| Sl. No. | Item Description |
| 1 | INCREASING CAPACITY OF 33/11 KV SUB STATION PITHIPUR FROM 5+10 MVA TO 10+2X5 MVA DISTT AMETHI Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump site proper stacking. |
| 2 | 33 KV Bus Isolator |
| 3 | 33 KV Lightening Arrestor |
| 4 | 90 lbs rail Pcs for T/F ( 44.64 Kg/m) |
| 5 | 33 KV VCB 800A, 750 MVA |
| 6 | Singe T/F control pannel |
| 7 | C.T. O/D 33 KV CTR 200/100/1-1A |
| 8 | 11 KV Incoming switch gear 600/300/5A, 350 MVA |
| 9 | 11 KV Out going switch gear 200/100/5A0250MVA |
| 10 | 11 KV 3 Core Cable 3x300 mm XLPE |
| 11 | 11 KV Cable 3x185 sq. mm XLPE |
| 12 | 11 KV cable jointing kit indoor 3x300 sq.mm. XLPE |
| 13 | 11 KV cable jointing kit outdoor 3x300 sq.mm. XLPE |
| 14 | 11 KV cable jointing kit indoor 3x185 sq.mm. XLPE |
| 15 | 11 KV cable jointing kit outdoor 3x 185 sq.mm. XLPE |
| 16 | M.S Top Channel 125x65x6 mm 3200 mm long |
| 17 | 11 KV Disc insulator B & S Type 70 KN |
| 18 | Bracing angle 65x65x6 mm, 4300 mm long |
| 19 | 105 lbs rail piece/ R.S Joist 150x150 |
| 20 | 24 Volt Battery set |
| 21 | 24 Volt Battery charger |
| 22 | ACSR Dog Conductor |
| 23 | M.S. Channel 125x65 (for Structures) |
| 24 | M.S. Angle 75x75x6 (for Structures) |
| 25 | ST Pole 11 Mtr |
| 26 | M.S.Angle iron 65x65x6 bracing 2700 mm |
| 27 | 11 KV Top channel 100X50X 2240 mm |
| 28 | Dropper Channel 100x50 mm 2028 mm |
| 29 | 11 kv Polymer Pin insulator |
| 30 | 11 KV Disc insulator polymer 45 Kn |
| 31 | Stay wire 7/10 |
| 32 | 6 SWG G.I. Wire |
| 33 | Plinth of 5 MVA, 33/11 KV T/FsConstruction of Plinth of size 3.46x3.46 Mtr for 5 MVA T/F having not less than 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. (All the material will be supplied by the Contractor except rail Piece) |
| 34 | H.T. Cable LayingLaying & dressing of 11 KV, 3x300 and 3X185 Sq.mm XLPE cable underground from 05 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. (All the material will be supplied by the contractor) |
| 35 | Providing of 33 KV Post Insulator |
| 36 | Installation of Post Insulator Installation of post insulator on the post insulator structure . The work includes fabrication for proper fixing if required. |
| 37 | Installation Of CT Installation of CTs of ratio 200/100/1A on the CTs structure. The work includes fabrication for proper fixing if required. |
| 38 | Installation of Lightening ArrestorsAssembling and installation/ mounting of Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required. |
| 39 | Installation of Switchgears in Control roomShifting carefully and safely 11 Kv incoming Switchgear, 11 KV outgoing Switchgear and 11 KV Bus Coupler from out side of the switch gear room, as per direction of Engineer Incharge, Placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position and alignment and mountting of P.T. on incoming S/G. |
| 40 | Installation of Bus Isolators Assembling and installation of Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment and grising and oiling so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. |
| 41 | Installation of 33 KV VCBInstallation of 33 KV 750 MVA 800 Amp VCB on 33 KV VCB structure along with earthing by G.I. strip 50x6 mm size with main earthmat of Switchyards complete in all respect including commissioning. |
| 42 | Fixing and making Bus Bar connection in between I/C and O/G switchgears after cleaning and tapping with H.T. tape, Empire tape and PVC tape properly providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material Strictly to the satisfaction of site incharge. |
| 43 | Installation of Heat Shrinkable Type cable jointing kits indoor and O/D end Termination Joint suitable for 11 KV 3X300 & 3X185 XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. |
| 44 | Fabricatin Of CT/ Structure Fabrication of CT Structure as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.93 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allignment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc. (All the material will be supplied by the contractor except Steel Section) |
| 45 | Lightening Arrestor/ Post Insulator StructureFabrication of 1 No Lightening Arrestor structure & 1 set of Post Insulator structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.9 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc.(All the material will be supplied by the Contractor except steel) |
| 46 | Bus Isolator StructureFabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075x0.9x0.3 mtr 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Plinths of the Isolator structure shall be properly finished with champering of edges.(All the material will be supplied by the Contractor like M.S Flat etc. except steel) |
| 47 | Plinth for 33KV VCBConstruction of plinth of size 2.0x1.5x0.9 (Mtr) suitable for erection of super structure for 33 Kv VCB including grouting of Anchor bolts in proper allingment and level. Scope of work includes excavation of foundation base concreting in CC 1:6:12 ( cement, fine sand and brick ballast) 1st class brick work in cement mortor of ratio 1:4 CC in Ratio 1:4:8 and RCC work in ratio 1:2:4 ( Cement, coarse sand and stone grit of 20 mm gauge) as per Drawing |
| 48 | Cable stand StructureFabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 49 | Construction of 11 KV Double poleSafe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Double pole for 11 KV feeder on 11.0 Mtr ST Pole with fitting of necessary clamp & other acessories like 1 No Top channel ,Bracing angle 1 set., Disc insulator 3 No. and pin insulator 3 no. as per norms. (Contractor shall provide , necessary clamps, Disc Fitting, Nut - Bolts etc.) |
| 50 | Provding, fixing and mounting of following equipments (All the material will be supplied by the contractor) |
| 51 | 11 KV TPMO switch with holding clamps and fixing of chanel of M.S chanel 100x50x6 mm Y handle of TP must be G.I pipe. |
