| 1 | Carriage of following material from store centre under EEESD Ayodhya to dump store & from dump store to the site of work including loading, unloading and proper satcking at site etc. |
| 2 | 33 KV VCB 800A, 750 MVA |
| 3 | Double T/F Control Panel |
| 4 | 33 KV Control panel for single feeder |
| 5 | C.T. O/D 33 KV CTR 200/100/1-1A |
| 6 | C.T. O/D 33 KV CTR 400/200/1-1A |
| 7 | 11 KV Incoming switch gear 600/300/5A, 350 MVA, 630 A |
| 8 | Outgoing 11 KV switch gear 200/100/5A 250 MVA |
| 9 | 11 KV 3 core Cable 3x300 sq. mm XLPE cable |
| 10 | 11 KV 3x185 sq mm XLPE cable |
| 11 | 63 KVA 11/0.4 KV T/F |
| 12 | Bus Coupler |
| 13 | 33 KV line Isolator |
| 14 | 33 KV Bus Isolator |
| 15 | 33 KV Lighting Arrestor |
| 16 | 90 lbs rail PCs for T/F (44.64 kg/m) |
| 17 | ASCR Dog Conductor |
| 18 | M.S. Channel 125x65 mm |
| 19 | M.S. Angle 75x75x6 mm |
| 20 | M.S. Angle 75x75x6 mm (T/F Base) |
| 21 | 11 KV Cable jointing kit indoor 3x300 sq. mm XLPE |
| 22 | 11 KV Cable jointing kit outdoor 3x300 sq. mm XLPE |
| 23 | 11 KV Cable jointing Kit indoor 3x185 sq .mm |
| 24 | 11 KV Cable jointing Kit outdoor 3x185 sq .mm |
| 25 | M.S Top Channel 125x65x6 mm 3200 mm long |
| 26 | 11 KV Disc insulator B & S type 70 KN |
| 27 | Bracing angle 65x65x6 mm, 4300 mm long |
| 28 | 105 lbs rail piece/ R.S Joist 150x150 |
| 29 | 33 KV Fuse Set |
| 30 | 24 Volt Battery set |
| 31 | 24 Volt Battery charger |
| 32 | 33 KV PT (Outdoor) (33/110 V) |
| 33 | PCC Pole 11 Mtr |
| 34 | M.S.Angle iron 65x65x6 bracing 2700 mm |
| 35 | 11 KV Top channel 100X50X 2240 mm |
| 36 | Dropper Channel 100x50 mm 2028 mm |
| 37 | 11 kv Polymer Pin insulator |
| 38 | 11 KV Disc insulator polymer 45 Kn |
| 39 | Stay wire 7/10 |
| 40 | 6 SWG G.I. Wire |
| 41 | Construction of retaining wall around the 33KV switchyard in size (30+25)x2 mtr using first class bricks, local river sand and brick ballast which includes the following works( Including cost of 1st class brick, brick ballast sand/core sand cement etc.) |
| 42 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 43 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 44 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) :With F.P.S.(non modular) bricks |
| 45 | CEMENT PLASTER (IN FINE SAND) 1:6 (1 cement: 6 fine sand) |
| 46 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 47 | Fabrication of switchyard fencing by welded mesh with gate in size (30+25)x2 MTR by 10 swg wire mesh , MS angle 50X50X6, MS flat 25x5mm and 40X5mm, Its fitting tightining with nuts and bolt on the studs. Supported by drilling the required poll along with fabrication of 1 No. gate m/o MS angle. |
| 48 | Earth Mat Work -Laying of earth mat in the switchyard by laying of M.S. Round of 32 mm dia in 750 mm deep trenches with M.S. Round 32 mm dia & Connecting each other 35x5 mm G.I. Strip and overlapping 25x5 mm G.I. Strip , 3 Mtr. Long earth elecrodes Grounded & Connecting each other as per drawing . The work includes welding of the M.S. Round, Connecting all steel strutures in the switchyard with the earth mat by means of G.I. Strip of size 50x6 mm as per Item below (M.S. Round bar 32 mm layed in 30x25 meter square area in 6 mtr and 3 mtr. intervel as per drawing no. Res-43 |
| 49 | Digging of trench of size 500x750mm for laying of 32mm Dia MS round including refilling of earth and ramming the same after laying of MS round/G.S. strip |
| 50 | Laying and welding of lap joints of MS round of 32mm Dia with minimum 150mm overlaping. The MS round shall be welded on both side so as to fill the wedges completely using high quality Arc welding and goodwork Manship. The Joint shall be covered with black bitumen paint |
| 51 | Fabrication of 32mm Dia MS round 3 Mtrlong earth electrodes and driving them into ground so that tip of the electrodes remains atleast 750mm below the ground level and Jointing of earth electrodes 32 mm Dia with the earth mat using high quality Arc welding and goodworkman ship |
| 52 | Jointing of MS round 32 mm Dia in earth mat at cross joints using high quality Arc welding . A 75mm piece of 32 mm Dia MS round shall also be welded to make the joint strong for carrying fault current. The joints shall be covered with black Bitumen Paint |
