| 1 | For Bifercation of Taalgavon Feeder under EDD-Biswan, Sitapur .The following works involves. |
| 2 | Supply of 11 KV X-Arm Holding Clamp |
| 3 | Supply of 11 KV F Bracket for fitting Top insulator |
| 4 | Supply of Stay Clamp |
| 5 | Supply of Danger Board |
| 6 | Supply of Holding Clamp for Top Channel/Dropper Channel with Nut & Bolt |
| 7 | Supply of GI Pipe 6\\" Dia |
| 8 | Supply of Nut Bolt OFF Size |
| 9 | Carriage of PCC Pole From ESC, Sitapur to Dump Site, Sitapur |
| 10 | Carriage of 11 Mtr STP Pole From ESC, Sitapur to Dump Site, Sitapur |
| 11 | Carriage of 11 KV VCB 600/300 Amp. From ESC, Sitapur to Dump Site Sitapur |
| 12 | Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site, Sitapur |
| 13 | Carriage of 11 KV XLPE Cable 3x185 sqmm From ESC, Sitapur to Dump Site, Sitapur |
| 14 | Carriage of 11 KV Jointing Kit XLPE Cable 3x185 sqmm From ESC, Sitapur to Dump Site, Sitapur |
| 15 | Carriage of other Line Material From ESC, Sitapur to Dump Site, Sitapur |
| 16 | Shifting of PCC Pole From Dump Site, Sitapur to work Site, Sitapur |
| 17 | Shifting of 11 Mtr STP Pole From Dump Site, Sitapur to work Site, Sitapur |
| 18 | Shifting of 11 KV VCB 600/300 Amp. From Dump Site, Sitapur to work Site, Sitapur |
| 19 | Shifting of ACSR Weaseal Conductor From Dump Site, Sitapur to work Site, Sitapur |
| 20 | Shifting of 11 KV XLPE Cable 3x185 sqmm From Dump Site, Sitapur to work Site, Sitapur |
| 21 | Shifting of 11 KV Jointing Kit XLPE Cable 3x185 sqmm From Dump Site, Sitapur to work Site, Sitapur |
| 22 | Shifting of other Line Material From Dump Site, Sitapur to work Site, Sitapur |
| 23 | Erection of Single PCC Pole with all fitting |
| 24 | Erection of Double PCC Pole with all fitting |
| 25 | Erection of Doble ST Pole With all Fitting |
| 26 | Laying Stringing and sagging of ACSR Weaseal |
| 27 | Laying and Digging of 11 KV XLPE Cable 3x185 sqmm |
| 28 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 29 | Making Jointing Throught Jointing kit of XLPE Cable 3x185 sqmm |
| 30 | Installation of 11 KV VCB 600/300 Amp. |
| 31 | Hosting of GI Pipe 6\\" Dia |
| 32 | Fixing of Stay |
| 33 | Earthing of Pole |
| 34 | Grouting of PCC/ST Pole |
| 35 | Grouting of Stay Please Enable Macros to View BoQ information |