| 52 | 11 KV Fuse set with holding clamps and proper size of fixing channel. |
| 53 | Grouting of following structure by digging of pit 1.83 Mtr deep for 11 Mtr STP,with 1:4:8 Ratio cement, sand & first class brickballast0.285 cu mtr for 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering. |
| 54 | Providing and fixing of earth rod for earthing of support by G.I. Wire 6 SWG as per norms. (All material will be arranged by the contractor Like earth rod except 6 swg wire) |
| 55 | Nozeling and grouting of stay set. (All the civil material and stay set will be arranged by the contractor except Stay wire) |
| 56 | Painting of StructurePainting of 11 Mtr ST Pole with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 57 | Providing and fixing of P.G clamp for dog/panther and connector. |
| 58 | Providing and fixing of copper L piece/connector ( for 05 MVA T/F) |
| 59 | Neutral standFabrication, erection and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 60 | Hoisting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of proper support and its clamping , providing long barral lugs 6 nos and P.G. Clamps & \\"Y\\" shape jumpering properly and 02 nos. supporting angle 65X65X6, 2800 mm as per RESSPO Norms. (All material will be supplied by the contractor like MS Pipe , P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2800 mm). |
| 61 | Hoisting of 11 KV Cable on existing/erected cable stand and on 11 KV incoming must be with proper size of G.I clamps ( In case of cable stand 02 clamp per cable and 01 no. clamp in case of incoming). The neutral of 11 KV cable inserted into lug must be tightend with the earth with the help of nut & bolt. In the case of cable stand All the phase of the cable must be connected with the P.G clamp to bus bar which must be made by cable size 11 KV 3x300 XLPE sq. mm. If it is double circuit cable hoisting, second circuit cable hoisted from the other side of the cable stand and same clamping would be done. |
| 62 | Supply & Laying of 6x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 63 | Supply & Laying of 4x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 64 | Supply & Laying of 2x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 65 | Special Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.I. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor) |
| 66 | Delta type Earthing of Power T/F Neutral Earthing of Power T/F Neutral by providing 03 No. of \\"B\\" class G.I. pipe 50 mm Dia 20 mtr long from ground upto the water level The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect and arrangement of G.I Pipe like delta it will be connected to eachother and Providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect. (All the material will be supplied by the contractor) |
| 67 | Construction of control cable trench of 200 mm wide and 300 mm deep with MS strip at a distance of 1mtr. With brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with MS strip. (All the material will be supplied by the contractor) |
| 68 | Construction of trench cover of 600 mm long and 75 mm thick for cable trench Including cost of material, labour and T&P. (All the material will be supplied by the contractor) |
| 69 | Painting of All switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 70 | Battery and Battery charger |
| 71 | Installation of 24 Volt Battery 200 AH ( 01 set=12 Nos, 2 Volt each with ISI 1651, IS nomenclature T 200 P) With its proper connection. |
| 72 | Installation of Input voltage 230 V, AC one phase 50 hertz, output 24 Volt , 40 Amp DC Battery charger with its proper connection. |
| 73 | Chemical and acid resistance cabinet which must be FRP materials. Stand /cabinet for battery set for proper stacking and storage (All the materials will be supplied by the contractor) |
| 74 | Earthing of battery charger connected with 25x6 G.I strip (All the materials will be supplied by the contractor) |
| 75 | 33 KV Bay Bus Bar & Stringing.Stringing of 33KV Bay Bus Bar by using and laying of ACSR Dog Conductor/panther including making Vertical/Horizontal (Y-shape) jumper connection through PG clamps and connecting all the equipments ( Bus isolator, P.I. , C.T. , VCB, L.A & T/F) with each other through connecting clamps. (All the material will be supplied by the contractor) |
| 76 | Shifting carefully and installation of Single/double Transformer Control pannel in control room and earthing of pannel on side and do proper connection. |
| 77 | Digging and locating the earth mat and do outdoor Structures earthing by G.I Flat. 50X6 mm the job include cutting, bending. (All the material will be supplied by the contractor.) |
| 78 | Commissioning and testing of 5 MVA T/F and its eqipments installed in switchyards and 11 KV Incoming and Outgoing Pannels complete in all respect upto energising |
| 79 | Providing of Rubber matting one side chequered and other side plane size1800x900x12 mm |
| 80 | providing of Hand gloves As per IS 4770 and tested potential 33 Kv. |
| 81 | Bus Bar ExtensionExtension of of bus bar by Digging of 1 Nos Pits of size 2.2mt x1.4mt x 0.75 Mtr providing stone pad at the bottom of the trench and grouting of the one legs of the Bus Bar Gantry in CC ( cement, Coarse sand and stone grit of 20mm gauge) in the ratio 1:3:6 including supply of all T&P shuttering etc. in a block of size 2.2 mtx1.4 mtx0.75 mt. The work consists of dragging , shifting up to 40 mtr raising and erecting the two pre fabricated legs of Bus Gantry in proper allingment level and plumb. Both the plinths of the termainal gantry shall be properly finished with champering of edges. The work includes fabrication of Bus Bar Gantry 6.23 MtrLong as per RESPO drawing no.38 ( Set of 1) (All materials provided by the contractor except dog conductor , steel and disc insulator .) |
