| 1 | Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump at site proper stacking of materials. |
| 2 | PCC 11.0 Mtr. Long |
| 3 | PCC 8.5 Mtr. Long |
| 4 | ACSR Weasal Conductor |
| 5 | 11 KV 3x185sq.mm XLPE Cable |
| 6 | 11 KV S/T jointing Kit for 3x185 sq mm XLPE Cable |
| 7 | 11 KV outdoor jointing Kit for 3x185 sq mm XLPE Cable |
| 8 | 11 KV T-off Channel (100x50) mm |
| 9 | 11 KV Polymer Disc Insulator |
| 10 | V-type x arm |
| 11 | Gaurding angle 65x65x6 |
| 12 | 11 KV Pin insulator |
| 13 | M.S Top Channel 100x50 mm 2240 mm |
| 14 | Dropper channel 100x50x2028 |
| 15 | M.S. Angle 65x65x6 mm Bracing 11 kv |
| 16 | Stay wire 7/10 |
| 17 | G.I. Wire 8 SWG for earthing & guarding |
| 18 | G.I. Wire 6 SWG for earthing & guarding |
| 19 | Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection of Single Pole for 11 KV Line on 8.5 Mtr PCC Pole with fitting of necessary clamp & other acessories like 1 no Cross Arm, 3 No. polymer Pin insulator as per norms. (Contractor shall provide , necessary clamps, F-brackets, Nut - Bolts, Washers etc.) |
| 20 | Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Sectioal Double pole for 11 KV Line on 8.5 Mtr PCC Pole with fitting of necessary clamp & other acessories like 1 No. Top channel of 100x50x6 mm size 2240 mm, Disc Fitting 6 No., Bracing angle 1set. ,11 kv Disc insulator T & C 06 No. and 3 No.11 kv Pin insulator with pin etc. as per norms. (Contractor shall provide 3 No. G.I. Pin, E- Bracket 3 No., necessary clamps, Disc Fitting 6 No., Nut - Bolts Washers etc.) |
| 21 | Erection of single stud pole support on PCC Pole 8.5 Mtr long with fixing of necessary clamps and other accessories required for erection. (Contractor shall provide necessary clamps, Nut - Bolts, Washers etc) |
| 22 | Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection of Single Pole for 11 KV Line on 11.0 Mtr PCC Pole with fitting of necessary clamp & other acessories like 1 no Cross Arm, 3 No. polymer Pin insulator as per norms. (Contractor shall provide , necessary clamps, F-brackets, Nut - Bolts, Washers etc.) |
| 23 | Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection of Sectional Single Pole for 11 KV Line on 11 Mtr PCC Pole with fitting of necessary clamp & other acessories like 2 No. T-off channel 1300 mm long , 6 No. 11 kv Disc insulator T &C, 4 No. 11 KV Pin insulator with pin, 11 KV Disc fitting 6 No. etc. as per norms. (Contractor shall provide 4 Nos. 11 KV G.I. Pin, Disc fitting 6 No. necessary clamps, E-brackets, Nut - Bolts, Washers etc.) |
| 24 | Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Sectioal Double pole for 11 KV Line on 11 Mtr PCC Pole with fitting of necessary clamp & other acessories like 1 No. Top channel of 100x50x6 mm size 2240 mm, Disc Fitting 6 No., Bracing angle 1set. ,11 kv Disc insulator T & C 06 No. and 3 No.11 kv Pin insulator with pin etc. as per norms. (Contractor shall provide 3 No. G.I. Pin, E- Bracket 3 No., necessary clamps, Disc Fitting 6 No., Nut - Bolts Washers etc.) |
| 25 | Erection of single stud pole support on PCC Pole 11.0 Mtr long with fixing of necessary clamps and other accessories required for erection. (Contractor shall provide necessary clamps, Nut - Bolts, Washers etc) |
| 26 | Cradle Guarding of 11 KV line at road crossing, 11 KV line crossing, canal/telephone line crossing by fixing Guarding Angle 65x65x6 mm, 2500 mm at double pole and 1600 mm long at single pole by stringing and sagging of 2 No. G.I.wire with lacing and tightening with mounting. (Contractor shall provide Necessary clamps for fitting of guarding angle and 6 No. Eye Bolt 12x110 mm etc.) |
| 27 | Nozeling and grouting of stay set complete at sectional F/P, S/P etc pole and extra stay set at angle locations (All materials stay insulator, stay set, stay clamp etc. will be arranged by the contractor except stay wire) |
| 28 | Fixing of additional 11 KV T-off Channel (100x50) mm with clamp, nut & bolts etc. at required places. Contractor shall provide clamp nut & bolts etc. |
| 29 | Fixing of additional 11 KV Pin insulator with clamp, nut & bolts etc. at required places. Contractor shall provide clamp nut & bolts etc. |
| 30 | Fixing of additional 11 KV Polymer Disc Insulator with clamp, nut & bolts etc. at required places. (Contractor shall provide clamp nut & bolts, 11 kV disc fitting etc.) |
| 31 | Providing and Fixing of additional Disc Fitting with clamp, nut & bolts etc. at required places. Contractor shall provide clamp nut & bolts etc. |
