| 1 | SP-1: PART-A : PIPING, INSULATION AND PAINTING WORKS |
| 2 | PIPING WORKS FOR OFFSITES & UTILITIES (INTERCONNECTING PIPEWAYS) |
| 3 | PIPING (ABOVE GROUND) : - Receipt of free issued Materials, transportation of all piping item(s) from Owner's storage point to worksite/work shop; fabrication including cutting, edge preparation, (inclusive of grinding the edges of pipe, fittings, flanges,etc. to match with the mating edges of uneven/different thickness wherever required); Locking arrangement for valves: fitup, bending, preheating wherever required, welding, threading, and laying of pipes of all types and thickness over sleepers, overhead on racks and at all elevations, connecting with equipment nozzles, strainers, sight glass, steam traps, expansion bellows, orifice assemblies, spray nozzles, rotameters, tappings for pressure gauges, thermowells, sample connections, springs, sample coolers, pressure relief valves, desuperheater etc. and fixing of gaskets, bolts, nuts including application of torque wherever required & all other inline instruments and fittings , like elbows, reducers, tees, vents, drains, SW/threaded valves upto 1.5 NB, Steam Supply/ Condensate Recovery stations (Cast/ Fabricated), alignment, Fixing and welding of RF pad, cleaning & flushing loop wise and system wise by water/Chemical/compressed air, hydrostatic, pneumatic, vacuum, spark testing , reinstatement, card board blasting, leak test, inertization, hot bolting if required and any other type of testing as specified, draining, drying by compressed air, completing all such works in all respects as per the specifications, drawings and instructions of Engineer- In-Charge. Contractor's scope of work includes transportation of fabricated / spooled piping from workshop to wok site . Scope of work Includes Instrument piping hook up items like impulse pipes, fittings etc., from piping isolation valve to instrument shall be fabricated, erected/installed based on the instrument hook drawing and other applicable standards (Instrument Impulse piping and fitting are free issue to contractor) Please Enable Macros to View BoQ information |
| 4 | PIPING (ABOVE GROUND) : - Receipt of free issued Materials, transportation of all piping item(s) from Owner's storage point to worksite/work shop; fabrication including cutting, edge preparation, (inclusive of grinding the edges of pipe, fittings, flanges,etc. to match with the mating edges of uneven/different thickness wherever required); Locking arrangement for valves: fitup, bending, preheating wherever required, welding, threading, and laying of pipes of all types and thickness over sleepers, overhead on racks and at all elevations, connecting with equipment nozzles, strainers, sight glass, steam traps, expansion bellows, orifice assemblies, spray nozzles, rotameters, tappings for pressure gauges, thermowells, sample connections, springs, sample coolers, pressure relief valves, desuperheater etc. and fixing of gaskets, bolts, nuts including application of torque wherever required & all other inline instruments and fittings , like elbows, reducers, tees, vents, drains, SW/threaded valves upto 1.5 NB, Steam Supply/ Condensate Recovery stations (Cast/ Fabricated), alignment, Fixing and welding of RF pad, cleaning & flushing loop wise and system wise by water/Chemical/compressed air, hydrostatic, pneumatic, vacuum, spark testing , reinstatement, card board blasting, leak test, inertization, hot bolting if required and any other type of testing as specified, draining, drying by compressed air, completing all such works in all respects as per the specifications, drawings and instructions of Engineer- In-Charge. Contractor's scope of work includes transportation of fabricated / spooled piping from workshop to wok site . Scope of work Includes Instrument piping hook up items like impulse pipes, fittings etc., from piping isolation valve to instrument shall be fabricated, erected/installed based on the instrument hook drawing and other applicable standards (Instrument Impulse piping and fitting are free issue to contractor) Please Enable Macros to View BoQ information |