| 1 | Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - |
| 2 | LT XLPE Cable 3.5x240 Sq.mm. |
| 3 | LT AB Cable 3x120+1x95+1x16 Sq.mm. |
| 4 | PCC Pole 8.5 Mtr. Long |
| 5 | Stay Set Complete |
| 6 | Earthing Complete |
| 7 | Outdoor Cable Jointing Kit for LT XLPE Cable 3.5x240 Sq.mm. |
| 8 | Three Phase Distribution Box |
| 9 | Nuetral Cum Earth Wire |
| 10 | Providing of following material of standard make / best quality for complete the work of LT line as per RESSPO norms by the contractor at his own cost : - |
| 11 | Stone Pad |
| 12 | Concreting of Pole |
| 13 | Concreting of Stay Set |
| 14 | Suspension Clamp |
| 15 | J Hook |
| 16 | Dead End Clamp |
| 17 | I Hook |
| 18 | Three Phase Distribution Box Clamp |
| 19 | PG Clamp |
| 20 | 11 KV Cross Arm Holding Clamp |
| 21 | F-Bracket with Bolt & Nuts |
| 22 | Cable RCC / Stone Route Marker yellow colour with proper engraved. |
| 23 | Nuetral Cum Earth Wire |
| 24 | Erection / Fixing of following material for complete the work of LT line as per RESPO norms by the contractor at his own cost : - |
| 25 | Stone Pad |
| 26 | Concreting of Pole |
| 27 | Concreting of Stay Set |
| 28 | Suspension Clamp |
| 29 | J Hook |
| 30 | Dead End Clamp |
| 31 | I Hook |
| 32 | Three Phase Distribution Box Clamp |
| 33 | PG Clamp |
| 34 | 11 KV Cross Arm Holding Clamp |
| 35 | F-Bracket with Bolt & Nuts |
| 36 | Cable RCC / Stone Route Marker yellow colour with proper engraved. |
| 37 | Nuetral Cum Earth Wire |
| 38 | Outdoor Cable Jointing Kit for LT XLPE Cable 3.5x240 Sq.mm. |
| 39 | Three Phase Distribution Box |
| 40 | The Excavation of foundation pit in CC road/ mix soil/ normal soil/ soft & hard rack by using heavy duty compressor and its back filling and leveling etc. The size of the pit will be 600x600x1800 mm for each pole and having a depth of 1/6 of the full length of the support. |
| 41 | Erection of PCC pole 8.5 Mtr. including fitting of all reqired accessories of LT line as per RESSPO schedule. |
| 42 | Grouting of each pole (In ratio of 1:4:8 in Cement, sand and Brick Ballast) in size 450mmx450mmx1800 mm as per RESSPO schedule Complete in all respects. |
| 43 | Grouting of stay rod 1800x16 mm & Fixing, Tighting & nozzling of stay wire 5 kg with the pole of required tension with clamps, bolt & nut. |
| 44 | Excavation of earth and driving of M.S. earthing rod of size 20x2500 mm in earth and jointing through G.I wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts etc. as per RESSPO schedule Complete in all respects. |
| 45 | Laying, Lifting and final Binding, Sagging of Cable LT ABC size 3x120+1x95+1x16 Sq.mm. including fixing of all accessories as per RESSPO schedule Complete in all respects. |
| 46 | Drilling of suitable dia 140 mm by trenchless method by horizontal boring machine at a depth of 1.5 mtrs below the ground level for laying / road crossing of LT cable with Road Restoration in accordance with GPR Survey. Any damage to Road part from estimate shall be responsibility of contractor shall take NOC permission from concerned Authority & Restore as per their norms. |
| 47 | Providing of 06 Mtr long pieces of HDPE pipe 140mm Dia (PVVNL approved) after inspection of competent committee at manufacturing site of the items with actual guarantee period. |
| 48 | Laying and interconnecting of above 06 Mtr long pieces of HDPE pipe (140 mm Dia) (PVVNL approved) in trench for laying of LT cable complete in all respects.. |
| 49 | Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop. |
| 50 | Providing & Fixing of HDPE Socket suitable for HDPE pipe 140mm dia. |
| 51 | Tree prunning / cutting as per work site requirement. |
| 52 | Laying and pulling of LT XLPE Cable (3.5x240 Sq.mm.) through HDPE pipe complete in all respects. |
| 53 | Laying of LT XLPE Cable (3.5x240 Sq.mm.) in air / loop / riser as per work site requirement complete in all respects with lug. |
| 54 | Hi port test for LT XLPE Cable (3.5x240 Sq.mm.). |
| 55 | Hoisting of LT XLPE cable on double pole structure through GI pipe 6 inch dia 3 mtr long fixed on pole structure including its jumpering complete with clamps, bolts and nuts. |
| 56 | Dismantling & Carriage from work site to store with loading & unloading of ST Pole off size (Old & Used) Metable Scrap |
| 57 | Dismantling & Carriage from work site to store with loading & unloading of old & jarjar ABC. |
| 58 | Dismantling & Carriage from work site to store with loading & unloading of LT XLPE Cable Damage. |
| 59 | Repairing of damaged & repairable LT Panel in electrical system at different location with replacement of parts Old / Damage Bus Bar, Damaged Door Welding, damaged lugs, cleaning and painting, making damaged foundation of existing LT Panel with providing all material & Labour for rectifying the defects found in panel. |
| 60 | Geo-tagging of complete work as per UPPCL order No. 2259 Dated 21.08.2025 (Letter attached with condition). Please Enable Macros to View BoQ information |