| 82 | Earthing of 11KV & 33KV SwitchgearLaying of earth mat for earthing of indoor equipments by means of M.S. Strip 50x6mm Connecting to 4 Nos. earthing electrodes of 32 mm (including fabrication of earthing electrodes) 3 Mtr long on each side (as per RESPO Drawing RES-40). This work includes driving of eath electrodes deep down into the earth so that its TOP remains 500 mm below ground level. The work include laying, bending, welding of M.S. earth strips 50 x 6 mm in the control room and connecting to both side squares. |
| 83 | Received back materials which is replaced and left over after erection it will be deposited to the respected to store centre in which the project location comes under. |
| 84 | Centrifuging of oil in 05 MVA TF |
| 85 | Replacement of damage oil seal /Packing |
| 86 | Supply and installation of Silica Gel with cabinet including breather |
| 87 | Providing & Replacement of Bushing rod HV for 05 MVA TF |
| 88 | Centrifuging of oil in 05 MVA TF |
| 89 | Sundries (Painting etc.) |
| 90 | Radiator wall welding (leakage fixing with gas welding or as per requirement etc) |
| 91 | Replacement of OTI&WTI |
| 92 | Breaking the concrete fencing/ Boundary wall in the switchyard of sub. Station for moving 05 MVA Transformer in switchyard after complition the work covered and restore the wall |
| 93 | INCREASING CAPACITY OF 33/11 KV SUB STATION DAKKHINWARA FROM 1x5 MVA TO 2X5 MVA DISTT AMETHI Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump site proper stacking. |
| 94 | 33 KV Bus Isolator |
| 95 | 33 KV Lightening Arrestor |
| 96 | 90 lbs rail Pcs for T/F ( 44.64 Kg/m) |
| 97 | 33 KV VCB 800A, 750 MVA |
| 98 | Singe T/F control pannel |
| 99 | C.T. O/D 33 KV CTR 200/100/1-1A |
| 100 | 11 KV Incoming switch gear 600/300/5A, 350 MVA |
| 101 | 11 KV Out going switch gear 200/100/5A0250MVA |
| 102 | 11 KV 3 Core Cable 3x300 mm XLPE |
| 103 | 11 KV Cable 3x185 sq. mm XLPE |
| 104 | 11 KV cable jointing kit indoor 3x300 sq.mm. XLPE |
| 105 | 11 KV cable jointing kit outdoor 3x300 sq.mm. XLPE |
| 106 | 11 KV cable jointing kit indoor 3x185 sq.mm. XLPE |
| 107 | 11 KV cable jointing kit outdoor 3x 185 sq.mm. XLPE |
| 108 | 24 Volt Battery set |
| 109 | 24 Volt Battery charger |
| 110 | ACSR Dog Conductor |
| 111 | M.S. Channel 125x65 (for Structures) |
| 112 | M.S. Angle 75x75x6 (for Structures) |
| 113 | ST Pole 11 Mtr |
| 114 | M.S.Angle iron 65x65x6 bracing 2700 mm |
| 115 | 11 KV Top channel 100X50X 2240 mm |
| 116 | Dropper Channel 100x50 mm 2028 mm |
| 117 | 11 kv Polymer Pin insulator |
| 118 | 11 KV Disc insulator polymer 45 Kn |
| 119 | Stay wire 7/10 |
| 120 | 6 SWG G.I. Wire |
| 121 | Plinth of 5 MVA, 33/11 KV T/FsConstruction of Plinth of size 3.46x3.46 Mtr for 5 MVA T/F having not less than 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. (All the material will be supplied by the Contractor except rail Piece) |
| 122 | H.T. Cable LayingLaying & dressing of 11 KV, 3x300 and 3X185 Sq.mm XLPE cable underground from 05 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. (All the material will be supplied by the contractor) |
| 123 | Providing of 33 KV Post Insulator |
| 124 | Installation of Post Insulator Installation of post insulator on the post insulator structure . The work includes fabrication for proper fixing if required. |
| 125 | Installation Of CT Installation of CTs of ratio 200/100/1A on the CTs structure. The work includes fabrication for proper fixing if required. |
| 126 | Installation of Lightening ArrestorsAssembling and installation/ mounting of Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required. |
| 127 | Installation of Switchgears in Control roomShifting carefully and safely 11 Kv incoming Switchgear, 11 KV outgoing Switchgear and 11 KV Bus Coupler from out side of the switch gear room, as per direction of Engineer Incharge, Placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position and alignment and mountting of P.T. on incoming S/G. |
| 128 | Installation of Bus Isolators Assembling and installation of Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment and grising and oiling so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. |
| 129 | Installation of 33 KV VCBInstallation of 33 KV 750 MVA 800 Amp VCB on 33 KV VCB structure along with earthing by G.I. strip 50x6 mm size with main earthmat of Switchyards complete in all respect including commissioning. |
| 130 | Fixing and making Bus Bar connection in between I/C and O/G switchgears after cleaning and tapping with H.T. tape, Empire tape and PVC tape properly providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material Strictly to the satisfaction of site incharge. |
| 131 | Installation of Heat Shrinkable Type cable jointing kits indoor and O/D end Termination Joint suitable for 11 KV 3X300 & 3X185 XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. |
| 132 | Fabricatin Of CT/ Structure Fabrication of CT Structure as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.93 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allignment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc. (All the material will be supplied by the contractor except Steel Section) |
| 133 | Lightening Arrestor/ Post Insulator StructureFabrication of 1 No Lightening Arrestor structure & 1 set of Post Insulator structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.9 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc.(All the material will be supplied by the Contractor except steel) |
| 134 | Bus Isolator StructureFabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075x0.9x0.3 mtr 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Plinths of the Isolator structure shall be properly finished with champering of edges.(All the material will be supplied by the Contractor like M.S Flat etc. except steel) |
