| 1 | Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - |
| 2 | 33 KV Pin Insulator |
| 3 | Line Isolator 800 A, 33 kv |
| 4 | Bus Isolator 800 A, 33 kv |
| 5 | 33 KV CT, 400/200 1-1-1A |
| 6 | 33 KV CT, 200/100 1-1-1A |
| 7 | 33 KV VCB 750 MVA 1250 A |
| 8 | 33 KV Control Panel Single |
| 9 | 33 KV Control Panel for Double Transformer |
| 10 | 33 KV Fuse Set |
| 11 | 11 KV Fuse Set |
| 12 | 11 KV Fuse Wire |
| 13 | Structure for Cable Support |
| 14 | Structure for The Above PT |
| 15 | Structure for The Above CT |
| 16 | Structure for The Above LA |
| 17 | Structure of 33 KV Isolator (125x65x6mm GI Channel) |
| 18 | ACSR Panther |
| 19 | Lightening Arrester |
| 20 | Earthing Complete |
| 21 | 33 KV PT (Outdoor) 33 KV /110 V |
| 22 | Providing of following material of standard make / best quality for complete the work of 33 KV Switchyard & 11 KV Switchgears work with disconnecting & reconnection of cable etc. as per RESSPO norms by the contractor at his own cost : - |
| 23 | CT PG Clamp with nut bolt |
| 24 | PG Clamp Panther with nut bolt |
| 25 | GI Earthing Strip |
| 26 | Connector for 33 kv ISOLATOR with nut bolt |
| 27 | Brass Bolted Lugs |
| 28 | Ferrule |
| 29 | Copper Control Cable 4x2.5 sqmm |
| 30 | Copper Control Cable 2x2.5 sqmm |
| 31 | Heat Shrink Busbar Ins. Tape:50mmx10mtr |
| 32 | Copper Busbar 1000mmx50x8 sqmm Strip |
| 33 | 11 KV PT make Cromption, Pascal, CG, Steel Make, C Sec etc as per site requirement |
| 34 | Eyelet Clip with nut bolt |
| 35 | MS Nut and Bolt |
| 36 | Sunderies Items |
| 37 | Holding Clamps with bolts & nuts |
| 38 | Trench 1x1 sq ft. |
| 39 | Plinth & Foundation for 33 KV VCB |
| 40 | Plinth & Foundation for Structure |
| 41 | Foundation Plinth of Isolator |
| 42 | Fabrication and Foundation of Structure |
| 43 | Fabrication, Installation / Erection / Fixing of following material for complete the work of 33 KV Switchyard & 11 KV Switchgears work with disconnecting & reconnection of cable etc. as per RESSPO norms by the contractor at his own cost : - |
| 44 | CT PG Clamp with nut bolt |
| 45 | PG Clamp Panther with nut bolt |
| 46 | GI Earthing Strip |
| 47 | Connector for 33 kv ISOLATOR with nut bolt |
| 48 | Brass Bolted Lugs |
| 49 | Ferrule |
| 50 | Copper Control Cable 4x2.5 sqmm |
| 51 | Copper Control Cable 2x2.5 sqmm |
| 52 | Heat Shrink Busbar Ins. Tape:50mmx10mtr |
| 53 | Copper Busbar 1000mmx50x8 sqmm Strip |
| 54 | 11 KV PT make Cromption, Pascal, CG, Steel Make, C Sec etc as per site requirement |
| 55 | Eyelet Clip with nut bolt |
| 56 | MS Nut and Bolt |
| 57 | Sunderies Items |
| 58 | Holding Clamps with bolts & nuts |
| 59 | Trench 1x1 sq ft. |
| 60 | Plinth & Foundation for 33 KV VCB |
| 61 | Plinth & Foundation for Structure |
| 62 | Foundation Plinth of Isolator |
| 63 | Fabrication and Foundation of Structure |
| 64 | 33 KV Pin Insulator |
| 65 | Line Isolator 800 A, 33 kv |
| 66 | Bus Isolator 800 A, 33 kv |
| 67 | 33 KV CT, 400/200 1-1-1A |
| 68 | 33 KV CT, 200/100 1-1-1A |
| 69 | 33 KV VCB 750 MVA 1250 A |
| 70 | 33 KV Control Panel Single |
| 71 | 33 KV Control Panel for Double Transformer |
| 72 | 33 KV Fuse Set |
| 73 | 11 KV Fuse Set |
| 74 | 11 KV Fuse Wire |
| 75 | Structure for Cable Support |
| 76 | Structure for The Above PT |
| 77 | Structure for The Above CT |
| 78 | Structure for The Above LA |
| 79 | Structure of 33 KV Isolator (125x65x6mm GI Channel) |
| 80 | ACSR Panther |
| 81 | Lightening Arrester |
| 82 | Earthing Complete |
| 83 | 33 KV PT (Outdoor) 33 KV /110 V |
| 84 | Dismantling & Refitting of Line PTs with Struc |
| 85 | Dismantling & Refitting of Isolator with Struc |
| 86 | Dismantling & Reinstallation of Line PTs with Struc with foundation |
| 87 | Dismantling & Reinstallation of Isolator PTs Struc with foundation |
| 88 | Dismantling & Carriage from work site to store with loading & unloading of 33 KV Bus Isolator (o&u) |
| 89 | Dismantling & Carriage from work site to store with loading & unloading of 33 Line Isolator (o&u) |
| 90 | Dismantling & Carriage from work site to store with loading & unloading of 33 KV Pole mounted Isolator (o&u) |
| 91 | Dismantling & Carriage from work site to store with loading & unloading of 33 KV Isolator Mel Table Scrap (F) |
| 92 | Dismantling & Carriage from work site to store with loading & unloading of Old & damage 11 KV PT |
| 93 | Dismantling & Carriage from work site to store with loading & unloading of Old & damage 33 KV CT |
| 94 | Dismantling & Carriage from work site to store with loading & unloading of Old & damage Control panel |