| 53 | Providing and laying of G.S. strip of size 50x6mm for connecting the earth mat with the super structure, Security fencing post, Including digging of trench 500x500 mm bending, cutting, straightening and welding of the earth strip with the earth mat and various street structure using high quality Arc welding. The work include proper overlapping of the strip and Jointing By weldiing |
| 54 | Plinth of 05 MVA, 33/11 Kv T/FsConstruction of Plinth of size 3.46x3.46 Mtr for 5 MVA T/F having 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. All materials provided by the contractor. except rail piece |
| 55 | 33 KV Cable stand StructureFabrication & erection of 33 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (M.S Flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 56 | Bus Bar GantryDigging of 2 Nos Pits of size 2.2mt x1.4mt x 0.75 Mtr providing stone pad at the bottom of the trench and grouting of the two legs of the Bus Bar Gantry in CC ( cement, Coarse sand and stone grit of 20mm gauge) in the ratio 1:3:6 including supply of all T&P shuttering etc. in a block of size 2.2 mtx1.4 mtx0.75 mt. The work consists of dragging , shifting up to 40 mtr raising and erecting the two pre fabricated legs of Bus Gantry in proper allingment level and plumb. Both the plinths of the termainal gantry shall be properly finished with champering of edges. The work includes fabrication of Bus Bar Gantry 6.23 MtrLong as per RESPO drawing no.38 ( Set of 2) (All materials provided by the contractor except dog conductor , steel and disc insulator .) |
| 57 | Bus Isolator/Line Isolator StructureFabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 mtX 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Both plinths of the Isolator structure shall be properly finished with champering of edges. |
| 58 | LighteningArrestor/Post insulator StructureFabrication of Lightening Arrestor and post insulator structures per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Both plinths of the structure shall be properly finished with champering of edges etc. |
| 59 | C.T. & P.T StructureFabrication of C.T & P.T strucuture per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Both plinths of the structure shall be properly finished with champering of edges etc. |
| 60 | 33 KV Fuse StructureFabrication of Fuse set structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc.(All the material will be supplied by the Contractor . except steel) All the erection ,installation maitenance etc.will be done at requied places |
| 61 | Plinth for 33KV VCBConstruction of plinth of size 2.0x1.5x0.9 (Mtr) suitable for erection of super structure for 33 Kv VCB including grouting of Anchor bolts in proper allingment and level. Scope of work includes excavation of foundation base concreting in CC 1:6:12 ( cement, fine sand and brick ballast) 1st class brick work in cement mortor of ratio 1:4 CC in Ratio 1:4:8 and RCC work in ratio 1:2:4 ( Cement, coarse sand and stone grit of 20 mm gauge) as per Drawing |
| 62 | Delta type Earthing of Power T/F Neutral Earthing of Power T/F Neutral by providing 03 No. of \\"B\\" class G.I. pipe 50 mm Dia 20 mtr long from ground upto the water level The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect and arrangement of G.I Pipe like delta it will be connected to eachother and Providing and laying G.S. strip 50 x 6 mm including cutting, welding, bending etc. complete in all respect. (All the material will be supplied by the contractor) |
| 63 | Special Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.S. strip for transformer neutral connection. The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. |
| 64 | Earth filling in the Switchyard of size 25x30 mtr including cost of earth handling and cartage upto Switcyard from outside with its unloading and laying in the yard, Leveling, Watering and Ramming till its Compactness |
| 65 | Installation of Line/ bus IsolatorsAssembling and installation of line/Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. |
| 66 | Providing of 33 KV Post Insulator |
