| 1 | Detail of Work |
| 2 | Safely cartage of other complete line material Weasal/Rabbit/Dog Conductor/Xlpe Cable/AB Cable (Except PCC) from ESC, SRE/ JE store to site of work including loading, unloading at both ends |
| 3 | Safely cartage of PCC poles 8.5 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 4 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 5 | Safely carriage of 250 KVA T/F from ESC, SRE to site of work including loading & unloading at both ends.. |
| 6 | Safely installation of New 250 KVA T/F on the plinth by private crain with proper alignment and Complete fitting including making connection and commissioning |
| 7 | Removal of 100 KVA T/F From the D/P & Carriage From Site to ESC, SRE including loading & unloading at both ends. |
| 8 | Safely carriage of 11 KV cable jointing kit outdoor 3x185 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. |
| 9 | Fixing of 11 KV cable jointing kit Outdoor 3x185 sq mm for XLPE Cable as per RESPO specification. |
| 10 | Erection of single support on PCC poles (8.5 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 11 | Erection of Double Pole support on PCC poles (8.5 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 12 | Erection of single support on PCC poles (11 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 13 | Erection of single Double Pole on PCC poles (11 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 14 | Safely carriage of 11 KV Fuse set from ESC, SRE to site of work including loading & unloading at both ends.. |
| 15 | Safely Installation of 11 KV Fuse set and connection Properly |
| 16 | Safely carriage of 11 KV TPMO from ESC, SRE to site of work including loading & unloading at both ends.. |
| 17 | Safely Installation of 11 KV TPMO and connection Properly |
| 18 | Providing and fixing CopperL-piece 50x225x10/62x225x12 mm (LS) |
| 19 | Providing and fixing Al Lug long barrel off size |
| 20 | Providing and Fixing 11 KV Danger board with clamp nuts & bolts. for PCC/ST Poles made of 3mm thick foam sheet (8\\" X 6\\") with |
| 21 | Constriction of plinth for installation of 250 KVA T/F of size 2x2x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC Top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 22 | Chemical Earthing for 250 KVA T/F 50 mm 3 meter long with 2 bags of 25 kg compound each. |
| 23 | Providing & Making of Wiremesh fencing size 2.5x2.5x2.5 mtr with grouting making frame of MS angle 45x45x6 mm and fixing four no MS strip size 25x6 mm at equal distance in between the frame and fixing square mesh of 50 mm squre in each frame the fencing should cover all side of T/F with providing 1 no door size 6x3 with sitakni & dandala with green paints (British/Asian/enamel paints) |
| 24 | Concreting of PCC Pole 8.5/11 Mtr long with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 25 | Earthing of Pole by MS earthing rod properly |
| 26 | Providing and fixing of stone ped 300x300x75 |
| 27 | Providing and Fixing of Double Circuit Tail less unit 300 amp. incoming Circuit connected with copper Bus Bar of proper Rating for 250 KVA T/F. in the Frame made of MS Angle 45x45x5 mm Fitted with G.I Nut Bolt & Fixing the same Top of Plinth/Near Ground level as per Site Requirement |
| 28 | Fixing of LT Distibution box with clamp. 01 & 03 Phese |
| 29 | Providing & Fabrication charges of Droper Chanal 100x50x2028 |
| 30 | Providing & Fabrication charges of Top Chanal.100x50x2028 |
| 31 | Providing & Fabrication charges of M.S. Angel 75x75x6x2028mm |
| 32 | Providing and fixing Holding clamp for top channel TPMO & fuse set etc with nut& bolts made of new MS flat iron 50x6 mm |
| 33 | Providing and fixing Dead end clamp with I-Hook with nuts bolt |
| 34 | Providing and fixing Suspention clamp with J-Hook with nuts bolt |
| 35 | Providing and Fixing Piercing connector Diff. size. with nuts bolt |
| 36 | Providing and fixing T-off clamp . with nuts bolt |
| 37 | Providing and fixing F clamp . with nuts bolt |
| 38 | Fixing of 11 KV Cross Arm V-Type . |
| 39 | Fixing of 11 KV Polymeric Pin Insulator properly. |
| 40 | Fixing of 11 KV Polymeric Disc Insulator properly. |
| 41 | Fixing of GI wire for guarding. |
| 42 | Providing and fixing of GI barbed wire on the each pole. |
| 43 | Fixing of 11 KV stay rods (Stay Set) by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 44 | Laying and making connections of LT XLPE cable 1x400 sq.mm. from T/F to double pole |
| 45 | Laying, lifting, stringing proper sagging of LT/11 KV XLPE cable 1x250/3x185 sq mm of including complete etc |
| 46 | Laying, lifting, Stringing, proper sagging AB cable of size 3x95+1x70+1x16 sq.mm. including fixing of all accessories. |
| 47 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11KV/LT Line complete properly. |
| 48 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11KV/LT Line complete properly. |
| 49 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Dog Conductor for 11KV Line complete properly. Please Enable Macros to View BoQ information |