| 1 | Hire and labour charges for staging with sal bullah for super structure of bridge (Major and Minor) including stripping off and removing clearing on completion of work as per design and drawing approved by the Engineer-in-charge. |
| 2 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the top junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, clearing the site as per direction of Engineer in charge after removing the barricade.(a) 100mm. dia bamboo railing & 150mm.dia Jhau/Eucalyptus/other approved timber posts with 1.8 m spacing. (i) Railing 3 row on each leg and 1 at pivot point. |
| 3 | Cleaning the exposed corroded Reinforcement aswell as worn out concrete by sand blasting with aircompressor including all materials, hire charges ofmachineries and labour etc. all complete as pertechnical specification and direction of theEngineer-in-Charge. |
| 4 | Providing anti-corrosive protective coating to inhibitthe corrosion to HYSD reinforcements including twocoats of anti-corrosive coatings of consumption asper manufacturer's specification, cleaning etc.complete as per the direction of the Engineer-in-Charge. |
| 5 | Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy |
| 6 | Sealing of cracks / porous concrete by injection process through nipples/Grouting complete as per Technical specification.A. Cement Grout |
| 7 | Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. |
| 8 | Epoxy bonding of new concrete to old concrete |
| 9 | Guniting concrete surface with cement mortar (25 mm nominal thick) applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification. |
| 10 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) |
| 11 | Bamboo Pile Walling made of 6.5cm to 7.5cm dia bamboo (in single line) driven about half-length into ground at very close spacing of 30cm c/c side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and fixed with nails etc. and lining exposed portion with sheets made from cut drums (empty bitumen drums) fitted and fixed with a lap width of 100 mm at each joint, complete as per direction including the cost of drum sheets and including the cost of nails, wires etc.(iii) With bamboos of length above 2.50m and upto 3.00m |
| 12 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. |
| 13 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement) |
| 14 | Add GST@18% on Rs . 1125578.12 i.e. total amount over item no1 to 13 |
| 15 | Add Labour Welfare Cess @1% of Rs. 1328182.18 i.e. total amount of Item No. 1 to 14 Please Enable Macros to View BoQ information |