| 1 | All these below items/materials from S.N. 1.01 to 1.09 shall be given and errected by the contractor on his own cost as per estimate/Resspo Norms. |
| 2 | Holding clamp for TPMO, fuse set, Top, T-off, dropper, DB box etc. |
| 3 | V-Type X-arm holding clamp |
| 4 | F-Bracket with clamp |
| 5 | Nut and bolt off. Size with washer |
| 6 | LT/Stay/Dead end and other types of Clamps |
| 7 | LT shackle Insulator |
| 8 | Stay Insulator |
| 9 | I hook with clamp for PCC/STP |
| 10 | Fuse set installed in SMC Box |
| 11 | (A) CarriageLoading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.18) from Electricity Store Centre, Gonda to the work site/dump site. |
| 12 | 25/63/100 KVA T/F |
| 13 | 250/400 KVA T/F |
| 14 | PCC/STP Pole |
| 15 | ACSR Weasal Conductor |
| 16 | AB Cable of different size |
| 17 | XLPE Cable of different size |
| 18 | GI wire 10 swg |
| 19 | Barbed wire |
| 20 | 33/11 kv disk insulator with Complete fitting |
| 21 | 33/11 KV pin insulator with Pin with Complete fitting |
| 22 | Stay set complete |
| 23 | Distribution box Three/Single phase |
| 24 | TPMO set for 33/11 KV with complete fitting |
| 25 | D.O. Fuse set for 33/11 KV with complete fitting |
| 26 | Earthing Rod |
| 27 | Straight through for 33/11 KV of different size |
| 28 | 33/11 KV CJ kit of different size |
| 29 | other line material |
| 30 | (B) Erection1. Any kind of fabrication work including hole in X-arm/clamp etc. shall be done by the contractor at his own cost.2. Fastner including suitable size of washer shall be provided and erected by the contractor at his own cost.3.In case of grouting cement and concrete shall be provided by the contractor at his own cost. |
| 31 | Erection of single PCC/ST Poles alongwith fitting of all accessories on pole. |
| 32 | Erection of sectional double PCC/STP pole alongwith fitting of all accessories. |
| 33 | Earthing of pole with complete fitting |
| 34 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 35 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 36 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
| 37 | 25/63/100 KVA T/F |
| 38 | 250/400 KVA T/F |
| 39 | Laying, Stringing & Sagging of ABC/PVC Cable up to proper sag of different size as per estimate/resspo norms |
| 40 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
| 41 | Laying, stringing, sagging & binding of XLPE Cable of different size with complete fitting by digging of trench/drill method as per estimate/RESSPO norms. |
| 42 | Dismentaling of Pole including all accessories installed on Pole |
| 43 | Dismentaling of old line and carriage scrape to store |
| 44 | Bore type/Chemical earthing of Pole/Transformer as per Estimate/Resspo Norms(all the material shall be provided by contractor on his own cost.) |
| 45 | Cutting of tree branches for cleaning route of 11 KV/LT line at the work site |
| 46 | Carrage of scrap/conductor from site to store |
| 47 | Guarding of line |
| 48 | Installation/Errection/Laying/stringing of the following items with complete fitting as per estimate/resspo norms. |
| 49 | Distribution box with clamp of Single/Three phase |
| 50 | TPMO set for 33/11 KV with complete fitting |
| 51 | D.O. Fuse set for 33/11 KV with complete fitting Please Enable Macros to View BoQ information |