| 1 | Supply, fabrication and fixing of stainless steel (SS-316) Coarse Bar screen (mechanically raked) with flat bar 50mm X 10mm Spacing of bars 50mm suitable for mounting in channel of specified size with inclination not more than 75 degree complete in all respect as per technical specification and the direction of the Engineer for following PEAK FLOW and upto 3m channel depth.10.1 MLD to 15 MLD |
| 2 | Add extra for additional depth of channel in mechanical coarse bar screen beyond 3 m depth. |
| 3 | Supply, Installation, Testing and Commissioning of CI Thimble Mounted Sluice Gate, Manually operated, Rising Spindle type. Sluice gates are as per IS 13349 Including all taxes, Freight, loading, unloading, fitting in position including Sluice gates are upward opening wall thimble mounted suitable for isolating the flow of sewer into out of the opening in the wall. It consists Gate frame, wall thimble, gate slide, shutter, seating/sealing faces .The gates will be provided with pads on sides, top and bottom to mount the wedges. The gate shall be designed in such a manner, so that it can be operated at 2 meter head. Gate frame & Shutter of CI Grade IS 210 FG 260, Head Stock assembly bolts & SS ASTM A276 Type 316, Stem, Operating Nut SS ASTM A276 Type 316., Duly tested for tensile strength, Tested for overall dimensions as per approved GA drawing complete in all respect as per specification and direction of Engineer for following PEAK FLOW and depth up to 3M. 10.1 MLD to 15 MLD |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks |
| 5 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 40mm thick |
| 9 | Neat cement punning |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Foundations, footings, bases of columns, etc. for mass concrete |
| 11 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | Suspended floors, roofs, landings, balconies and access platform |
| 13 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. |
| 14 | Supply & fabrication steel structure with MS channel / angle / joist / ISMB / sheet etc. including welding, rivetting, cutting, nut & bolt , one coat of primer & two coat of enamel paint etc. as required complete in all respect. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \\"A\\" attached with this BSR . Please Enable Macros to View BoQ information |