| 1 | Supply of Material |
| 2 | Top Channel holding clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 3 | Dropper Channel holding clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 4 | T-off Channel holding clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 5 | Stay Clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 6 | Stay Insulator |
| 7 | F Bracket suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 8 | X-arm Clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 9 | Nut Bolt Warious size |
| 10 | Stone pad Suitable for pcc pole |
| 11 | PVC PG Clamp |
| 12 | Dead End Clamp |
| 13 | I Hook |
| 14 | J Hook |
| 15 | Suspension Clamp |
| 16 | Aluminium Lug 240 mm2 |
| 17 | Aluminium Lug 150 mm2 |
| 18 | Aluminium Lug 75 mm2 |
| 19 | Erection of Works |
| 20 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole with complete fitting as per respo norms.(This work includes grouting and earthing of pole) |
| 21 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Double Pole with complete fitting as per respo norms. |
| 22 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) of ACSR acsr weasal conductor and other line Materials. |
| 23 | Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR Weasal conductor and binding with insulator. |
| 24 | Safe loading carriage from store center chilbila Pratapgarh to work site (distance 10-70 km) unloading erection of LT ABC(3*50+1*35+1*16) AND LT PVC Cable 3.5*70 SQ mm cable with complete fitting of I HOOK Suspension clamp,dead end clamp distribution box and disconnection and reconnection of cable as per respo norms |
| 25 | Safe carriage of following capacity Transformers from store centre pratapgarh to work site and mounting at double pole with energisation as per respo norms |
| 26 | 25 KVA |
| 27 | 63 KVA |
| 28 | Safe carriage of following capacity Transformers for capacity enhancement from store centre Pratapgarh to work site and mounting at double pole with energization as per respo norms |
| 29 | 25 KVA |
| 30 | 63 KVA |
| 31 | 100 KVA |
| 32 | 250 KVA |
| 33 | Safe carriage of following capacity Transformers after capacity enhancement from work site to store centre Pratapgarh. |
| 34 | 10 KVA |
| 35 | 25 KVA |
| 36 | 63 KVA |
| 37 | 100 KVA |
| 38 | Complete stay grouting and nozzaling as per respo norms. |
| 39 | Earthing of Transformers (Body & Nutral) |
| 40 | Construction of pilinth for 250 KVA Transformer size 1.5*1.5*1.75 Meter with materials (All Material Provide by Contractor) |
| 41 | Fancing around the pilinth 2X2X1.5 Meter with gate (All Material Provided by Contractor) as per respo norms |
| 42 | Two No. Earthing at each 250 KVA T/F pipe Earthing (All Material Provide by Contractor) |
| 43 | Supply and instalation of Tailless unit Please Enable Macros to View BoQ information |