| 67 | Installation of Post Insulator Installation of post insulator on the post insulator structure . The work includes fabrication for proper fixing if required. |
| 68 | Installation of Lightening ArrestorsAssembling and installation/ mounting of .Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required. |
| 69 | Installation of CTs Installation of CTs of ratio 200/100/1A & 400/200/1-1A on the CTs structure. The work includes fabrication for proper fixing if required. |
| 70 | Installation of PTs Installation of PT Outdoor on the PTs structure. The work includes fabrication for proper fixing if required. |
| 71 | Installation of 33 KV VCBInstallation of 33 KV 750 MVA 800 Amp VCB on 33 KV VCB structure along with earthing by G.I. strip 50x6 mm size with main earthmat of Switchyards complete in all respect including commissioning. |
| 72 | Installation of 33 KV Fuse setAssembling and installation of Fuse set on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.All the erection ,installation maitenance etc.will be done at requied places |
| 73 | Installation of Switchgears in Control Room Shifting carefully and safely 11 Kv Switchgears and bus coupler from out side of the switch gear room, Including grouting the two Nos. 100x50x6mm channels piceses ( each 800mm long including cutting to size) and foundation bolts in 1:2:4 CC ( Including cutting of CC of the floor and finishing of Floor) as per direction of Engineer Incharge, Placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position and alignment, complete work with mounting of P.T. on incoming S/G etc. |
| 74 | Fixing and making Bus Bar connection in between I/C and O/G switchgears after cleaning and tapping with H.T. tape, Empire tape and PVC tape properly providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material Strictly to the satisfaction of site incharge. |
| 75 | Shifting carefully and installation of 33 KV single/Double transformer / FDR pannel in control room including grouting of above and its proper connection. |
| 76 | Providing and fixing of protection board made of teak wood with white sunmica top of size 600mmx450mm duly fitted with good quality ISI mark 3 Nos bells, 3 Nos ON-OFF Switches, 3 Nos indication lamps with holders, 3 Nos. test button switches on wall of switchgear room duly wired with 3/20 SWG PVC copper wire, Complete Job with cost of all materials |
| 77 | Earthing of 11KV & 33KV SwitchgearLaying of earth mat for earthing of indoor equipments by means of M.S. Strip 50x6mm Connecting to 4 Nos. earthing electrodes of 32 mm (including fabrication of earthing electrodes) 3 Mtr long on each side (as per RESPO Drawing RES-40). This work includes driving of eath electrodes deep down into the earth so that its TOP remains 500 mm below ground level. The work include laying, bending, welding of M.S. earth strips 50 x 6 mm in the control room and connecting to both side squares. |
| 78 | Battery and Battery charger (Materials will be supplied by the contractor with all accessories.) |
| 79 | Installation of 24 Volt Battery 200 AH ( 01 set=12 Nos, 2 Volt each with ISI 1651, IS nomenclature T 200 P) With its proper connection. (All the material will be supplied by the contractor) |
| 80 | Installation of Input voltage 230 V, AC one phase 50 hertz, output 24 Volt , 40 Amp DC Battery charger with its proper connection. |
| 81 | Stand / cabinet for battery set for proper stacking and storage |
| 82 | Earthing of battery charger connected with 25x6 G.I strip |
| 83 | H.T. Cable LayingLaying & dressing of 11 KV 3x300 & 11 KV 3x185 Sq.mm XLPE cable underground from 5 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. |
| 84 | 11 KV Cable stand StructureFabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 85 | Neutral standFabrication and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.) |
| 86 | 33 KV Bus Bar & Stringing.Stringing of 33Kv Bus Bar by using and laying of ACSR Dog Conductor (0.300 KM) including fixing of Disc Insulator. Strings and tension fitting complete with sagging of Bus Bar etc. and making Vertical/Horizontal jumper connection through PG clamps and connecting all the equipments with each other through connecting clamps. |