| 135 | Plinth for 33KV VCBConstruction of plinth of size 2.0x1.5x0.9 (Mtr) suitable for erection of super structure for 33 Kv VCB including grouting of Anchor bolts in proper allingment and level. Scope of work includes excavation of foundation base concreting in CC 1:6:12 ( cement, fine sand and brick ballast) 1st class brick work in cement mortor of ratio 1:4 CC in Ratio 1:4:8 and RCC work in ratio 1:2:4 ( Cement, coarse sand and stone grit of 20 mm gauge) as per Drawing |
| 136 | Cable stand StructureFabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 137 | Construction of 11 KV Double poleSafe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Double pole for 11 KV feeder on 11.0 Mtr PCC Pole with fitting of necessary clamp & other acessories like 1 No Top channel ,Bracing angle 1 set., Disc insulator 3 No. and pin insulator 3 no. as per norms. (Contractor shall provide , necessary clamps, Disc Fitting, Nut - Bolts etc.) |
| 138 | Provding, fixing and mounting of following equipments (All the material will be supplied by the contractor) |
| 139 | 11 KV TPMO switch with holding clamps and fixing of chanel of M.S chanel 100x50x6 mm Y handle of TP must be G.I pipe. |
| 140 | 11 KV Fuse set with holding clamps and proper size of fixing channel. |
| 141 | Grouting of following structure by digging of pit 1.83 Mtr deep for 11 Mtr STP,with 1:4:8 Ratio cement, sand & first class brickballast0.285 cu mtr for 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering. |
| 142 | Providing and fixing of earth rod for earthing of support by G.I. Wire 6 SWG as per norms. (All material will be arranged by the contractor Like earth rod except 6 swg wire) |
| 143 | Nozeling and grouting of stay set. (All the civil material and stay set will be arranged by the contractor except Stay wire) |
| 144 | Painting of StructurePainting of 11 Mtr ST Pole with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 145 | Neutral standFabrication, erection and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 146 | Hoisting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of proper support and its clamping , providing long barral lugs 6 nos and P.G. Clamps & \\"Y\\" shape jumpering properly and 02 nos. supporting angle 65X65X6, 2800 mm as per RESSPO Norms. (All material will be supplied by the contractor like MS Pipe , P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2800 mm). |
| 147 | Hoisting of 11 KV Cable on existing/erected cable stand and on 11 KV incoming must be with proper size of G.I clamps ( In case of cable stand 02 clamp per cable and 01 no. clamp in case of incoming). The neutral of 11 KV cable inserted into lug must be tightend with the earth with the help of nut & bolt. In the case of cable stand All the phase of the cable must be connected with the P.G clamp to bus bar which must be made by cable size 11 KV 3x300 XLPE sq. mm. If it is double circuit cable hoisting, second circuit cable hoisted from the other side of the cable stand and same clamping would be done. |
| 148 | Supply & Laying of 6x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 149 | Supply & Laying of 4x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 150 | Supply & Laying of 2x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 151 | Special Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.I. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor) |
| 152 | Delta type Earthing of Power T/F Neutral Earthing of Power T/F Neutral by providing 03 No. of \\"B\\" class G.I. pipe 50 mm Dia 20 mtr long from ground upto the water level The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect and arrangement of G.I Pipe like delta it will be connected to eachother and Providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect. (All the material will be supplied by the contractor) |
| 153 | Construction of control cable trench of 200 mm wide and 300 mm deep with MS strip at a distance of 1mtr. With brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with MS strip. (All the material will be supplied by the contractor) |
| 154 | Construction of trench cover of 600 mm long and 75 mm thick for cable trench Including cost of material, labour and T&P. (All the material will be supplied by the contractor) |
| 155 | Painting of All switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 156 | Battery and Battery charger |
| 157 | Installation of 24 Volt Battery 200 AH ( 01 set=12 Nos, 2 Volt each with ISI 1651, IS nomenclature T 200 P) With its proper connection. |
| 158 | Installation of Input voltage 230 V, AC one phase 50 hertz, output 24 Volt , 40 Amp DC Battery charger with its proper connection. |
| 159 | Chemical and acid resistance cabinet which must be FRP materials. Stand /cabinet for battery set for proper stacking and storage (All the materials will be supplied by the contractor) |
| 160 | Earthing of battery charger connected with 25x6 G.I strip (All the materials will be supplied by the contractor) |
| 161 | Providing and fixing of P.G clamp for dog and connector. |
| 162 | Providing and fixing of copper L piece/connector ( for 05 MVA T/F) |
| 163 | 33 KV Bay Bus Bar & Stringing.Stringing of 33KV Bay Bus Bar by using and laying of ACSR Dog Conductor/panther including making Vertical/Horizontal (Y-shape) jumper connection through PG clamps and connecting all the equipments ( Bus isolator, P.I. , C.T. , VCB, L.A & T/F) with each other through connecting clamps. (All the material will be supplied by the contractor) |
| 164 | Shifting carefully and installation of Single/double Transformer Control pannel in control room and earthing of pannel on side and do proper connection. |
| 165 | Digging and locating the earth mat and do outdoor Structures earthing by G.I Flat. 50X6 mm the job include cutting, bending. (All the material will be supplied by the contractor.) |
| 166 | Commissioning and testing of 5 MVA T/F and its eqipments installed in switchyards and 11 KV Incoming and Outgoing Pannels complete in all respect upto energising |
| 167 | Providing of Rubber matting one side chequered and other side plane size1800x900x12 mm |
