| 1 | Detail of Work |
| 2 | Safely cartage of other complete line material AB Cable (Except PCC/STP) from ESC, SRE/ JE store to site of work including loading, unloading at both ends |
| 3 | Safely cartage of PCC poles 8.5 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 4 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 5 | Safely carriage of 25/100 KVA T/F from ESC, SRE to site of work including loading & unloading at both ends.. |
| 6 | Safe installation of 25/100 KVA T/F on the double pole with complete fittings including making connections and commissioning. |
| 7 | Erection of single support on PCC poles (8.5 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 8 | Erection of Double Pole support on PCC poles (8.5 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 9 | Erection of single Double Pole on PCC poles (11 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 10 | Safely carriage of 11 KV Fuse set from ESC, SRE to site of work including loading & unloading at both ends.. |
| 11 | Safely Installation of 11 KV Fuse set and connection Properly |
| 12 | Safely carriage of 11 KV TPMO from ESC, SRE to site of work including loading & unloading at both ends.. |
| 13 | Safely Installation of 11 KV TPMO and connection Properly |
| 14 | Fixing of 11 KV stay rods (Stay Set) by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 15 | Earthing of Pole by MS earthing rod properly |
| 16 | Providing & Fabrication charges of M.S. Angel 75x75x6x2028mm |
| 17 | Providing & Fabrication charges of M.S. Channal. |
| 18 | Providing and fixing of stone ped 300x300x75 |
| 19 | Providing and fixing Holding clamp for top channel TPMO & fuse set etc with nut& bolts made of new MS flat iron 50x6 mm |
| 20 | Providing & Laying and making connections of LT PVC cable 1x240 sq.mm. from T/F to double pole |
| 21 | Providing & Laying and making connections of LT PVC cable 3.5x150/70 sq.mm. from T/F to double pole |
| 22 | Concreting of PCC Pole 8.5/11 Mtr long with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 23 | Fixing of 11 KV Polymeric Pin Insulator properly. |
| 24 | Fixing of 11 KV Polymeric Disc Insulator properly. |
| 25 | Providing and fixing J-Hook with nuts bolt |
| 26 | Providing and fixing J-Hook Clamp |
| 27 | Providing and fixing Dead end clamp with I-Hook with nuts bolt |
| 28 | Providing & Installation of LT Fuse set with SMC Box and connection Properly |
| 29 | Fixing of LT Distibution box with clamp. 01 & 03 Phese |
| 30 | Providing and fixing of 02 NoEarthing Strip 25x3 mm(length 14 feet), nuts washer and welding charge |
| 31 | Providing and fixing of Bakelite Strip 03 No with connector with fuse wire of size 40/38/37 SWg=G on 11 KV Bushing of T/F. |
| 32 | Providing and fixing Al crimping 185mm. |
| 33 | Providing and Fixing 11 KV Danger board with clamp nuts & bolts. for PCC/ST Poles made of 3mm thick foam sheet (8\\" X 6\\") with |
| 34 | Providing and fixing T-off clamp . with nuts bolt |
| 35 | Laying, lifting, Stringing, proper sagging AB cable of size 3x95+1x70+1x16 sq.mm. including fixing of all accessories. Please Enable Macros to View BoQ information |