| 1 | Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - |
| 2 | PCC Pole 8.5 Mtr. Long |
| 3 | PCC Pole 11 Mtr. Long |
| 4 | ACSR Rabbit Conductor |
| 5 | ACSR Dog Conductor |
| 6 | 11 KV 3Cx70 Sq.mm. XLPE Cable |
| 7 | 11 KV 3Cx120 Sq.mm. XLPE Cable |
| 8 | 11 KV 3Cx185 Sq.mm. XLPE Cable |
| 9 | 11 KV 3Cx300 Sq.mm. XLPE Cable |
| 10 | 11 KV Cross Arm V Type |
| 11 | 11 KV Pin Insulator with Pin |
| 12 | 11 KV Disc Insulator with Fitting |
| 13 | Earthing Complete |
| 14 | Stay Complete |
| 15 | 11 KV 3Cx120 Sq.mm. O/D Termnation Jointing Kit |
| 16 | 11 KV 3Cx185 Sq.mm. O/D Termnation Jointing Kit |
| 17 | 11 KV 3Cx300 Sq.mm. O/D Termnation Jointing Kit |
| 18 | Providing of following material of standard make / best quality for complete the work of HT line as per RESSPO norms by the contractor at his own cost : - |
| 19 | Concreting of Pole |
| 20 | Concreting of Stay |
| 21 | Stone Pad |
| 22 | F Bracket |
| 23 | Holding Clamp |
| 24 | Aluminimum Lugs off size |
| 25 | Danger Board |
| 26 | MS Nut & Bolts |
| 27 | MS Dropper channel size 100x50x2280/3200mm |
| 28 | MS Top Channel size 125x65x2240mm |
| 29 | MS Angle for GI Pipe supporting size 75x75x6x2028mm |
| 30 | MS Angle for Cross Bracing size 65x65x6x2700mm |
| 31 | MS T-off channel size 100x50x1640mm |
| 32 | G.I. Pipe 6' Dia (Grade-B) |
| 33 | Cable RCC / Stone Route Marker yellow colour with proper engraved. |
| 34 | Fabrication & Erection / Fixing of following material for complete the work of HT line as per RESSPO norms by the contractor at his own cost : - |
| 35 | Concreting of Pole |
| 36 | Concreting of Stay |
| 37 | Stone Pad |
| 38 | F Bracket |
| 39 | Holding Clamp |
| 40 | Aluminimum Lugs off size |
| 41 | Danger Board |
| 42 | MS Nut & Bolts |
| 43 | MS Dropper channel size 100x50x2280/3200mm |
| 44 | MS Top Channel size 125x65x2240mm |
| 45 | MS Angle for GI Pipe supporting size 75x75x6x2028mm |
| 46 | MS Angle for Cross Bracing size 65x65x6x2700mm |
| 47 | MS T-off channel size 100x50x1640mm |
| 48 | G.I. Pipe 6' Dia (Grade-B) |
| 49 | Cable RCC / Stone Route Marker yellow colour with proper engraved. |
| 50 | 11 KV Cross Arm V Type |
| 51 | 11 KV Pin Insulator with Pin |
| 52 | 11 KV Disc Insulator with Fitting |
| 53 | 11 KV 3Cx120 Sq.mm. O/D Termnation Jointing Kit |
| 54 | 11 KV 3Cx185 Sq.mm. O/D Termnation Jointing Kit |
| 55 | 11 KV 3Cx300 Sq.mm. O/D Termnation Jointing Kit |
| 56 | The Excavation of foundation pit in CC road/ mix soil/ normal soil/ soft & hard rack by using heavy duty compressor and its back filling and leveling etc. The size of the pit will be 600x600x1800 mm for each pole and having a depth of 1/6 of the full length of the support. |
| 57 | Erection of PCC pole 8.5 Mtr. long including fitting of all reqired accessories of HT line as per RESSPO schedule. |
| 58 | Erection of PCC pole 11 Mtr. long including fitting of all reqired accessories of HT line as per RESSPO schedule. |
| 59 | Grouting of each pole (In ratio of 1:4:8 in Cement, sand and Brick Ballast) in size 450mmx450mmx1800 mm as per RESSPO schedule Complete in all respects. |
| 60 | Grouting of stay rod 1800x16 mm & Fixing, Tighting & nozzling of stay wire 5 kg with the pole of required tension with clamps, bolt & nut. |
| 61 | Excavation of earth and driving of M.S. earthing rod of size 20x2500 mm in earth and jointing through G.I wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts etc. as per RESSPO schedule Complete in all respects. |
| 62 | Laying, Lifting and final Binding, Sagging of ACSR Rabbit Conductor including fixing of all accessories as per RESSPO schedule Complete in all respects. |
| 63 | Laying, Lifting and final Binding, Sagging of ACSR Dog Conductor including fixing of all accessories as per RESSPO schedule Complete in all respects. |
| 64 | Drilling of suitable dia 140 mm by trenchless method by horizontal boring machine at a depth of 1.5 mtrs below the ground level for laying / road crossing of 11 KV cable with Road Restoration in accordance with GPR Survey. Any damage to Road part from estimate shall be responsibility of contractor shall take NOC permission from concerned Authority & Restore as per their norms. |
| 65 | Providing of 06 Mtr long pieces of HDPE pipe 140mm Dia (PVVNL approved) after inspection of competent committee at manufacturing site of the items with actual guarantee period. |
| 66 | Laying and interconnecting of above 06 Mtr long pieces of HDPE pipe (140 mm Dia) (PVVNL approved) in trench for laying of 11 KV cable complete in all respects.. |
| 67 | Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop. |
| 68 | Providing & Fixing of HDPE Socket suitable for HDPE pipe 140mm dia. |
| 69 | Tree prunning / cutting as per work site requirement. |
| 70 | Laying and pulling of 11 KV XLPE Cable through HDPE pipe complete in all respects. |
| 71 | Laying of 11 KV XLPE Cable in trench by open cut method with brick, sand & back filling complete in all respects as per RESPO norms for laying / replacement of 11 KV cable with Road Restoration in accordance with GPR Survey. Any damage to Road part from estimate shall be responsibility of contractor shall take NOC permission from concerned Authority & Restore as per their norms. |
| 72 | Laying of 11 KV XLPE Cable in air / loop / riser as per work site requirement complete in all respects. |
| 73 | Hi port test for 11 KV XLPE Cable |
| 74 | Hoisting of 11 KV XLPE cable on double pole structure through GI pipe 6 inch dia 3 mtr long fixed on pole structure including its jumpering complete with clamps, bolts and nuts. |
| 75 | Dismantling & Carriage from work site to store with loading & unloading of Old & jarjar ACSR Weasel Conductor |
| 76 | Dismantling & Carriage from work site to store with loading & unloading of Old & jarjar ACSR Weasel Conductor |
| 77 | Dismantling & Carriage from work site to store with loading & unloading of ST Pole Off Size |
| 78 | Dismantling & Carriage from work site to store with loading & unloading of Old & jarjar 11 KV AB Cable Conductor |
| 79 | Geo-tagging of complete work as per PVVNL order No. 2259 Dated 21.08.2025 (Letter attached with condition). Please Enable Macros to View BoQ information |