| 168 | providing of Hand gloves As per IS 4770 and tested potential 33 Kv. |
| 169 | Received back materials which is replaced and left over after erection it will be deposited to the respected to store centre in which the project location comes under. |
| 170 | Centrifuging of oil in 05 MVA TF |
| 171 | Replacement of damage oil seal /Packing |
| 172 | Supply and installation of Silica Gel with cabinet including breather |
| 173 | Providing & Replacement of Bushing rod HV for 05 MVA TF |
| 174 | Centrifuging of oil in 05 MVA TF |
| 175 | Sundries (Painting etc.) |
| 176 | Radiator wall welding (leakage fixing with gas welding or as per requirement etc) |
| 177 | Replacement of OTI&WTI |
| 178 | Breaking the concrete fencing/ Boundary wall in the switchyard of sub. Station for moving 05 MVA Transformer in switchyard after complition the work covered and restore the wall |
| 179 | INCREASING CAPACITY OF 33/11 KV SUB STATION MOHANGANJ FROM 2X10 MVA TO 2X10+5 MVA DISTT AMETHI Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump site proper stacking. |
| 180 | 33 KV Bus Isolator |
| 181 | 33 KV Lightening Arrestor |
| 182 | 90 lbs rail Pcs for T/F ( 44.64 Kg/m) |
| 183 | 33 KV VCB 800A, 750 MVA |
| 184 | Singe T/F control pannel |
| 185 | C.T. O/D 33 KV CTR 200/100/1-1A |
| 186 | 11 KV Incoming switch gear 600/300/5A, 350 MVA |
| 187 | 11 KV Out going switch gear 200/100/5A0250MVA |
| 188 | 11 KV 3 Core Cable 3x300 mm XLPE |
| 189 | 11 KV Cable 3x185 sq. mm XLPE |
| 190 | 11 KV cable jointing kit indoor 3x300 sq.mm. XLPE |
| 191 | 11 KV cable jointing kit outdoor 3x300 sq.mm. XLPE |
| 192 | 11 KV cable jointing kit indoor 3x185 sq.mm. XLPE |
| 193 | 11 KV cable jointing kit outdoor 3x 185 sq.mm. XLPE |
| 194 | 24 Volt Battery set |
| 195 | 24 Volt Battery charger |
| 196 | ACSR Dog Conductor |
| 197 | M.S. Channel 125x65 (for Structures) |
| 198 | M.S. Angle 75x75x6 (for Structures) |
| 199 | ST Pole 11 Mtr |
| 200 | M.S.Angle iron 65x65x6 bracing 2700 mm |
| 201 | 11 KV Top channel 100X50X 2240 mm |
| 202 | Dropper Channel 100x50 mm 2028 mm |
| 203 | 11 kv Polymer Pin insulator |
| 204 | 11 KV Disc insulator polymer 45 Kn |
| 205 | Stay wire 7/10 |
| 206 | 6 SWG G.I. Wire |
| 207 | M.S Top Channel 125x65x6 mm 3200 mm long |
| 208 | 11 KV Disc insulator B & S |
| 209 | Bracing angle 65x65x6 mm, 4300 mm long |
| 210 | 105 lbs rail piece/ R.S Joist 150x150 |
| 211 | Plinth of 5 MVA, 33/11 KV T/FsConstruction of Plinth of size 3.46x3.46 Mtr for 5 MVA T/F having not less than 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. (All the material will be supplied by the Contractor except rail Piece) |
| 212 | H.T. Cable LayingLaying & dressing of 11 KV, 3x300 and 3X185 Sq.mm XLPE cable underground from 05 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. (All the material will be supplied by the contractor) |
| 213 | Providing of 33 KV Post Insulator |
| 214 | Installation of Post Insulator Installation of post insulator on the post insulator structure . The work includes fabrication for proper fixing if required. |
| 215 | Installation Of CT Installation of CTs of ratio 200/100/1A on the CTs structure. The work includes fabrication for proper fixing if required. |
| 216 | Installation of Lightening ArrestorsAssembling and installation/ mounting of Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required. |
| 217 | Installation of Switchgears in Control roomShifting carefully and safely 11 Kv incoming Switchgear, 11 KV outgoing Switchgear and 11 KV Bus Coupler from out side of the switch gear room, as per direction of Engineer Incharge, Placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position and alignment and mountting of P.T. on incoming S/G. |
| 218 | Installation of Bus Isolators Assembling and installation of Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment and grising and oiling so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. |
| 219 | Installation of 33 KV VCBInstallation of 33 KV 750 MVA 800 Amp VCB on 33 KV VCB structure along with earthing by G.I. strip 50x6 mm size with main earthmat of Switchyards complete in all respect including commissioning. |
| 220 | Fixing and making Bus Bar connection in between I/C and O/G switchgears after cleaning and tapping with H.T. tape, Empire tape and PVC tape properly providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material Strictly to the satisfaction of site incharge. |
| 221 | Installation of Heat Shrinkable Type cable jointing kits indoor and O/D end Termination Joint suitable for 11 KV 3X300 & 3X185 XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. |
| 222 | Fabricatin Of CT/ Structure Fabrication of CT Structure as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.93 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allignment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc. (All the material will be supplied by the contractor except Steel Section) |
| 223 | Lightening Arrestor/ Post Insulator StructureFabrication of 1 No Lightening Arrestor structure & 1 set of Post Insulator structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.9 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc.(All the material will be supplied by the Contractor except steel) |
| 224 | Bus Isolator StructureFabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075x0.9x0.3 mtr 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Plinths of the Isolator structure shall be properly finished with champering of edges.(All the material will be supplied by the Contractor like M.S Flat etc. except steel) |
| 225 | Plinth for 33KV VCBConstruction of plinth of size 2.0x1.5x0.9 (Mtr) suitable for erection of super structure for 33 Kv VCB including grouting of Anchor bolts in proper allingment and level. Scope of work includes excavation of foundation base concreting in CC 1:6:12 ( cement, fine sand and brick ballast) 1st class brick work in cement mortor of ratio 1:4 CC in Ratio 1:4:8 and RCC work in ratio 1:2:4 ( Cement, coarse sand and stone grit of 20 mm gauge) as per Drawing |
