| 1 | Earth work excavation of foundation in stoney earth and gravel mixed with stone boulders with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed. |
| 2 | Supplying and filling in with clean coarse river sand in foundation and plinth including ramming consolidating with all cost of materials, labour, T. & P. etc. complete. |
| 3 | Plain cement concrete (1:3:6) using 40 mm. size hard crusher broken granite stone metal of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. |
| 4 | Reinforced Cement Concrete of M-20 grade using 20 mm and down size hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. with cost of centering and shuttering for the work etc all complete to required levels laid in layers including cost, conveyance, royalities & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per Direction of the Engineer in charge. |
| 5 | Cutting, bending, binding of coiled/bend up M.S. deformed / Tor steel reinforcement including hoisting lowering, placing in position the grills for concreting with all cost of materials, labour, T. & P. etc. complete (Cost of steel included) |
| 6 | Providing rigid and smooth centering and shuttering for C.C. works including false works and dismantling them after casting including cost of material etc. all complete in all respect as per the Direction of the engineer in charge. |
| 7 | Providing 12mm. thick cement plaster in cm (1:4) over CC work including racking out joints finished smooth with proper line and plumb with neat cement punning and watering for curing with all cost of materials, labour T.& P. etc. all complete in all respect as per specification and direction of Engineer-in-Charge. |
| 8 | Painting two coats of synthetic enamel paint of approved quality and approved shade confirming to ISI on steel work to give an even shade including sand papering and making the surface smooth in all floors at all heights including cost, conveyance, taxes of all materials, labour, sundries, T& P scaffolding required for the work and complete in all respect over a coat of primer as per specifications and directions of Engineer-in-charge. |
| 9 | Supplying,laying of vetrified tiles on floor over 25mm thick cement mortar (1:1) to proper level including jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost,conveyance,royality of all materials including all labour & T&P charges etc complete as per the direction of the engineer-in-charge.(Chequred Tile) |
| 10 | Supplying fiting and fixing vetrified tile in rises of steps, dados & skirting on 12mm thick cement plaster (1:3) to proper level including jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost,conveyance,royality of all materials including all labour & T&P charges etc complete as per the direction of the engineer-in-charge.(Chequred Tile) |
| 11 | Providing and fixing in position 2 (two) seaters designer bench of approved design and make of minimum area 1.20mtr x 0.60mtr over all minimum height of 0.80mtr consisting of cement concrete including all of materials and labour etc complete. |
| 12 | Conveyance of excavated materials by mechanical means within 5k.m. lead with loading and unloading. |
| 13 | Unforeseen items. |
| 14 | Provision of photographs at different stage of execution of the work. |
| 15 | Display board. Please Enable Macros to View BoQ information |