| 1 | 14 HP Air Cooled Outdoor Condensing Unit Supply | Supply and delivery of 14 HP air cooled outdoor condensing unit with inverter scroll compressor condenser coil high static fan microprocessor control panel PCB cooling feature auto bypass for centralized control suitable for 55 degree ambient and 82 Pascal static pressure |
| 2 | 20 HP Air Cooled Outdoor Condensing Unit Supply | Supply and delivery of 20 HP air cooled outdoor condensing unit with inverter scroll compressor condenser coil high static fan microprocessor control panel PCB cooling feature auto bypass for centralized control suitable for 55 degree ambient and 82 Pascal static pressure |
| 3 | 24 HP Air Cooled Outdoor Condensing Unit Supply | Supply and delivery of 24 HP air cooled outdoor condensing unit with inverter scroll compressor condenser coil high static fan microprocessor control panel PCB cooling feature auto bypass for centralized control suitable for 55 degree ambient and 82 Pascal static pressure |
| 4 | 14 HP Outdoor Unit Installation Testing Commissioning | Installation testing and commissioning of 14 HP air cooled VRF outdoor condensing unit including all necessary connections refrigerant piping nitrogen pressure testing vacuumization electrical termination trial run and commissioning complete as required |
| 5 | 20 HP Outdoor Unit Installation Testing Commissioning | Installation testing and commissioning of 20 HP air cooled VRF outdoor condensing unit including all necessary connections refrigerant piping nitrogen pressure testing vacuumization electrical termination trial run and commissioning complete as required |
| 6 | 24 HP Outdoor Unit Installation Testing Commissioning | Installation testing and commissioning of 24 HP air cooled VRF outdoor condensing unit including all necessary connections refrigerant piping nitrogen pressure testing vacuumization electrical termination trial run and commissioning complete as required |
| 7 | 1.5 TR 4 Way Cassette Indoor Unit Supply | Supply of 1.5 TR VRF 4 way cassette indoor unit with cooling capacity 12 kW and above power input 110 to 125 W airflow 1800 to 2000 cubic metres per hour noise level less than 35 dB at low speed with mandatory auto bypass feature |
| 8 | 4 TR 4 Way Cassette Indoor Unit Supply | Supply of 4 TR VRF 4 way cassette indoor unit with adequate cooling capacity power input airflow 1800 to 2000 cubic metres per hour noise level less than 35 dB at low speed with mandatory auto bypass feature as per specifications |
| 9 | 1.5 TR 4 Way Cassette Indoor Unit Installation | Installation testing and commissioning of 1.5 TR VRF 4 way cassette indoor unit including mounting electrical termination control wiring drain piping connection trial run and commissioning complete as required |
| 10 | 4 TR 4 Way Cassette Indoor Unit Installation | Installation testing and commissioning of 4 TR VRF 4 way cassette indoor unit including mounting electrical termination control wiring drain piping connection trial run and commissioning complete as required |
| 11 | 3 TR Split DX Cassette Air Conditioning System Supply | Supply of 3 TR split type direct expansion air conditioning system with 4 way ceiling mounted cassette indoor unit and matching air cooled outdoor unit hermetically sealed scroll compressor condenser and evaporator coil drain pump remote control suitable for 50 degree ambient |
| 12 | 3 TR Split DX AC System Installation Testing Commissioning | Installation testing and commissioning of 3 TR split type cassette DX air conditioning system including mounting of indoor and outdoor units vibration isolation pads electrical termination control wiring drain piping nitrogen pressure testing vacuumization refrigerant charging and trial run |
| 13 | Centralized Remote Controller Unit Supply | Supply of centralized remote controller unit of same make as AC units for centralized control and monitoring of all connected VRF indoor and outdoor units complete with all accessories as recommended by manufacturer |
| 14 | Centralized Remote Control Unit Installation Testing Commissioning | Installation testing and commissioning of centralized remote control unit for VRF system including all wiring connections configuration of connected indoor and outdoor units testing and commissioning complete as required |
| 15 | 25.4mm OD Copper Refrigerant Pipe Supply | Supply of 25.4 mm OD hard drawn copper refrigerant piping tube thickness 1.2 mm with ring type hanger supports and 19 mm thick XLPE Class O closed cell elastomeric nitrile rubber tubular insulation for suction and liquid lines complete with fittings and accessories |
