| 1 | Supply of Material |
| 2 | Holding clamp with nut and bolts |
| 3 | Lug 70 sqmm |
| 4 | LT piercing connector |
| 5 | Nut and bolts of various size |
| 6 | LT shackle insulator |
| 7 | LT clamp for PCC pole |
| 8 | X-Arm holding clamp with nut and bolts |
| 9 | Dead end clamp |
| 10 | PG clamp |
| 11 | J Hook |
| 12 | Suspension clamp |
| 13 | Eye Hook |
| 14 | Stone pad |
| 15 | F- Bracket for top insulator with nut and bolts |
| 16 | Dropper angle holding clamp |
| 17 | E- Bracket with nut and bolts |
| 18 | GI Barbed wire |
| 19 | Danger board with clamp |
| 20 | Copper L-Piece 62x225x12 mm |
| 21 | Erection of Works |
| 22 | Safe Loading, unloading and carriage from Store Center Chilbila Pratapgarh to different work site (Distance 10-70 K.M.) and erection of 8.5 meter PCC Pole with complete fitting as per respo norms. |
| 23 | Safe Loading, unloading and carriage from Store Center Chilbila Pratapgarh to different work site (Distance 10-70 K.M.) and erection of 11 meter STP Pole with complete fitting as per respo norms. |
| 24 | Safe Loading, unloading and carriage of other line and transformer materials as per estimate from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.). |
| 25 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Double Pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 26 | Stringing and Sagging of 11 kv line in three phase wire on 8.5 meter PCC Pole or 11 mtr STP pole with ACSR weasel conductor or ACSR Dog conductor as per estimate and binding with insulator as per respo norms. |
| 27 | Stringing and Sagging of one phase extra wire on existing 11 kv line of two phase wire for converting the line in three phase wire on 8.5 meter PCC Pole with ACSR weasel conductor and binding with insulator as per respo norms. |
| 28 | Laying of LT AB cable size 3x50+1x35+1x16 sq. mm. Overhead With all fittings as per respo norms for construction of LT line on existing or erected 8.5 mtr PCC Pole. |
| 29 | Laying of LT AB cable size 3x95+1x70+1x16 and 3x120+3x95+1x16 sq. mm. Overhead With all fittings as per respo norms for construction of LT line on existing or erected 8.5 mtr PCC Pole. |
| 30 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different site various size T/F and instalation of double pole. |
| 31 | 25 KVA |
| 32 | 63 KVA |
| 33 | 100 KVA |
| 34 | 250 KVA |
| 35 | Construction of pilinth for 250 KVA Transformer size 1.5*1.5*1.75 Meter with materials (All Material Provide by Contractor) |
| 36 | Two No. Earthing at each 250 KVA T/F pipe Earthing (All Material Provide by Contractor) |
| 37 | Fancing around the pilinth 2X2X1.5 Meter with gate (All Material Provided by Contractor) as per respo norms |
| 38 | Erection of Complete stay set with grouting and nozzaling |
| 39 | Supply and instalation of Tailless unit Please Enable Macros to View BoQ information |