| 1 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 3 | Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 4 | Fitting and erecting 9M PSC pole with out V cross arm,pin insulator and fclamp for AB Cable stringing |
| 5 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 6 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 7 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 8 | Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil. |
| 9 | Fitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil. |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in HardLaterite. |
| 11 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 12 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmmwith bare/insulated Messenger through existing poles |
| 13 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling. |
| 14 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at a minimum distanceof 1.5m away from the pole/structure and maintaining standard distancebetween different earth pipes in ordinary soil & backfilling.. |
| 15 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite |
| 16 | Additional rate for excavation of one Earth Pit (2.5m depth) in HardLaterite. |
| 17 | Erection of suspension clamp for 11KV ABC of any size |
| 18 | Doing one cable end termination on HT ABC of sizes Up to3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentallyincluding charges for cable jointer etc. complete as per the direction of thedepartmental officers. |
| 19 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 20 | Fiting One no MVT on existing cross arm including 2 nos endtermination (for One phase) of any rating for 11 kV AB Cable |
| 21 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), inexisting 11kV DP including conveyance of materials. |
| 22 | Dismantling (without damage) one km 11kV line (three conductors)including dismantling cross arm, insulators, disc, disconnecting jumperconnection, rolling the conductor and stacking the materials. |
| 23 | Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision ofearthing). |
| 24 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). Please Enable Macros to View BoQ information |