| 16 | 22.2mm OD Copper Refrigerant Pipe Supply | Supply of 22.2 mm OD hard drawn copper refrigerant piping tube thickness 1.2 mm with ring type hanger supports and 19 mm thick XLPE Class O closed cell elastomeric nitrile rubber tubular insulation for suction and liquid lines complete with fittings and accessories |
| 17 | 19mm OD Copper Refrigerant Pipe Supply | Supply of 19 mm OD hard drawn copper refrigerant piping tube thickness 1.2 mm with ring type hanger supports and 19 mm thick XLPE Class O closed cell elastomeric nitrile rubber tubular insulation for suction and liquid lines complete with fittings and accessories |
| 18 | 15.86mm OD Copper Refrigerant Pipe Supply | Supply of 15.86 mm OD soft drawn copper refrigerant piping tube thickness 1.2 mm with ring type hanger supports and 19 mm thick XLPE Class O closed cell elastomeric nitrile rubber tubular insulation for suction and liquid lines complete with fittings and accessories |
| 19 | 12.7mm OD Copper Refrigerant Pipe Supply | Supply of 12.7 mm OD soft drawn copper refrigerant piping tube thickness 1.2 mm with ring type hanger supports and 19 mm thick XLPE Class O closed cell elastomeric nitrile rubber tubular insulation for suction and liquid lines complete with fittings and accessories |
| 20 | 9.5mm OD Copper Refrigerant Pipe Supply | Supply of 9.5 mm OD soft drawn copper refrigerant piping tube thickness 1.2 mm with ring type hanger supports and 19 mm thick XLPE Class O closed cell elastomeric nitrile rubber tubular insulation for suction and liquid lines complete with fittings and accessories |
| 21 | 25.4mm OD Copper Pipe Installation Testing Commissioning | Installation testing and commissioning including vacuumization and nitrogen testing of 25.4 mm OD hard drawn copper refrigerant piping for VRF system with all fittings supports and accessories as required |
| 22 | 22.2mm OD Copper Pipe Installation Testing Commissioning | Installation testing and commissioning including vacuumization and nitrogen testing of 22.2 mm OD hard drawn copper refrigerant piping for VRF system with all fittings supports and accessories as required |
| 23 | 19mm OD Copper Pipe Installation Testing Commissioning | Installation testing and commissioning including vacuumization and nitrogen testing of 19 mm OD hard drawn copper refrigerant piping for VRF system with all fittings supports and accessories as required |
| 24 | 15.86mm OD Copper Pipe Installation Testing Commissioning | Installation testing and commissioning including vacuumization and nitrogen testing of 15.86 mm OD soft drawn copper refrigerant piping for VRF system with all fittings supports and accessories as required |
| 25 | 12.7mm OD Copper Pipe Installation Testing Commissioning | Installation testing and commissioning including vacuumization and nitrogen testing of 12.7 mm OD soft drawn copper refrigerant piping for VRF system with all fittings supports and accessories as required |
| 26 | 9.5mm OD Copper Pipe Installation Testing Commissioning | Installation testing and commissioning including vacuumization and nitrogen testing of 9.5 mm OD soft drawn copper refrigerant piping for VRF system with all fittings supports and accessories as required |
| 27 | VRF Refrigerant Y and T Joints with Insulation Supply | Supply of refrigerant Y and T joints VRV refnuts joints with insulation as recommended by manufacturer suitable for combination of indoor and outdoor machines for VRF system complete with all accessories |
| 28 | VRF Refrigerant Y and T Joints Installation Testing Commissioning | Installation testing and commissioning of refrigerant Y and T joints VRV refnuts joints with insulation as recommended by manufacturer for VRF system complete with all accessories as required |
| 29 | 3 Core 2.5 Sqmm Cu Shielded Communication Cable Supply | Supply and delivery of 3 core x 2.5 sq mm copper shielded communication cable with ISI mark PVC conduit as required as per site condition for AC system control and communication wiring complete with all necessary fittings |
| 30 | 4 Core 2.5 Sqmm Cu Shielded Communication Cable Supply | Supply and delivery of 4 core x 2.5 sq mm copper shielded communication cable with ISI mark PVC conduit as required as per site condition for AC system control and communication wiring complete with all necessary fittings |
| 31 | 2 Core 1.5 Sqmm Cu Shielded Communication Cable Supply | Supply and delivery of 2 core x 1.5 sq mm copper shielded communication cable with ISI mark PVC conduit as required as per site condition for AC system control and communication wiring complete with all necessary fittings |