| 87 | Construction of 11 KV Double poleErection & Grouting of 2 Nos 11Mtr PCC support for making DP structure Including fabrication, Fixing of MS Channel, M.S. angle, Disc Insulators/ Pin Insulators etc. The work Includes suply and fixing of necessary clamp with nut, bolts and washers. complete in all respect. (All the material will be supplied by the contractor except steel section) |
| 88 | Provding, fixing and mounting of following equipments (All the material will be supplied by the contractor) |
| 89 | 11 KV TPMO switch with fixing clamps. |
| 90 | 11 KV Fuse set with fixing clamps |
| 91 | Grouting of following structure by digging of pit 1.83 Mtr deep for 11 Mtr STP,with 1:4:8 Ratio cement, sand & first class brickballast0.285 cu mtr for 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering. |
| 92 | Providing and fixing of earth rod for earthing of support by G.I. Wire 6 SWG as per norms. (All material will be arranged by the contractor Like earth rod except 6 swg wire. |
| 93 | Painting of StructurePainting of 11 Mtr ST Pole with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 94 | Nozeling and grouting of stay set. (All the civil material and stay set will be arranged by the contractor except Stay wire) |
| 95 | Fixing of Danger board .Supply and fitting of Danger board of size 250x200x2 mm 3650 mm above ground level as per Respo norms. RESPO Drawing No-55 |
| 96 | Fixing of barbed wire on poleSupply and fixing of barbed wire on the pole above 2750 mm ground level. Barbed wire wrapped for a distance of 0.9 mtr. with a pitch of 13.mm at a height. (All materials supplied by the contractor) |
| 97 | Fixing of Number plate .Supply and fitting of Number plate of size 250x200x2 mm 3650 mm above ground level as per Respo norms. RESPO Drawing No-55 |
| 98 | Providing and fixing Alu Connector for LI/BI/LA |
| 99 | Providing and fixing Copper L-Piece |
| 100 | Supply and fixing of P.G clamp for dog and connector |
| 101 | Erection & installation of 63 KVA, 11/0.4 KV T/F on double pole including shifting of the same upto double pole and making of 11KV connections to the Transformer. The work includes supply of material required such as clamps, nut & bolts etc. for mounting of T/F.T/F base angle 75x75x6 and all required items provided by the contractor except pole and T/F. |
| 102 | Jointing of following 11 KV Power Cable ends : |
| 103 | Installation of 3x300 11 KV Xlpe and 11 KV 3x185 Xlpe indoor and outdoor jointing kit. As per norms. |
| 104 | Hosting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of 2 No. Ms Angle support, 9 no. p.g. Clamp and 3 no. long barral alu. lug and its clamping, and 02 nos. supporting angle 65X65X6, 2500 mm long, jumpering properly as per RESSPO Norms. (All material will be supplied by the contractor like P.G. clamp, lug,supporting Angle 65X65X6,2500 mm. N&B etc). |
| 105 | Hoisting of 11 KV Cable on existing/erected cable stand and on 11 KV incoming must be with proper size of G.I clamps ( In case of cable stand 02 clamp per cable and 01 no. clamp in case of incoming). The neutral of 11 KV cable inserted into lug must be tightend with the earth with the help of nut & bolt. In the case of cable stand All the phase of the cable must be connected with the P.G clamp to bus bar which must be made by cable size 11 KV 3x300 XLPE sq. mm. If it is double circuit cable hoisting, second circuit cable hoisted from the other side of the cable stand and same clamping would be done. |
| 106 | Filling of sand in cable trench in the Switch Gear Room. |
| 107 | Construction of Fire wall 05 Mtr. Height as per drawing |
| 108 | Station / Switchyard lighting Erection of STP 9 Mtr long support after excavation of earth and grouting of cc in ratio 1:4:8 (Cement, Coarse sand and Brick ballast) as per RESPO drawing with plinth. Painting of one Coat of Red Oxide Primer and Two Coats of Aluminum paint of good Quality. For making cable LT line for colony and switchyard lighting. (All material will be supplied by the contractor like 09 Mtr STP, clamp etc.) |
