| 1 | Dismantling and removing cement concrete including stacking the useful materials for re-use and removing the debris away from the work site as per direction of the Engineer-in-charge. |
| 2 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. |
| 3 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. |
| 4 | Cement concrete (M-15) with 40mm size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, niddle vibrator, plate vibrator, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 5 | CC/RCC (M-15) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 6 | RCC (M-25) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. |
| 7 | Rigid smooth centering & shuttering for CC/RCC works (Cut off and Raft) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. |
| 8 | Base of Column, Foundation, Plinth Band, Footing, Mass concrete etc. |
| 9 | Supplying, fitting & placing in position uncoated HYSD bar for M.S. reinforcement for RCC work including straightening, cutting, bending, binding and tying the rails and placing in position including cost, carriage & all other taxes of M.S. steel & binding wire 18 to 20 gauge etc. complete as per direction of the Engineer-in-charge. |
| 10 | Earth work in all kinds of soil excluding sand or sandy soil with mechanical carriage 5 k.m lead including rough dressing and benching old embankment and breaking clods 5cm to7 cm laying in layers not exceeding 0.30m depth. As per direction of Engineer-in -charges.( Royality shall be deduct from earth filling section )(Measurement to be taken on the finished compacted section & Earth shall be arranged by the contractor at his own cost & risk ) |
| 11 | Providing,lying and spreading compacting I.R.C. Grade-I metal (90mm to 45mm) to water bound macadam specification including spreading in uniform thickness hand packing and rolling with 3 wheeled steel roller 8-10 tonnes in stage to proper grade and camber applying and brooming using crusher dust as binding materials to fill up the interstices with coarse aggregate, watering and compacting to the required density including cost, conveyance, royalty, labour charges etc. complete as per direction of the Engineer-in-charge. |
| 12 | Collecting, supplying, stacking, spreading and compacting I.R.C. Grade-III metal (53mm to 22.4mm) to water bound macadam specification including spreading in uniform thickness hand packing and rolling with 3 wheeled steel roller 8-10 tonnes in stage to proper grade and camber applying and brooming including filling the interstices with stone screen dust with watering and compacting to the required density as per clauses 404 of MOSRT & H specification including cost, conveyance, royalty, labour charges etc. complete as per direction of the Engineer-in-charge. |
| 13 | Providing laying and spreading good stone screen dust of approved quality from approved quarry including cost, carriage, royalty & labour charges and spreading the same on road surface watering and consolidation with PRR including hire & running charges of PRR & watering etc.complete as per direction of theEngineer-in-charge. Please Enable Macros to View BoQ information |