| 1 | Detail of Work |
| 2 | Safely cartage of PCC Pole 8.5/9/11 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 20 KM.) |
| 3 | Safely Cartage of 11 KV VCB I/C CTR 600/300/5A/11 KV VCB O/G CTR 400/200/5A from ESC SRE to Site of work including loading and unloading at both ends. |
| 4 | Safely Cartage of 33 KV ACSR Covered Dog Conductor Cable from ESC SRE to Site of work including loading and unloading at both ends. |
| 5 | Safely Cartage of 33 KV CT from ESC SRE to Site of work including loading and unloading at both ends. |
| 6 | Safely Cartage of 33 KV Lightening Arrestor from ESC SRE to Site of work including loading and unloading at both ends. |
| 7 | Safely Cartage of 11 KV XLPE Cable (3x185 /3x300 sq.mm) from ESC SRE to Site of work including loading and unloading at both ends. |
| 8 | Safely Cartage of Line Material from ESC SRE to Site of work including loading and unloading at both ends. |
| 9 | Laying of 11 KV XLPE cable 3x300 Sqmm in to the trench after spreading the sand into the trench and then laying of Ist class bricks in the trench and put the cable on the bricks and then covered the cable with ist class bricks from all three sides of cable and then filling the earth with ramming |
| 10 | Cable Hoisting Charge with Loop (11 KV XLPE cable 3x300 Sqmm) |
| 11 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Dog Conductor for 33KV Line including complete. |
| 12 | Making and Filling the 11KV cable jointing kit Indore & outdoor type size 3x185S/3x300 qmm. sq.mm as per RESPO specification. |
| 13 | Laying of LT PVC cable 3.5x150/70 sq.mm from D/P to T/F |
| 14 | Providing and fixing LT Fuse Set protection unit for 63 and 100 KVA DT with SMC Box |
| 15 | Earthing of pole by MS Earthing Road of 20x2500 mm & 6SWG earthwire etc complete |
| 16 | Providing and fixing of Danger Board Barbed wire including Jumper with nut and bolt |
| 17 | Erection of single support on PCC Pole up to 8.5/9/11Mtr Long with complete fitting of all accessories of 11 KV/LT as per RESPO specification |
| 18 | Concreting of Pole |
| 19 | Fixing of 33 KV X-arm |
| 20 | Fixing of 33 KV pin insulator with nin |
| 21 | Fixing of 33 KV Disc insulator |
| 22 | Fixing of 33 KV Disc Fitting |
| 23 | Providing and fixing of Holding clamp with nut & Bolt |
| 24 | Providing and fixing of Stone Pad 300x300x75 Mm |
| 25 | Providing and fixing of Danger Board with Clamp |
| 26 | Providing and fixing of Number Plate |
| 27 | Providing and fixing of Barbed Wire |
| 28 | Providing and fixing of HT Tape 19 MM, 25 MM |
| 29 | Providing and fixing of F-clamp with nut & Bolt |
| 30 | Providing and fixing of PG-clamp |
| 31 | Providing and fixing MS Channel 100x50x6 mm for Side Breaket |
| 32 | Providing and fixing MS Channel 65x65x6 Mm for Side Breaket |
| 33 | Earthing of pole by MS Earthing Road of 20x2500 mm & 6SWG earthwire etc |
| 34 | Fixing of 33 KV stay rods by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/8 SWG and fitting the same on the pole with clamp |
| 35 | Removal of old and used conductor with making of roll of conductor/Steel Scrape Material site to ESC SRE/JE Store including loading and unloading at both ends. |
| 36 | Constriction of plinth for installation of 250 kv T/F of size 2x2x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 37 | Chamical Earthing |
| 38 | Wire mesh fencing of 250/400 KVA T/F size 2.5x2.5x2.5 mt. grouting making frame of MS angle 45x45x6 mm and fixing four no. MS strip size 25x6 mm at equal distance in between the frame and fixing square mesh 50 mm square in each frame the fencing should cover all side of T/F with providing 1 No. door size 6'x3' with sitakni & Dandala with painting work |
| 39 | Pipe/Water level Earthing of 05 MVA Power T/F (Body/neutral earthing)by boring of 60 Ft deep & fixing of 60 ft. G.I pipe 11/2\\" Dia (Jindal Class B) and connecting with G.I. Strip of size 40x5 mm and G.I wire at bottom of G.I pipe to the 05 MVA Power T/F providing of required charcoal & salt in the pipe |
| 40 | Safely Carriage of Batter Set 1 No (24 Volt) & Battery Charger 1 No (24 Volt ) from ESC SRE to site of work including loading and unloading at both ends (distance 20 KM) |
| 41 | Safely Installation of Battery Charger (24 Volt). |
| 42 | Safely Installation of Battery Set (24 Volt). |
| 43 | Safely removal of old and damged Battery Set (24 Volt) & Battery Charger (24 Volt ) from site to ESC SRE including loading and unloading at both ends. |
| 44 | Safely Installation of 111 KV VCB I/C CTR 600/300/5A/11 KV VCB O/G CTR 400/200/5A and connection properly. |
| 45 | Safely removal of old and used 11 KV I/C & O/G VCB from Site to ESC SRE including loading and unloading at both ends. |
| 46 | Safely Installation of 33 KV CT and connection properly. |
| 47 | Safely Installation of 33 KV Lightening arrestor and connection properly. |
| 48 | Safely removal of old & used 33 KV CT from Site to ESC SRE including loading and unloading at both ends. Please Enable Macros to View BoQ information |