| 1 | Clearance of Jungle including uprooting of rank vegetation grass, brushwood, trees and saplings of girth upto 30m and removal of rubbish upto a distance of meter outside the periphery of area. |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 3 | RRM with hardstone in foundation and plinth including leveling up with cement concrete 1:6:12 upto plinth level and curing complete with cement mortar 1:6 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.10.2.2 Welded |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.16.25.1 Made of G.I. wire of dia 4 mm |
| 7 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 meter openable length ( total length 90m), having 50 nos rounds per 6 meter length, upto 3 m height of wall with existing angleiron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron,all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ meter (cost of M.S. angle, C.C. blocks shall be paid separately) |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 9 | Supply of Galvanized steel barbed wire of 9.8Kg/100 meter. |
| 10 | Welding by electric plant for repair of damaged fencing |
| 11 | Supply and installation of 9 mtr MS LT pole |
| 12 | Supply and installation of halogen street light(Bajaj or equallent make) along with necessary fitings and connections/Switches |
| 13 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:3 ( 1 cement : 3 coarse sand) |
| 14 | Extra for half Brick masonry in superstructure above plinth level upto floor V level. |
| 15 | 15mm Cement plaster on the rough side of single or half brick wall ofmix:1 : 4 ( 1 cement : 4 fine sand) |
| 16 | Carriage of Materials by MT incl. cost of loading, unloading and stacking at site |
| 17 | Cement avg 10km |
| 18 | Sand avg 125 Km |
| 19 | Aggregate avg 10 km |
| 20 | Steel avg 10 Km |
| 21 | stone avg 10 km |
| 22 | Bricks avg 105 Km |
| 23 | Carriage of Materials by Mannual means |
| 24 | Cement avg 50 m |
| 25 | Sand avg 50 m |
| 26 | Aggregate avg 50 m |
| 27 | Steel avg 50 m |
| 28 | stone avg 50 m |
| 29 | Bricks avg 50 m Please Enable Macros to View BoQ information |