| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.By Manual MeansReinforced Cement Concrete |
| 2 | Diagonally woven crushed bamboo mat including durma mat lining and both longitudinal and transverse intermediate stiffners (about 300 mm. centre each way) and tied with 18 B.W.G. galvanised wire fitted and fixed in position complete but excluding costof supporting frame work. In wall fencing etc.For both side (vehicle & pedestrian) protection purpose |
| 3 | Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications.RCC Grade M30Height upto 5mUsing concrete Mixer |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.Using [b. Tor Steel rods / HYSD bars / TMT bars (JSW JSPL / Shyam / SRMB/ /SSL/ BMASL / Electrosteel) (Fe 415 /Fe 500 /Fe 500D, conforms to lS: 1786) |
| 5 | Welding by gas / electric plant including transportation of welding plant at site including cutting, forging & drilling to required shape. To make joints with existing rod with new one of each V Post |
| 6 | Epoxy bonding of new concrete to old concreteFor Vertical posts portions. |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]With 1:6 cement mortar 20 mm thick plaster |
| 8 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.In Ground Floor:Two Coats |
| 9 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat)Normal Acrylic Emulsion |
| 10 | Add GST @18 % |
| 11 | Add Labour Welfare Cess @1% Please Enable Macros to View BoQ information |