| 226 | Cable stand StructureFabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 227 | Construction of 11 KV Double poleSafe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Double pole for 11 KV feeder on 11.0 Mtr ST Pole with fitting of necessary clamp & other acessories like 1 No Top channel ,Bracing angle 1 set., Disc insulator 3 No. and pin insulator 3 no. as per norms. (Contractor shall provide , necessary clamps, Disc Fitting, Nut - Bolts etc.) |
| 228 | Provding, fixing and mounting of following equipments (All the material will be supplied by the contractor) |
| 229 | 11 KV TPMO switch with holding clamps and fixing of chanel of M.S chanel 100x50x6 mm Y handle of TP must be G.I pipe. |
| 230 | 11 KV Fuse set with holding clamps and proper size of fixing channel. |
| 231 | Grouting of following structure by digging of pit 1.83 Mtr deep for 11 Mtr STP,with 1:4:8 Ratio cement, sand & first class brickballast0.285 cu mtr for 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering. |
| 232 | Providing and fixing of earth rod for earthing of support by G.I. Wire 6 SWG as per norms. (All material will be arranged by the contractor Like earth rod except 6 swg wire) |
| 233 | Nozeling and grouting of stay set. (All the civil material and stay set will be arranged by the contractor except Stay wire) |
| 234 | Painting of StructurePainting of 11 Mtr ST Pole with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 235 | Neutral standFabrication, erection and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 236 | Hoisting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of proper support and its clamping , providing long barral lugs 6 nos and P.G. Clamps & \\"Y\\" shape jumpering properly and 02 nos. supporting angle 65X65X6, 2800 mm as per RESSPO Norms. (All material will be supplied by the contractor like MS Pipe , P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2800 mm). |
| 237 | Hoisting of 11 KV Cable on existing/erected cable stand and on 11 KV incoming must be with proper size of G.I clamps ( In case of cable stand 02 clamp per cable and 01 no. clamp in case of incoming). The neutral of 11 KV cable inserted into lug must be tightend with the earth with the help of nut & bolt. In the case of cable stand All the phase of the cable must be connected with the P.G clamp to bus bar which must be made by cable size 11 KV 3x300 XLPE sq. mm. If it is double circuit cable hoisting, second circuit cable hoisted from the other side of the cable stand and same clamping would be done. |
| 238 | Supply & Laying of 6x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 239 | Supply & Laying of 4x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 240 | Supply & Laying of 2x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 241 | Special Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.I. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB,.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor) |
| 242 | Delta type Earthing of Power T/F Neutral Earthing of Power T/F Neutral by providing 03 No. of \\"B\\" class G.I. pipe 50 mm Dia 20 mtr long from ground upto the water level The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect and arrangement of G.I Pipe like delta it will be connected to eachother and Providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect. (All the material will be supplied by the contractor) |
| 243 | Construction of control cable trench of 200 mm wide and 300 mm deep with MS strip at a distance of 1mtr. With brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with MS strip. (All the material will be supplied by the contractor) |
| 244 | Construction of trench cover of 600 mm long and 75 mm thick for cable trench Including cost of material, labour and T&P. (All the material will be supplied by the contractor) |
| 245 | Painting of All switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 246 | Battery and Battery charger |
| 247 | Installation of 24 Volt Battery 200 AH ( 01 set=12 Nos, 2 Volt each with ISI 1651, IS nomenclature T 200 P) With its proper connection. |
| 248 | Installation of Input voltage 230 V, AC one phase 50 hertz, output 24 Volt , 40 Amp DC Battery charger with its proper connection. |
| 249 | Chemical and acid resistance cabinet which must be FRP materials. Stand /cabinet for battery set for proper stacking and storage (All the materials will be supplied by the contractor) |
| 250 | Earthing of battery charger connected with 25x6 G.I strip (All the materials will be supplied by the contractor) |
| 251 | 33 KV Bay Bus Bar & Stringing.Stringing of 33KV Bay Bus Bar by using and laying of ACSR Dog Conductor/panther including making Vertical/Horizontal (Y-shape) jumper connection through PG clamps and connecting all the equipments ( Bus isolator, P.I. , C.T. , VCB, L.A & T/F) with each other through connecting clamps. (All the material will be supplied by the contractor) |
| 252 | Shifting carefully and installation of Single/double Transformer Control pannel in control room and earthing of pannel on side and do proper connection. |
| 253 | Digging and locating the earth mat and do outdoor Structures earthing by G.I Flat. 50X6 mm the job include cutting, bending. (All the material will be supplied by the contractor.) |
| 254 | Commissioning and testing of 5 MVA T/F and its eqipments installed in switchyards and 11 KV Incoming and Outgoing Pannels complete in all respect upto energising |
| 255 | Providing of Rubber matting one side chequered and other side plane size1800x900x12 mm |
| 256 | providing of Hand gloves As per IS 4770 and tested potential 33 Kv. |
