| 1 | Oil Filtration of 2 nos., 33KV/3.3KV, 1250KVA Transformers at Gogol Pumping Station , with required tools & tackles, including draining of Oil in drums if required and refilling after filtration , Complete as directed by Engineer-in-Charge |
| 2 | \\"Toping up of transformer oil make Power oil for 2 nos 33KV/3.3KV , 1250 KVA, Outdoor transformers at Gogol Pumping Station.\\" |
| 3 | \\"Supply and Replacement of Silica gel of 2 nos breather of 33KV/3.3KV , 1250KVA Transformer at Gogol Pumping Station.\\" |
| 4 | \\"Servicing and Overhauling of CTR make, EO16 Type OLTC (On Load Tap Changer) by company technician/authorized experienced person as detail below: a) Check proper transformer OLTC isolation, b) Visual check for DM box function and condition : i) check all electrical connections , heater , thermostat & switch , Contactor operation, motor and gear operation smooth, motor protective relay operation Auxiliary transformer output voltage , Limit switch operation , Check energy accumulator spring function, check DB box door gasket, Check oil seal condition, Check OLTC conservator oil level. c) Selector switch condition checking: i) Check carbon deposition in selector switch chamber and clean the selector switch chamber, check for erosion of fixed and moving contacts ,check tightness of OLTC contacts and phase board assembly, Check tightness of copper tubes, taper pins and bushing board assembly, check tightness of epoxy Arm, assembly ( Main Moving and Resitance Moving contacts), Cleaning of selector switch contacts ,removing all carbon deposits with clean cloth ,check BDV value,\\" d) Operational Checking: i) Raise/ lower operational checking manual, Raise/ Lower operation electrical , checking through local control, Raise /Lower operation electrical checking through remote control counter operation, Check TPI indication progress, Check Tap function of OSR in test position, Check electrical operation through AVR , proper AVR setting to be done , e) Electrical Testing : Checking megger, Ratio test and Magnetic balance test etc. Complete as directed by Engineer-in-Charge. |
| 5 | Filtration of oil of 2 nos. OLTC(On Load Tap Changer) of 33KV/3.3KV, 1250KVA outdoor transformer at Gogol Pumping Station by draining of OLTC oil in clean and moisture free barrels and refilling after Servicing of OLTC including required tools & tackles Complete as directed by Engineer-in-Charge |
| 6 | \\"Supply and Toping up of transformer oil make Power oil for 2 nos OLTC's of 33KV/3.3KV, 1250KVA transformers at Gogol Pumping Station .\\" |
| 7 | \\"Supply and Replacement of silica jell of 2 nos breather of OLTC\\"\\" s of 33KV/3.3KV, 1250KVA Transformer at Gogol Pumping Station.\\" |
| 8 | Servicing and Overhauling 20 HP capacity monoblock Type KDS 2050 + make kirloskar by removing pump from foundation base, transporting to workshop, dismantling, impeller, cleaning the impeller, removing the shaft bend, filling shaft by welding and machining replacing bearings 6308 SKF both DE and NDE and greasing .Dismantling the motor, Cleaning, removing of dust, tightening of looseness of stator coils, brazing of coil connections , insulating the winding by using Dr. Bake insulation Varnish, replacing of stator terminal block, replacing the motor bearings, fan, assembling the motor, pump including replacing all bolts nuts washers etc complete. Transporting pump set at site fixing on foundation base, taking the pump by taking trial run on load condition. |
| 9 | Servicing and Overhauling 10 HP capacity monoblock, make kirloskar by removing pump from foundation base, transporting to workshop, dismantling, impeller, cleaning the impeller, removing the shaft bend, filling shaft by welding and machining replacing bearings 6308 SKF both DE and NDE and greasing. Dismantling the motor , Cleaning , removing of dust, tightening of looseness of stator coils, brazing of coil connections, insulating the winding by using Dr. Bake insulation Varnish, replacing of stator terminal block, replacing the motor bearings, fan, assembling the motor, pump including replacing all bolts nuts washers etc complete. Transporting pump set at site fixing on foundation base, taking the pump by taking trial run on load condition. |
| 10 | Supply of PVC/XLPE Armoured Cable with Copper conductor 650 /1100 V, 19 Core, 2.5 SQ. MM., Grade confirming to IS:7098 (Pt-1) 1988. Make: Polycab |
| 11 | Laying of one number PVC insulated and PVC sheathed/XLPE power cable of 1.1 KV grade of size not exceeding 25 sq. mm direct in ground including excavation in the form of a trench as per Cable Trench Drawing provided by the Engineer- Incharge sand cushioning with screened sand bed of 20mm thick protective covering with bricks placed breadth-wise on top of cable all over the run( the brick protection shall cover the cable and project atleast 5 cms over the sides of the cable) and backfilling the excavated earth without stones or hard material and making the surface proper with 15 cm crown on the top complete as required.;(b) In rocky strata Please Enable Macros to View BoQ information |