|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft / Disintegrated rock |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard rock not requiring blasting |
| 4 | Cement concrece (1:3:6) well mixed & laid in position complete including curing and finishing etc. Complete. |
| 5 | Stone kharanja in cement mortar (1:6) including curing etc. complete. |
| 6 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for foundation |
| 7 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for superstructure. |
| 8 | Cement concrete(1:2:4) well mixed and laid in position complete including curing and finishing. |
| 9 | 25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth finishing and curing of etc. Complete |
| 10 | Centering and shuttering work upto 4.5 m height for lamina concerting work |
| 11 | iRFkj dh ifê;k (STONE PATTI, 0.6*0.9)BSR MATERIAL RATE ITEM NO 13 A And इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। gkn bsr 2025-26 ITEM NO 82 A |
| 12 | Mkxcsfyx dk;Z 10 lseh ls 15 lseh xgjkb rd ¼thds,u 2026 vkbZVe ua- 6 द½ |
| 13 | taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr ¼thds,u 2026 vkbZVe ua- fofo/k 191½ |
| 14 | csafpax csl dk;Z gsrq feV`Vh dh [kqnkbZ ,oa [kksnh gqbZ feVVh dks ckgj fudkyuk izkjfEHkd yhM 50 eh- ,oa mBko 1-50 eh- ¼ch,lvkj ty lalk/ku foHkkx 2026 vkbZVe ua- 20 ist 14½ |
| 15 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. ¼thds,u 2026 vkbZVe ua- 196c½ मशीनरी कार्य सख्त मिट्टी (in Hard Soil) |
| 16 | esU;qvyh o Iysu jksyj }kjk feV~Vh dk nckuk ¼ch,lvkj ty lalk/ku foHkkx 2023 vkbZVe ua- 18 v ist 14½ |
| 17 | Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect ¼ch,lvkj ty lalk/ku foHkkx 2023 vkbZVe ua- 19 ist 14½ |
| 18 | feV~Vh esa ikuh Mkyuk e; ifjogu vkSlr nwjh 3 fd-eh- ¼ch,lvkj ty lalk/ku foHkkx 2023 vkbZVe ua- 28 a and b ist 15½ |
| 19 | 15 ls 30 lseh eksVs gFkksM+s ls rjk'ks gq, ,dy iRFkj dh fifpax leLr mBku ds lkFk ,oa vkiqfrZ ds lkFk ¼th ds ,u 2026 vkbVe uacj 167½ |
| 20 | LVkbZyks ?kkl ds cht dh vkiwfrZ ¼cktkj nj½ 1 fdyks@ykbu izfr 100 eh- |
| 21 | [email protected] ds cht dh vkiwfrZ ¼cktkj nj½ 2 fdyks@ykbu izfr 100 eh- |
| 22 | LVkbZyks ?kkl ds cht dh cqokbZ 6 ykbZu es ¼thds,u 2026 vkbZVe ua- 159½ |
| 23 | jrutksr vj.Mh ds cht dh cqokbZ 4 ykbZu es ¼thds,u 2026 vkbZVe ua- 159½ Please Enable Macros to View BoQ information |