| 257 | Bus Bar GantryConstruction of of bus bar by Digging of 01 Nos Pits of size 2.2mt x1.4mt x 0.75 Mtr providing stone pad at the bottom of the trench and grouting of the one legs of the Bus Bar Gantry in CC ( cement, Coarse sand and stone grit of 20mm gauge) in the ratio 1:3:6 including supply of all T&P shuttering etc. in a block of size 2.2 mtx1.4 mtx0.75 mt. The work consists of dragging , shifting up to 40 mtr raising and erecting the two pre fabricated legs of Bus Gantry in proper allingment level and plumb. Both the plinths of the termainal gantry shall be properly finished with champering of edges. The work includes fabrication of Bus Bar Gantry 6.23 MtrLong as per RESPO drawing no.38 ( Set of 2) (All materials provided by the contractor except dog conductor , steel and disc insulator .) |
| 258 | Laying and Fixing of Interlocking Bricks in the Switchyard size 25x30 Mtr and Making approach path with bricks works on both side and interlocking on top and Proper leveling and finishing etc. |
| 259 | Received back materials which is replaced and left over after erection it will be deposited to the respected to store centre in which the project location comes under. |
| 260 | Centrifuging of oil in 05 MVA TF |
| 261 | Replacement of damage oil seal /Packing |
| 262 | Supply and installation of Silica Gel with cabinet including breather |
| 263 | Providing & Replacement of Bushing rod HV for 05 MVA TF |
| 264 | Centrifuging of oil in 05 MVA TF |
| 265 | Sundries (Painting etc.) |
| 266 | Radiator wall welding (leakage fixing with gas welding or as per requirement etc) |
| 267 | Replacement of OTI&WTI |
| 268 | Filling in the switchyard of size 25x30 mtr including cost of earth handling and cartage upto switchyard from outside with its unloading and laying in the yard, leveling ,watering and ramming till its campactness |
| 269 | Earth Mat Work -Laying of earth mat in the switchyard by laying of M.S. Round of 32 mm dia in 750 mm deep trenches with M.S. Round 32 mm dia & Connecting each other 35x5 mm G.I. Strip and overlapping 25x5 mm G.I. Strip , 3 Mtr. Long earth elecrodes Grounded & Connecting each other as per drawing . The work includes welding of the M.S. Round, Connecting all steel strutures in the switchyard with the earth mat by means of G.I. Strip of size 50x6 mm as per Item below (M.S. Round bar 32 mm layed in 30x25 meter square area in 6 mtr and 3 mtr. intervel as per drawing no. Res-43 |
| 270 | Digging of trench of size 500x750mm for laying of 32mm Dia MS round including refilling of earth and ramming the same after laying of MS round/G.S. strip |
| 271 | Laying and welding of lap joints of MS round of 32mm Dia with minimum 150mm overlaping. The MS round shall be welded on both side so as to fill the wedges completely using high quality Arc welding and goodwork Manship. The Joint shall be covered with black bitumen paint |
| 272 | Fabrication of 32mm Dia MS round 3 Mtrlong earth electrodes and driving them into ground so that tip of the electrodes remains atleast 750mm below the ground level and Jointing of earth electrodes 32 mm Dia with the earth mat using high quality Arc welding and goodworkman ship |
| 273 | Jointing of MS round 32 mm Dia in earth mat at cross joints using high quality Arc welding . A 75mm piece of 32 mm Dia MS round shall also be welded to make the joint strong for carrying fault current. The joints shall be covered with black Bitumen Paint |
| 274 | Providing and laying of G.S. strip of size 50x6mm for connecting the earth mat with the super structure, Security fencing post, Including digging of trench 500x500 mm bending, cutting, straightening and welding of the earth strip with the earth mat and various street structure using high quality Arc welding. The work include proper overlapping of the strip and Jointing By weldiing |
| 275 | Construction of retaining wall around the 33KV switchyard in size (30+25)x2 mtr using first class bricks, local river sand and brick ballast which includes the following works( Including cost of 1st class brick, brick ballast sand/core sand cement etc.) |
| 276 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 277 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 278 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) :With F.P.S.(non modular) bricks |
| 279 | CEMENT PLASTER (IN FINE SAND) 1:6 (1 cement: 6 fine sand) |
| 280 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 281 | Fabrication of switchyard fencing by welded mesh with gate in size (25+30)x2 MTR by 10 swg wire mesh , MS angle 50X50X6, MS flat 25x5mm and 40X5mm, Its fitting tightining with nuts and bolt on the studs. Supported by drilling the required poll along with fabrication of 1 No. gate m/o MS angle. ( 110 RMT (L)x1.8 mtr(H) |
| 282 | Providing round bar 32 mm |
| 283 | Providing and fixing of P.G clamp for dog/panther and connector. |
| 284 | Providing and fixing of copper L piece/connector ( for 05 MVA T/F) |
| 285 | Breaking the concrete fencing/ Boundary wall in the switchyard of sub. Station for moving 05 MVA Transformer in switchyard after complition the work covered and restore the wall |
| 286 | Earthing of all outdoor equipments by proving and laying G.I strip 50x6 mm including cutting welding , Binding etc. |
| 287 | Earthing of 11KV & 33KV SwitchgearLaying of earth mat for earthing of indoor equipments by means of M.S. Strip 50x6mm Connecting to 4 Nos. earthing electrodes of 32 mm (including fabrication of earthing electrodes) 3 Mtr long on each side (as per RESPO Drawing RES-40). This work includes driving of eath electrodes deep down into the earth so that its TOP remains 500 mm below ground level. The work include laying, bending, welding of M.S. earth strips 50 x 6 mm in the control room and connecting to both side squares. |
| 288 | INCREASING CAPACITY OF 33/11 KV SUB STATION BHADAR FROM 5+8 MVA TO 8+10 MVA DISTT AMETHI Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump site proper stacking. |
| 289 | 90 lbs rail Pcs for T/F ( 44.64 Kg/m) |
