|
| 1 | Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - |
| 2 | LT XLPE Cable 1x120 Sq.mm. |
| 3 | LT XLPE Cable 1x240 Sq.mm. |
| 4 | LT XLPE Cable 1x400 Sq.mm. |
| 5 | LT XLPE Cable 1x630 Sq.mm. |
| 6 | LT XLPE Cable 1x1000 Sq.mm. |
| 7 | LT AB Cable 3x120+1x95+1x16 Sq.mm. |
| 8 | LT AB Cable 3cx95 Sq.mm. |
| 9 | PCC Pole 8.5 Mtr. Long |
| 10 | 11 KV V-type Steel Cross Arm |
| 11 | 11 KV Polymeric Pin Insulator with pin |
| 12 | 11 KV Polymeric Disc Insulator with Disc |
| 13 | Stay Set Complete |
| 14 | Three Phase Distribution Box |
| 15 | Providing of following material of standard make / best quality for complete the work of LT line as per RESSPO norms by the contractor at his own cost : - |
| 16 | Stone Pad |
| 17 | Concreting of Pole |
| 18 | Concreting of Stay Set |
| 19 | Aluminium Lugs 120 Sq.mm. |
| 20 | Aluminium Lugs 240 Sq.mm. |
| 21 | Aluminium Lugs 400 Sq.mm. |
| 22 | Aluminium Lugs 630 Sq.mm. |
| 23 | Brass Bolted Lugs 1000 Sq.mm. |
| 24 | PVC Tape |
| 25 | Suspension Clamp |
| 26 | J Hook |
| 27 | Dead End Clamp |
| 28 | I Hook |
| 29 | Piercing Clamp |
| 30 | Holding Clamp with nut & bolts |
| 31 | Clamp and nut & Bolts |
| 32 | F-Bracket with Bolt & Nuts |
| 33 | MS T-off channel size 100x50x1640mm |
| 34 | Erection / Fixing of following material for complete the work of LT line as per RESSPO norms by the contractor at his own cost : - |
| 35 | Stone Pad |
| 36 | Concreting of Pole |
| 37 | Concreting of Stay Set |
| 38 | Aluminium Lugs 120 Sq.mm. |
| 39 | Aluminium Lugs 240 Sq.mm. |
| 40 | Aluminium Lugs 400 Sq.mm. |
| 41 | Aluminium Lugs 630 Sq.mm. |
| 42 | Brass Bolted Lugs 1000 Sq.mm. |
| 43 | PVC Tape |
| 44 | Suspension Clamp |
| 45 | J Hook |
| 46 | Dead End Clamp |
| 47 | I Hook |
| 48 | Piercing Clamp |
| 49 | Holding Clamp with nut & bolts |
| 50 | Clamp and nut & Bolts |
| 51 | F-Bracket with Bolt & Nuts |
| 52 | MS T-off channel size 100x50x1640mm |
| 53 | 11 KV V-type Steel Cross Arm |
| 54 | 11 KV Polymeric Pin Insulator with pin |
| 55 | 11 KV Polymeric Disc Insulator with Disc |
| 56 | Three Phase Distribution Box |
| 57 | The Excavation of foundation pit in CC road/ mix soil/ normal soil/ soft & hard rack by using heavy duty compressor and its back filling and leveling etc. The size of the pit will be 600x600x1800 mm for each pole and having a depth of 1/6 of the full length of the support. |
| 58 | Erection of PCC pole 8.5 Mtr. including fitting of all reqired accessories of LT line as per RESSPO schedule. |
| 59 | Grouting of each pole (In ratio of 1:4:8 in Cement, sand and Brick Ballast) in size 450mmx450mmx1800 mm as per RESSPO schedule Complete in all respects. |
| 60 | Grouting of stay rod 1800x16 mm & Fixing, Tighting & nozzling of stay wire 5 kg with the pole of required tension with clamps, bolt & nut. |
| 61 | Laying, Lifting and final Binding, Sagging of Cable LT ABC size 3x120+1x95+1x16 Sq.mm. including fixing of lug & all accessories as per RESSPO schedule Complete in all respects. |
| 62 | Laying, Lifting and final Binding, Sagging of Cable LT ABC size 3Cx95 Sq.mm. including fixing of all accessories as per RESPO schedule Complete in all respects. |
| 63 | Laying of LT XLPE Cable 1x120 (15 Kms) / 240 (2.5 Kms) / 400 (3 Kms) / 600 (1 Km) / 1000 (0.5 Km) Sq.mm. including fixing of lug & all accessories as per RESSPO schedule Complete in all respects. |
| 64 | Dismantling & Carriage from work site to store with loading & unloading of old & jarjar ABC. |
| 65 | Geo-tagging of complete work as per PVVNL order No. 2259 Dated 21.08.2025 (Letter attached with condition). Please Enable Macros to View BoQ information |