| 1 | Earth work in cutting or excavation in foundation in ordinary soil with back filling including all lead and lift and T&P etc. Complete. |
| 2 | Providing shuttering for C.C. work in foundation i/c all cost of labour & T&P etc complete for proper completion of work. |
| 3 | Laying of Cement Concrete in (1:3:6) with Cement, Coarse Sand, Stone Grit including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 4 | Brick work in 1:4 with cement, coarse sand and Ist Class Bricks including cost of all material, labour, T&P, etc. Complete. |
| 5 | Struck deep pointing in 1:2 C.M. On Brick Masonry including cost of all materials, Labour, T&P etc. Complete. |
| 6 | Laying of cement concrete in (1:2:4) with Cement, Coarse Sand, Stone Grit in walls coping including cost of all material, labour, T&P, etc complete. |
| 7 | Providing & fixing 150mm dia inner NP-2 socket hume pipe placing in position with jointing including cost of all materials, labour, T&Ps etc. Complete |
| 8 | Providing, cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work |
| 9 | Laying of cement concrete in (1:1.5:3) with Cement, Coarse Sand, Stone Grit in walls coping including cost of all material, labour, T&P, etc complete. |
| 10 | Finishing walls with acrylic smooth exterior paint of approved brand and manufacturer and required shade on undecorated wall surface to give even shade over 2.20Lt./10Sqm including cost of all materials, labour, T&P etc. complete |
| 11 | Printing Letters 10 cm height on Boundary pillers including materials and all charges. |
| 12 | Earh work in embankment for making surface for kharanja over left bank of dy.in ordinary soil including initial lead upto 30m and lift uoto 1.50m including rammimng, dressing and manual compaction complete |
| 13 | Providing and laying Dry brick on edge soling/Kharanja UsingIst Class Bricks with preparation subgrade and required pattern including cost of all materials, labour, t&p etc Complete. 0.0 0.0 Please Enable Macros to View BoQ information |