| 32 | 3 Core 2.5 Sqmm Cu Cable Laying | Laying of 3 core x 2.5 sq mm copper shielded communication cable with ISI mark PVC conduit bundled properly neatly aligned with refrigerant piping well supported at specific intervals as per site requirement and instructions |
| 33 | 4 Core 2.5 Sqmm Cu Cable Laying | Laying of 4 core x 2.5 sq mm copper shielded communication cable with ISI mark PVC conduit bundled properly neatly aligned with refrigerant piping well supported at specific intervals as per site requirement and instructions |
| 34 | 2 Core 1.5 Sqmm Cu Cable Laying | Laying of 2 core x 1.5 sq mm copper shielded communication cable with ISI mark PVC conduit bundled properly neatly aligned with refrigerant piping well supported at specific intervals as per site requirement and instructions |
| 35 | PVC Condensate Drain Pipe with Insulation Supply | Supply of PVC condensate drain pipe of suitable size for AC indoor units with supports clamps and insulation as required complete with all accessories as per instructions |
| 36 | PVC Condensate Drain Pipe Installation | Installation of PVC condensate drain piping for AC indoor units with supports clamps and all accessories as per site requirement and instructions complete as required |
| 37 | MS Table Top Stands for Outdoor Units Supply | Supply of MS table top stands for installing outdoor units VRF outdoor 10 units and DX outdoor 1 unit duly epoxy coated including supply of cowl piece for each outdoor machine as required |
| 38 | MS Table Top Stands for Outdoor Units Installation | Installation testing and commissioning of MS table top stands for outdoor units including installation testing and commissioning of cowl piece for each outdoor machine as required |
| 39 | Refrigerant Gas R410A Supply and Filling | Supply and filling of refrigerant gas R410A as required for VRF and DX air conditioning systems complete with all accessories as per manufacturer recommendations and site requirements |
| 40 | 4 Core 10 Sqmm XLPE Armoured Copper Cable Supply | Supply of 4 core x 10 sq mm copper conductor XLPE insulated PVC sheathed armoured cable 1.1 kV grade conforming to IS 7098 Part 1 for outdoor unit power supply complete as required |
| 41 | 4 Core 16 Sqmm XLPE Armoured Copper Cable Supply | Supply of 4 core x 16 sq mm copper conductor XLPE insulated PVC sheathed armoured cable 1.1 kV grade conforming to IS 7098 Part 1 for outdoor unit power supply complete as required |
| 42 | 4 Core 10 Sqmm XLPE Cable Laying Testing Commissioning | Laying testing and commissioning of 4 core x 10 sq mm copper XLPE armoured cable 1.1 kV grade from ODU power distribution board to outdoor units in cable tray trench on wall through shaft with dressing clamping brass glands aluminium lugs and termination complete |
| 43 | 4 Core 16 Sqmm XLPE Cable Laying Testing Commissioning | Laying testing and commissioning of 4 core x 16 sq mm copper XLPE armoured cable 1.1 kV grade from ODU power distribution board to outdoor units in cable tray trench on wall through shaft with dressing clamping brass glands aluminium lugs and termination complete |
| 44 | Aluminium Anodized Partition for AC Enclosure | Providing fabricating and fixing aluminium anodized partition for air conditioning enclosure using approved aluminium sections with 15 micron anodized finish comprising fixed glazed panels and aluminium framed glazed doors with 5 mm clear float glass door shutters frames floor springs hinges handles locks rubber beading and all accessories |
| 45 | Light Point Wiring in PVC Casing and Capping | Wiring in PVC casing and capping system using 2 x 1.5 sq mm FR PVC insulated copper conductor wire with modular type switches sockets surface mounting plastic frames for light point to be terminated in ceiling rose or batten or angle holder 6 Amp 230 Volts for LED panel light fitting |
| 46 | 2x2 LED Luminaire 24W Recess Surface Mounted Supply | Supply and delivery of recess or surface mounted 2 x 2 luminaire 24 W with 150 lm per watt low glare and CRI greater than 90 for hospital ward and corridor lighting as per instructions |
| 47 | LED Panel 2x2 24W Installation Testing Commissioning | Installation testing and commissioning of LED panel 2 x 2 24 watts to be installed at male and female ward and corridors of hospital as per instructions |
| 48 | 4C 50 Sqmm XLPE Armoured Copper Cable Supply | Supply and delivery of 4 core x 50 sq mm XLPE insulated armoured PVC sheathed heavy duty copper conductor cable 1100 volts grade conforming to IS 1554 or IS 7098 Part 1 of 1988 complete as required |
