| 1 | Detail of Work |
| 2 | Safely cartage of other complete line material (Except PCC Poles/ABC) from ESC, SRE/ JE store to site of work at various sites including loading, unloading at both ends.( Dist.App. 0 to 20 Km.) |
| 3 | Safe cartage of 250 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 4 | Safe cartage of 11 KV Fuse Set from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 5 | Safe cartage of 11 KV TPMO from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 6 | Safe cartage of ABC Cable 3x95 from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 20 km.) |
| 7 | Safely Installation of Fuse set and connection properly. |
| 8 | Safely Installation of 11 KV TPMO and connection properly. |
| 9 | Constriction of plinth for installation of 250 kv T/F of size 2x2x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 10 | Safe installation of 250 KVA T/F on the Plinth with complete fittings including making connections and commissioning. |
| 11 | Wire mesh fencing of 250 KVA T/F size 2.5x2.5x2.5 mt. grouting making frame of MS angle 45x45x6 mm and fixing four no. MS strip size 25x6 mm at equal distance in between the frame and fixing square mesh 50 mm square in each frame the fencing should cover all side of T/F with providing 1 No. door size 6'x3' with sitakni & Dandala with painting of Fencing. |
| 12 | Chemical Earthing of 250 KVA T/F |
| 13 | Providing and fixing of Double Circuit Tail less unit 500 Amp incoming circuit connected with copper bus bar of proper ratting for 250 KVA T//F in the frame made of MS Angle 45x45x5 mm fitted with GI Nut & Bolt Ground Level as per site requirement (With grouting ). |
| 14 | Laying of LT PVC cable 3.5x400 sq.mm as per repo specification. |
| 15 | Laying of LT PVC cable 1x400 sq.mm as per repo specification. |
| 16 | Safely Fixing of 11 KV Polymeric Pin Insulator |
| 17 | Laying of LT PVC cable 1x240 sq.mm as per repo specification. |
| 18 | Fixing of 11 KV stay rods by digging of pits in block of 600X600X300 mm. & with nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 19 | Laying of LT AB cable 3x95 sq.mm as per repo specification. |
| 20 | Fixing of 3 Phase Distribtuion Box |
| 21 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR weasel Conductor for 11KV/LT Line including complete. |
| 22 | Providing and fixing of MS Channel (Dropper) 100x50x2028 MM |
| 23 | Providing and fixing of LT T-Off with bolt & Nuts. |
| 24 | Providing and fixing of Holding clamp for Top-Channel, TPMO & Fuse Set etc with bolt and nut. |
| 25 | Providing and fixing of MS Top-Channel 125x65x2240 mm |
| 26 | Providing and fixing of LT INCOMING PANNEL WITH METERING EQUIPEMENT |
| 27 | Providing and fixing of COPPER L-PIECE 50X225X10 MM |
| 28 | Providing and fixing of COPPER L-PIECE 62X225X12 MM |
| 29 | Providing and fixing of AI LEG LONG BARREL OFF SIZE (LS) |
| 30 | Providing and fixing of DANGER BOARD including barbed wire |
| 31 | Concreting of Stay |
| 32 | Providing and fixing of Suspension clamp |
| 33 | Providing and fixing of Dead & Clamp |
| 34 | Providing and fixing of PRC Connector with lead |
| 35 | Providing and fixing of I-hook |
| 36 | Providing and fixing of J-hook |
| 37 | Removal of 100 kva t/f from the D/P and cartage site of work to ESC SRE including loading and unloding at both ends Please Enable Macros to View BoQ information |