| 1 | Road work |
| 2 | 3.30:Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310. |
| 3 | OD192301/2025-2026:Supplying and filling quarry muck for rectifying the slushy berms including conveyance of all materials, labor charges for spreading in line and level with all leads and lifts involved etc. complete as directed by the departmental officers at site |
| 4 | 4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method |
| 5 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 6 | 55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. |
| 7 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) |
| 8 | OD192303/2025-2026:Man mazdoor engaged for cleaning the site etc complete |
| 9 | OD192302/2025-2026:Supplying & fitting inauguration stone with lettering |
| 10 | DRAIN & SIDE PROTECTION WORK |
| 11 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) |
| 12 | OD192298/2025-2026:Providing and constructing sand bag bund 1.0m wide and the inside filled with earth for assuming depth of water 1.00m and height of bund to be 1.00m |
| 13 | OD192300/2025-2026:Pumbing or bailing out water and removing slush etc by using by pump set including cost of labour,oil,hire charges of pumpset etc. complete |
| 14 | OD192296/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonrywithgood quality blasted rubble including packing to compactness to lines and levels cost andconveyance ofallmaterials labour charges etc. complete as per direction of Departmental officers at siteMaterial |
| 15 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 16 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer |
| 17 | OD192297/2025-2026:Plain/Reinforced Cement concrete in open foundation, Drawing and Technical specifications PCC Grade M15(Without form work) |
| 18 | OD192299/2025-2026:Plain/Reinforced Cement concrete in open foundation, Drawing and Technical specifications PCC Grade M15 |
| 19 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications Please Enable Macros to View BoQ information |