| 109 | Providing and fixing of Street Light (LED, 90 Watt, ISI Mark) and fitting with propoer clamps and Nut Bolts complete in all respect and suitable for 9.0 Mtr STP support. |
| 110 | Laying and spreading of 3½ core 25 sq.mm. PVC LT cable from 11/0.04 KV, 63KVA T/F to LT distribution board in switch gear room after digging the trench, Laying cable and refilling of trench including connections at both ends after providing and crimpling of Lugs of proper size complete work. |
| 111 | Providing and laying of 2 core 2.5 sqmm LT AL. amoured cable from S/G room to street light supports after digging of trench, Laying of cable providing a brick on TOP of cable, Refilling of trench making connection at poles with street light fittings complete with all respects. |
| 112 | Supply & Laying of 6x2.5 sq.mm. Sq. amouredcontrol cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 113 | Supply & Laying of 4x2.5 sq.mm. Sq. amoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 114 | Supply & Laying of 2x2.5 sq.mm. Sq. amoured control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. |
| 115 | Construction of cable trench of 200 mm wide and 300 mm deep with MS strip at a distance of 1mtr. With brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with MS strip. (All the material will be supplied by the contractor) |
| 116 | Construction of trench cover of 600 mm long and 75 mm thick for cable trench Including cost of material, labour and T&P. (All the material will be supplied by the contractor) |
| 117 | Laying and Fixing of Interlocking Bricks providing brick balast, local river sand, cement 3 inch for leveling Switchyard and Making approach path with bricks works on both side and interlocking on top and Proper leveling and finishing and digging of earth out side if recured for leveling etc. |
| 118 | Water shoking chambers with covers of size (0.75X0.75X1.0) mtr in switch yard corners for rain water harvesting & for earthing. The chamber will beinterconnected by pipe |
| 119 | Painting of StructurePainting of All structures with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. Scraping Rubbing, cleaning of wiremesh fencing and its gate with one coat of Red Oxide paint as primer then painting with supirior quality of Bus Grean Colour in two Caots including cost of paint & other allied material. |
| 120 | Scraping Rubbing, cleaning of wiremesh fencing and its gate with one coat of Red Oxide paint as primer then painting with supirior quality of Bus Grean Colour in two Caots including cost of paint & other allied material. |
| 121 | Wiremesh Fencing both side |
| 122 | Gate & its Angle on bothside |
| 123 | Supply, fixing and mounting of following equipments/items in the control room |
| 124 | Sign board and other Sunderyitems of substaion |
| 125 | Fire Extinguisher Mounted Type |
| 126 | Fire Bucket (4 No) with stand Complete |
| 127 | Rubber matting one side chequered and other side plane size 1800x900x12mm |
| 128 | Rubber hand gloves |
| 129 | Office Table 1 No. , 3 No (1+2) Chair and 1 No. Bench |
| 130 | Wall Clock |
| 131 | Single Line Diagram Board, Notice Board, Max/Min Load Board Complete |
| 132 | T&P Of Sub-Station |
| 133 | 5000 V Megger ISI Mark |
| 134 | Rassa-Pulley |
| 135 | 11 mtr Bamboo ladder alongwith thela |
| 136 | Providing M.S Angle 75x75x6 (T/F Base) |
| 137 | Providing round bar 32 mm dia |
| 138 | Providing G.I strip for connecting earth mat 35x6 mm |
| 139 | Providing G.I strip for connecting earth mat 25x6 mm |
| 140 | Providing G.I strip for connecting earth mat 50x6 mm |
| 141 | Commissioning of 5 MVA T/F and its equipments installed in switchyard and 11 KV Incoming and Outgoing Panels complete in all respect upto energising. |
| 142 | Centrifuging of oil in 05 MVA TF (02 No.) |
| 143 | Replacement of damage oil seal /Packing |
| 144 | Supply and installation of Silica Gel with cabinet including breather |
| 145 | Providing & Replacement of Bushing rod HV for 05 MVA TF |
| 146 | Centrifuging of oil in 05 MVA TF |
| 147 | Sundries (Painting etc.) |
| 148 | Radiator wall welding (leakage fixing with gas welding or as per requirement etc) |
| 149 | Replacement of OTI&WTI Please Enable Macros to View BoQ information |