| 1 | Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision ofearthing) |
| 2 | Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 3 | Dismantling (without damage) one 11kV PSC/RCC pole afterdisconnecting stays, strut etc. attached thereon and stacking the same |
| 4 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 5 | Erection of suspension clamp for 11KV ABC of any size |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges. |
| 7 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 8 | Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle). |
| 9 | Fitting and erecting 9M PSC pole with out V cross arm,pin insulator and fclamp for AB Cable stringing |
| 10 | Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil. |
| 11 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 12 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete. |
| 13 | Additional rate for excavation of one Pit for HT Pole/HT Stay in HardLaterite. |
| 14 | Additional rate for excavation of one Pit for HT Pole/HT Stay in SoftRock. |
| 15 | Straightening one slanted 11kV pole after unbinding the line and bindingthe line after work. |
| 16 | Fitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil. |
| 17 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling. |
| 18 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at a minimum distanceof 1.5m away from the pole/structure and maintaining standard distancebetween different earth pipes in ordinary soil & backfilling. |
| 19 | Dismantling (without damage) one km 11kV line (three conductors)including dismantling cross arm, insulators, disc, disconnecting jumperconnection, rolling the conductor and stacking the materials. |
| 20 | Fiting One no MVT on existing cross arm including 2 nos endtermination (for One phase) of any rating for 11 kV AB Cable |
| 21 | Doing one cable end termination on HT XLPE UG cables of sizes uptoand including 3x185 sqmm using the cable jointing kit supplieddepartmentally after making fencing, caution board and all other safetymeasures including charges for cable jointer etc. complete as per thedirection of the departmental officers. |
| 22 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials. |
| 23 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmmwith bare/insulated Messenger through existing poles Please Enable Macros to View BoQ information |