| 95 | Dismantling & Carriage from work site to store with loading & unloading of Burnt and Scrap Control Cable 4x2.5 sqmm (o&u) |
| 96 | Dismantling & Carriage from work site to store with loading & unloading of Control Cable 4x2.5 sqmm (o&u) |
| 97 | Dismantling & Carriage from work site to store with loading & unloading of Old & Damage Fuse Set |
| 98 | CHEMICAL EARTHING WORK (SUPPLY AND INSTALLATION) AS PER FOLLOWING:-Note :- The all material and labour shall be provided by the contractor with 24 month guarantee for resistance value less than one OHM. |
| 99 | Providing of earthing electrode :-Material Description : GI Electrode, Galvanization : 150 Micron (Min),IS Standard : IS 3043 / IEEE - 837, Short Time Current Rating kA (rms) For 1 Sec : 42 KA For 1 Sec, Dia of Electrode : 50mm, Length of Electrode : 3000mm, Weight of Electrode : 15 Kgm, Pipe Thickness : 4mm or As per IS : 1239 4mm, Inside Filling Material : Crystalline Conductive Mixture, Inner Strip : 3100 X 50 X 6 mm,Terminal Hole Dia : 16 MM. Technology : Metal Thermal Spray (Joints) Protection Earthing Resistance Value in Different Soil Conditions with ERIC Backfill Compound : Normal Soil - Upto 2 Ohms, Sand. Muran Soil - Upto 4 Ohms, Rock Soil - Upto 4 Ohms,Electrode Testing Cetificate : CPRI Testd. Surrounding Filling Material (ERIC):- Product : ERIC (Earth Resitance Improvement Compound), IS Standard : IS 3043/IEEE 837, Chemical Composition : Graphite, Activated Carbon, Bentonite, ETC., Resistivity Value : >0.2 Ohm Per Meter, Melting Temperature : 2500 Degree Centigrade,Specific Gravity : 2.6, PH Value of Chemical : 7-9, Solubility in water : 3.54, Colour : Light cream/Ash, Main Caution ; Sodium, Moisture Capacity at 105 Degree : 10%, Weight of Chemical used / Earthing Pit : 50 Kg, Water Absorbing Capacity : 20 Times, Environmental Effects : Eco Friendly. Test Certifictae : ROHS Certified, Thermal Stability : Testsed, Corrosion Resistance : Tested, Swell Test Certificate : Yes, Ph Value Test Certificate : Yes. Installation Parameter :- Need Hole Dia : 6\\"-8\\" Need Hole Depth : 3 Meter,Guarantee : 24 Month. |
| 100 | Providing and fixing of GI strip of size 50 mm x 6 mm suitable for T/F & Panel. |
| 101 | Providing and fixing of PVC Pit covers for above earthing electrode terminals. |
| 102 | FOLLOWING WORK OF 2 NOS. DELTA EARTHING (INCLUDED ALL MATERIAL & LABOUR) OF POWER TRANSFORMERS INSTALLED AT VARIOUS 33/11 KV SUBSTATIONS FOR PROTECTION POWER TRANSFORMER :-Note :- The all material and labour shall be provided by the contractor with 24 month guarantee for resistance value less than one OHM. |
| 103 | Fabrication of 40mm MS round 1.5 Mtr. long and V shape as per PVVNL / RESPO drawing and connecting them with main earth mat in X and Y MS round bars by excavation of earth, inserting of MS round bars, welding and back filling of earth. |
| 104 | Boring with 150mm dia casing pipe to a probable depth of 19.0 meter long from ground level with skilled and unskilled labour including all T&P, boring apparatus and supervision charges etc. required for proper completion of work. |
| 105 | Inserting 40x6mm G.I flat in 50 mm dia B-class (JINDAL / TATA) ISI mark 6.0 meter long 3 pipe placed horizontally on ground and bolling the G.I. flat with 150 mm long 75x6 mm copper plate conical piece on and then bolting the G.I. flat with G.I pipe in such a way that copper flat remains in contact with the pipe. Lowering of 6.0 meter long G.I pipe with conical copper plate connected and at bottom along with G.I. flat inside the pipe in boring of 150mm G.I. pipe pieces by G.I. sockets along with 40x6 mm G.I. flat running Inside the pipe by making 150cm lap joints 75mm above ground level. Taking out 40x6 mm G.I. flat the upper end of pipe by making a cut of 45mm wide up to a depth of 50mm in upper portion of G.I. pipe and providing 1 no.cap type G.I. socket on upper threaded portion of pipe for water pouring in the pipe at regular filling the space. all the required material will be proivide by contractor. |
| 106 | Excavation of pit of size for formation delta for 1.00M x 1.00 M x 1.00 M. M.S. electrodes of 40mm dia 3.0 Mtr. long in the earth on all the three corner of the pit equal distance of 1.0 Mtr. long keeping the top of electrode 50 cm above the pit ground level, welding of 40 mm M.S. round pieces of required length on all three sides of electrodes. 50x6 mm M.S. flat connecting bore earthing & neutral (HV & LV) of all T/Fs. |
| 107 | Geo-tagging of complete work as per PVVNL order No. 2259 Dated 21.08.2025 (Letter attached with condition). Please Enable Macros to View BoQ information |