| 49 | GI Wire 8 SWG Supply and Delivery | Supply and delivery of galvanized iron wire size 8 SWG for earthing and cable support as per specifications and instructions |
| 50 | Armoured Cable Laying on Wall for AC Power DB | Installation charges for fixing and running armoured cables with copper conductors 1100 volts grade on even surfaced walls beams ceilings with appropriate GI saddles and GI spacers with GI wire from central switch chamber to AC power MCBDB at electrical switch room |
| 51 | 4C 50 Sqmm Cable End Termination Both Ends | Cable end termination both ends for LV XLPE armoured 4 core x 50 sq mm cable including supply and fixing of double compression cable glands stripping of insulation tinned plated copper lugs for all phases crimping GI nut bolts and washers HDGI 80 micron one set per termination |
| 52 | TPN Distribution Board 8 Way HVAC ODU | Supply installation testing and commissioning of three pole and neutral distribution board in sheet steel enclosure IP 43 powder coated double door horizontal surface or recess mounting with insulated tinned copper bus bars neutral links DIN channels earthing terminals 8 way 8 plus 24 way without MCB |
| 53 | FP Isolator 125 Amp SITC | Supply installation testing and commissioning of four pole isolator 125 Amp in suitable enclosure for HVAC outdoor unit distribution board as per specifications and instructions |
| 54 | FP MCB 63 Amp SITC | Supply installation testing and commissioning of four pole MCB 63 Amp for HVAC outdoor unit distribution board as per specifications and instructions |
| 55 | FP MCB 40 Amp SITC | Supply installation testing and commissioning of four pole MCB 40 Amp for HVAC outdoor unit distribution board as per specifications and instructions |
| 56 | SP and N Distribution Board 12 Way HVAC IDU | Supply installation testing and commissioning of single pole and neutral consumer unit type distribution board in sheet steel enclosure powder coated single door with acrylic window surface or recess mounting with insulated tinned copper bus bar neutral link DIN channel 12 way 2 plus 10 way without MCB |
| 57 | DP MCB 32 Amp SITC | Supply installation testing and commissioning of double pole MCB 32 Amp for HVAC indoor unit distribution board as per specifications and instructions |
| 58 | SP MCB 6 or 10 Amp SITC | Supply installation testing and commissioning of single pole MCB 6 or 10 Amp for HVAC indoor unit distribution board as per specifications and instructions |
| 59 | SFU 100A TPN at Main Switch Board SITC | Supply delivery installation testing and commissioning of switch disconnector fuse unit SFU in sheet steel enclosure suitable for DIN type HRC fuses with ISI mark 100Amp TPN to be installed at main switch board in electrical switch room |
| 60 | Chemical Earth Electrode Earthing Arrangement SITC | Supply installation testing and commissioning of chemical earth electrode for earthing complete with chemical powder 100 mm dia x 3 m long bore FRP chamber 500 x 500 x 200 mm with FRP cover earthing rod buried vertically 3 m deep resistance tested with calibrated earth resistance meter |
| 61 | CAMC First Year Air Conditioning System | Comprehensive annual maintenance contract for air conditioning system first year covering all preventive and breakdown maintenance of VRF and DX AC systems including spare parts labour tools and consumables as per contract terms |
| 62 | CAMC Second Year Air Conditioning System | Comprehensive annual maintenance contract for air conditioning system second year covering all preventive and breakdown maintenance of VRF and DX AC systems including spare parts labour tools and consumables as per contract terms |
| 63 | CAMC Third Year Air Conditioning System | Comprehensive annual maintenance contract for air conditioning system third year covering all preventive and breakdown maintenance of VRF and DX AC systems including spare parts labour tools and consumables as per contract terms |
| 64 | CAMC Fourth Year Air Conditioning System | Comprehensive annual maintenance contract for air conditioning system fourth year covering all preventive and breakdown maintenance of VRF and DX AC systems including spare parts labour tools and consumables as per contract terms |
| 65 | CAMC Fifth Year Air Conditioning System | Comprehensive annual maintenance contract for air conditioning system fifth year covering all preventive and breakdown maintenance of VRF and DX AC systems including spare parts labour tools and consumables as per contract terms |