| 32 | Stringing, sagging, binding and Jumpering of ACSR Weasal conductor. 3 Phase of 11 KV Line including fixing, mounting of P.G.clamp suitable for Weasal Conductor at sectional point. (Contractor shall provide necessary PG clamps etc) |
| 33 | Laying & Dressing of 3x185 sq. mm XLPE Cable underground Laying of 3x185 sq .mm XLPE Cable in normal soil by digging of trench 900 mm deep, 450 mm wide including supply of required materials, as 1st class Bricks, and fine sand. Providing 150 mm fine sand cusion beneath, and 150 mm sand cusion above the cable. The cable shall be duly protected by Bricks sand as per RESPO norms .After laying the cable refilling and ramming of the left out soil,closing the trench and leveling. |
| 34 | Installation of Heat Shrinkable Type cable jointing kits of following types/sizes for 11 KV XLPE Cable. |
| 35 | (a) Fixing of 11 KV 3x185 sq. mm Outdoor End Terminations (jointing kit supplied by dept.) |
| 36 | (a) Fixing of 11 KV 3x185 sq. mm Straight through (jointing kit supplied by dept.) |
| 37 | Hoisting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of proper support and its clamping, providing long barral lugs 3 nos and P.G. Clamps for weasal conductor & \\"Y\\" shape jumpering properly and 02 nos. supporting angle 65X65X6, 2240 mm long and making connection including supply of jumpering cable ,mounting clamps as per RESSPO Norms. (All material will be supplied by the contractor like M.S Pipe , P.G. Clamps, Al. Lug And Supporting Angle 65x65x6, 2240 mm). |
| 38 | Grouting of structure by digging of pit 1.83 Mtr deep for 11/8.5 Mtr STP/PCC , foundation is provided with help of steel or wooden formers, groutung with 1:4:8 Ratio cement, sand & first class brick ballast 0.285 cu mtr for 11/9 Mtr STP/PCC, plinthing 0.3 Mtr above G/L and proper plastering. |
| 39 | Supply and fixing of a stone pad of size 300x300x75 mm at PCC/STP Bottom of the pit ( Contractor shall provide all materials) |
| 40 | Nozeling and grouting of stay set. (All the civil material and stay set, stay insulator will be arranged by the contractor except Stay wire) |
| 41 | Fixing of barbed wire on poleSupply and fixing of barbed wire on the pole above 2750 mm ground level. Barbed wire wrapped for a distance of 0.9 mtr. with a pitch of 13.mm at a height. (All materials supplied by the contractor) |
| 42 | Fixing of Danger board .Supply and fitting of Danger board of size 250x200x2 mm 3650 mm above ground level as per Respo norms.RESPO Drawing No-55 |
| 43 | Number Plate With Clamps and Nuts & Bolts above ground level as per Respo norms.RESPO Drawing |
| 44 | Providing of HDPE 6\\"Dia Pipe PN-6 Specification |
| 45 | Laying of cable & HDPE PipeLaying of Single circuit 11 KV 3x185 Sq mm XLPE cable and HDPE Pipe by drilling method below NHAI railway crossing. The cable be laid at the depth of 3 mtr from the under surface in HDPE pipe (200 mm. dia.) casing. |
| 46 | High Pressure testing to which 33 KV Line & cable to be stand for duration of 5 minutes after completion of Laying, Stringing, sagging, binding and Jumpering of ACSR Dog conductor. ( Testing equipment will be arranged by the contractor) |
| 47 | Providing and fixing at the top of the pole Pcc & Stp Extension piece 1.5 mtr channel 125x65 mm and required places ( crossing of lines etc) and supporting with clamp and all fittings. (All materials will be supplied by the contractor). |
| 48 | Fabrication, Erection and grouting of route marker and marking 33 KV line by painting after grooving on the stone. (Contractor shall provide all materials) |
| 49 | Removal/lopping and chopping of tree cutting( branches )which are lying in route of 11 KV Overhead Line. |
| 50 | restoring the road as it is before after completion of work |
| 51 | Received back materials which is replaced and left over after including iron drum erection it will be deposited to the respected to store centre in which the project location comes under. |
| 52 | NOC will be granted from Central/ state Electrical safety department.( Final settlement of the payment will be done after providing receipt, agreement and permission paper). |
| 53 | permission of cutting and chopping of tree from forest deppt. ( Final settlement of the payment will be done after providing receipt, agreement and permission paper) Please Enable Macros to View BoQ information |