to View BoQ information |