| 1 | dk;ZA |
| 2 | Safe carriage of the following material from store centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km:-8.5 Mtr. Long PCC Poles. |
| 3 | ACSR Weasel Conductor. |
| 4 | 11 KV Disc Insulator T&C type 4500kg. |
| 5 | 11 KV Disc fitting |
| 6 | 11 KV Pin insulator (Polymeric) with fitting |
| 7 | LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 8 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 9 | T/F 11/0.4 kV, 63 kVA |
| 10 | T/F 11/0.4 kV, 100 kVA |
| 11 | 11 KV XLPE Cable AL. 3x185 sq.mm |
| 12 | 33 KV XLPE Cable AL. 3x300 sq.mm |
| 13 | Various Type Cable Jointing Kits (Indoor &outdoor ), straight through for 11/33 KV. |
| 14 | 11 KV VCB I/C and O/G unit. |
| 15 | 33 KV Control Pannel |
| 16 | 33 KV CT |
| 17 | Stay set Complete |
| 18 | 11 KV fuse Set |
| 19 | 11 KV TPMO |
| 20 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 21 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Cable laying by sand and bricks Various type 33KV /11 KV and LT XLPE cable trench less (HDD Method) |
| 22 | Water level earthing of VCB/ 250 KVA/400 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 23 | Fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 24 | Plinth & foundation of Power T/F (Inc. all acces.) with Labour |
| 25 | Mounting and fixing of 63/100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 26 | Construction of Fire wall Between Power T/F with material and Labour |
| 27 | Fixing of Danger board and number plate with clamp . |
| 28 | Filling of various type 33/11 kv cable jointing kit. |
| 29 | Fixing of 11 KV TPMO |
| 30 | Fixing of 11 KV Fuse Set . |
| 31 | Mounting and fixing of 33 KV CT as per respo norms. |
| 32 | Earthing of PCC/ST Pole and Transformer by M.S Earthing rod |
| 33 | Installation of 1-ϕ & 3 ϕ Distribution Box and making proper connection |
| 34 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Single support 8.5 Mtr. long PCC Poles :- |
| 35 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Double support Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 36 | Sagging LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 37 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 38 | Sagging Various type 11/33 KV XLPE Cable over head |
| 39 | Fixing of Dead and Clamp |
| 40 | Fixing of Clamp with J hook |
| 41 | Installation of VCB in control room & making proper connection. |
| 42 | Installation of 33 KV Control Pannel in control room & making proper connection. |
| 43 | Grounting of Pcc/ST POLE |
| 44 | Filling of various type 33/11 kv cable jointing kit. |
| 45 | Installtion of 11 kv Fuse Set |
| 46 | Installtion of 11 kv TPMO |
| 47 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-Old and used TF 16 |
| 48 | 33 KV Old and Dameged cable 3*300sqmm |
| 49 | 11 KV Old and Dameged VCB scrap |
| 50 | 11 KV Old and Dameged cable 3*185SQMM |
| 51 | Old and Dameged 33 KV control panel |
| 52 | Old and Dameged 33 KV CT |
| 53 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 54 | 1-ϕ & 3 ϕ Distribution Box clamp |
| 55 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 56 | Clamps for LT T-off with bolts & Nuts |
| 57 | Dead-End Clamp |
| 58 | Clamp with J-Hook |
| 59 | LT PVC Cable 3.5x70/35 sq mm |
| 60 | LT PVC Cable 3.5x150/70 sq mm |
| 61 | Danger Board with clamps |
| 62 | LT Fuse set with all accecesories |
| 63 | Piercing connector |
| 64 | M.S Channel Top |
| 65 | M.S Channel Dropper |
| 66 | M.S Angle For TF Base |
| 67 | M.S channel T-Off |
| 68 | M.S Channel |
| 69 | Concreting Of Pole |
| 70 | ALL LUG Please Enable Macros to View BoQ information |