| 1 | dk;ZA |
| 2 | Safe carriage of the following material from store centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km:-11 Mtr. PCC/ST Poles. |
| 3 | 8.5 Mtr. Long PCC Poles. |
| 4 | ACSR Weasel/Rabbit Conductor. |
| 5 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 6 | T/F 11/0.4 kV, 25 kVA |
| 7 | T/F 11/0.4 kV, 100 kVA |
| 8 | LT PVC cable (3.5X150/70) sqmm |
| 9 | LT PVC cable (1X400) sqmm |
| 10 | LT PVC cable (4X16) sqmm |
| 11 | 11 KV XLPE Cable AL. 3x300 sq.mm |
| 12 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 13 | 11 KV Cable Box |
| 14 | 1-ϕ & 3 ϕ distribution box |
| 15 | Various Type Cable Jointing Kits (Indoor &outdoor ), straight through for 11/33 KV. |
| 16 | 11 KV VCB I/C and O/G unit. |
| 17 | 11/ 33 KV TPMO |
| 18 | T/F OIL |
| 19 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-AB cable from line, making bundle and stacking at a safe place, |
| 20 | XLPE cable from line, making bundle and stacking at a safe place, |
| 21 | 33 KV CT/PT Unit |
| 22 | Old and used TF 10/25/63/100 KVA |
| 23 | WTI/OTI |
| 24 | DIRTY T/F OIL |
| 25 | Dismantling/removing of the Double Poles and Diconnecting The Connections |
| 26 | Battery set |
| 27 | MS SCRAPE AND OTHER |
| 28 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel/Rabbit/Dog Conductor. |
| 29 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 30 | Digging of cable trench in size of 0.45Mtr. x1.05 Mtr. and Laying cable in trench and Providing 150 mm. sand cushion beneath and 150 mm. above the cable. The cable shall be duly protected by 1st Class Bricks, two on either side and third on top of the cable, laid in the series one after the other and:-11 KV XLPE Cable AL. 3x70 sq.mm |
| 31 | 33 KV XLPE Cable AL. 3x300 sq.mm |
| 32 | Fixing of 11 KV Fuse Set . |
| 33 | Mounting and fixing of CT on steel stracture as per respo norms. |
| 34 | Mounting and fixing of 33 KV CT as per respo norms. |
| 35 | Mounting and fixing of 33 KV PT as per respo norms. |
| 36 | Mounting and fixing of 25/63/100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 37 | Mounting and fixing of 100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 38 | Removing of Power T/F for construction of plinth and again installing power T/F back to plinth with connection as per respo norms |
| 39 | Making of Plinth and foundation and steel structure For VCB & Instailation with connection |
| 40 | Removing of various type Distribution T/F for construction of plinth and again installing T/F back to plinth with connection on plinth including making proper connections HT/ LT side. |
| 41 | Making MS strip (50x6 mm) Fencing (6 feet height including civil work) for humanand equipment safty with interlocking tile inside transformer fencing. |
| 42 | Water level earthing of VCB/250 KVA/400 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 43 | Fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 44 | Mounting and fixing 11 K.V Stay Set |
| 45 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 46 | Fixing of Danger board and number plate with clamp . |
| 47 | Fixing of 1-ϕ & 3 ϕ distribution box with making proper connection |
| 48 | Earthing of PCC/ST Pole and Transformer by M.S Earthing rod |
| 49 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Single support 8.5 Mtr. long PCC Poles :- |
| 50 | 11 Mtr. long PCC Poles :- |
| 51 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, holding clamps, f-bracket and nuts & bolts and all other accessories , . Double support Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 52 | Installation of 33 kv VCB in control room & making proper connection. |
| 53 | Installation of 11 kv VCB in control room & making proper connection. |
| 54 | Grounting of Pcc/ST POLE |
| 55 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 56 | Filling of various type 33/11 kv cable jointing kit. |
| 57 | Installtion of 33 kv TPMO |
| 58 | Installtion of 11 kv TPMO |
| 59 | Installtion of Bettery Set |
| 60 | Installtion of WTI/OTI |
| 61 | Fixing of Dead and Clamp |
| 62 | Fixing of Sespension Clamp |
| 63 | Fixing of Stay Insulator |
| 64 | putting T/F oil to power T/F |
| 65 | Fixing of control cable and connecting as per respo norms. |
| 66 | Removing damage battery set and making proper connection |
| 67 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 68 | 1-ϕ & 3 ϕ Distribution Box clamp |
| 69 | Suspension Clamp |
| 70 | Dead-End Clamp |
| 71 | Eye-Hook |
| 72 | J-Hook |
| 73 | Al. long leg Barrel, off-size |
| 74 | Danger Board with clamps |
| 75 | LT Fuse set with all accecesories |
| 76 | Double pole clamp |
| 77 | Stay rod clamp |
| 78 | Stay Grouting |
| 79 | Stay insulator |
| 80 | Nut and bolts |
| 81 | M.S Channel Top & Dropper |
| 82 | Grouting Meterial |
| 83 | F Clamp |
| 84 | WTI/OTI |
| 85 | M.S Angle For TF Base |
| 86 | M.S channel T-Off |
| 87 | Control Cable 2x2.5 |
| 88 | Control Cable 4x2.5 |
| 89 | steel structure For VCB Please Enable Macros to View BoQ information |