| 1 | Supply of materials |
| 2 | 100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia. |
| 3 | OD128308/2025-2026:Supply of 80 mm GI pipe (medium) |
| 4 | Working Charges |
| 5 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) |
| 6 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. |
| 7 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 8 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 9 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. |
| 10 | OD128953/2025-2026:Taking inter connection from the existing 63mm to 110mm pvc/HDPE pipe with the newly laid 63mm to 110mm pvc line including cost of specials and earth work excavation and all other incidental charge |
| 11 | OD128984/2025-2026:Shifting existing house/Tap connections from the existing line towards the newly laid line-average distance 5m |
| 12 | OD128346/2025-2026:Conveying and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc., but excluding cost of pipes and fittings for External work: 80mm diameter nominal bore. |
| 13 | OD128943/2025-2026:Cutting of 80 mm (ID) .G.I. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc. complete: |
| 14 | OD34563/2026-2027:Welding 80mm dia GI pipe for making bend and other specials |
| 15 | OD34564/2026-2027:Grinding the cut edges/ welded portions of 80mm GI pipe |
| 16 | 18.30.1:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:80 mm diameter pipe |
| 17 | 100.59.2:Refilling the trenches with a wet mix of close graded granular materials (Stone aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size - 17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings - 4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers not exceeding 150mm, compacting properly at Optimum Moisture Content with Surface Plate Vibrator and disposing the excavated material etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites. |
| 18 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 19 | OD38971/2026-2027:Fabricating M.S. flanges of diameter 80mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates. Please Enable Macros to View BoQ information |