| 290 | 11 KV 3 Core Cable 3x300 mm XLPE |
| 291 | 33 KV Single T/F control pannel |
| 292 | 11 KV cable jointing kit indoor 3x300 sq.mm. XLPE |
| 293 | 33 KV Lightening Arrestor |
| 294 | 11 KV cable jointing kit outdoor 3x300 sq.mm. XLPE |
| 295 | 24 Volt Battery set |
| 296 | 24 Volt Battery charger |
| 297 | ACSR Dog Conductor |
| 298 | M.S. Channel 125x65 (for Structures) |
| 299 | M.S. Angle 75x75x6 (for Structures) |
| 300 | Opening of all the 33 KV Jumpers, Neutral connections, cable connections, opening of earth strips and then shifting of 5 MVA T/F from plinth to Other side (Temporary Plinth) in yard. |
| 301 | Shifting 33 KV Jumpers, from actual position to the new shifted place along with 11 KV cable and other accessories and ensure shifted 05 MVA T/F must be at temporary plinth and energised with full protection system (Activate WTI,OTI,E/F,O/C,Buchole etc ) in the presence of supervise division representative. Test report/certificate that 05 MVA T/F is energised with protection system will be provided to JE (W) afterwards maintain and restore the s/s supply. |
| 302 | Plinth of 10 MVA, 33/11 KV T/FsExpansion and repairing of Plinth of size 3.46x3.46 Mtr for 10 MVA T/F having not less than 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. (All the material will be supplied by the Contractor except rail Piece) |
| 303 | H.T. Cable LayingLaying & dressing of 11 KV, 3x300 Sq.mm XLPE cable underground from 10 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. (All the material will be supplied by the contractor) |
| 304 | Installation of Lightening ArrestorsAssembling and installation/ mounting of Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required. |
| 305 | Installation of Heat Shrinkable Type cable jointing kits indoor and O/D end Termination Joint suitable for 11 KV 3X300 cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. |
| 306 | Cable stand StructureFabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 307 | Neutral standFabrication erection and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 308 | Supply & Laying of 6x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 309 | Supply & Laying of 4x2.5 sq.mm. armoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 310 | Supply & Laying of 2x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 311 | Battery and Battery charger |
| 312 | Installation of 24 Volt Battery 200 AH ( 01 set=12 Nos, 2 Volt each with ISI 1651, IS nomenclature T 200 P) With its proper connection. |
| 313 | Installation of Input voltage 230 V, AC one phase 50 hertz, output 24 Volt , 40 Amp DC Battery charger with its proper connection. |
| 314 | Chemical and acid resistance cabinet which must be FRP materials. Stand /cabinet for battery set for proper stacking and storage (All the materials will be supplied by the contractor) |
| 315 | Earthing of battery charger connected with 25x6 G.I strip (All the materials will be supplied by the contractor) |
| 316 | Special Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.I. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor) |
| 317 | Delta type Earthing of Power T/F Neutral Earthing of Power T/F Neutral by providing 03 No. of \\"B\\" class G.I. pipe 50 mm Dia 20 mtr long from ground upto the water level The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect and arrangement of G.I Pipe like delta it will be connected to eachother and Providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect. (All the material will be supplied by the contractor) |
| 318 | Hoisting of 11 KV Cable on existing/erected cable stand and on 11 KV incoming must be with proper size of G.I clamps ( In case of cable stand 02 clamp per cable and 01 no. clamp in case of incoming). The neutral of 11 KV cable inserted into lug must be tightend with the earth with the help of nut & bolt. In the case of cable stand All the phase of the cable must be connected with the P.G clamp to bus bar which must be made by cable size 11 KV 3x300 XLPE sq. mm. If it is double circuit cable hoisting, second circuit cable hoisted from the other side of the cable stand and same clamping would be done. |
| 319 | Painting of All switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 320 | 33 KV Bay Bus Bar & Stringing.Stringing of 33KV Bay Bus Bar by using and laying of ACSR Dog Conductor/panther including making Vertical/Horizontal (Y-shape) jumper connection through PG clamps and connecting all the equipments ( Bus isolator, P.I. , C.T. , VCB, L.A & T/F) with each other through connecting clamps. (All the material will be supplied by the contractor) |
| 321 | Digging and locating the earth mat and do outdoor Structures earthing by G.I Flat. 50X6 mm the job include cutting, bending. (All the material will be supplied by the contractor.) |
| 322 | Commissioning and testing of 10 MVA T/F and its eqipments installed in switchyards and 11 KV Incoming and Outgoing Pannels complete in all respect upto energising |
| 323 | Received back materials which is replaced and left over after erection it will be deposited to the respected to store centre in which the project location comes under. |
| 324 | Breaking the concrete fencing/ Boundary wall in the switchyard of sub. Station for moving 10 MVA Transformer in switchyard after complition the work covered and restore the wall |
| 325 | Reparing and maintenance if required do replacement of electrical and machnical components of 02 No. control pannel.,02 No Bus isolator &02 No 33 KV VCB ( i.e, Tripping coil, Tripping rod, MCB, Vaccum interrupter, Relay, replacement of damage internal wiring etc.) and do over overhaling of all mechanical parts of 33 KV VCB for proper mechanism work. |
| 326 | Shifting carefully and installation of Single/double Transformer Control pannel in control room and earthing of pannel on side and do proper connection. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail