| 1 | Safe carriage of following Centralised materials from Store centre Kunera Etawah or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of Laying, sagging and stringing and jumpering /binding of 11 KV line through Weasal, Rabbit, Raccoon conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. | Safe carriage of following Centralised materials from Store centre Kunera Etawah or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of Laying, sagging and stringing and jumpering /binding of 11 KV line through Weasal, Rabbit, Raccoon conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. |
| 2 | STP 55 Pole 11 Mtr. | STP 55 Pole 11 Mtr. |
| 3 | PCC Pole 11 Mtr. | PCC Pole 11 Mtr. |
| 4 | PCC Pole 9 Mtr. | PCC Pole 9 Mtr. |
| 5 | PCC Pole 8.5 Mtr. | PCC Pole 8.5 Mtr. |
| 6 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 7 | ACSR Dog Conductor | ACSR Dog Conductor |
| 8 | 33 KV Disc Insulator (Polymeric) | 33 KV Disc Insulator (Polymeric) |
| 9 | 33 KV Pin insulator (Polymeric) | 33 KV Pin insulator (Polymeric) |
| 10 | 33 KV Cross arm V-Type | 33 KV Cross arm V-Type |
| 11 | 11 KV Disc Insulator (Polymeric) | 11 KV Disc Insulator (Polymeric) |
| 12 | 11 KV Pin insulator (Polymeric) | 11 KV Pin insulator (Polymeric) |
| 13 | 11 KV Cross arm V-Type | 11 KV Cross arm V-Type |
| 14 | G.I. Wire 4MM 8 SWG | G.I. Wire 4MM 8 SWG |
| 15 | Earthing Rod | Earthing Rod |
| 16 | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 17 | 33 KV Cross arm holding clamp | 33 KV Cross arm holding clamp |
| 18 | F-Clamp for 33 Kv | F-Clamp for 33 Kv |
| 19 | Guarding Angle for 33 Kv | Guarding Angle for 33 Kv |
| 20 | Guarding Clamp for 33 Kv | Guarding Clamp for 33 Kv |
| 21 | I-Hook for guarding | I-Hook for guarding |
| 22 | 11 KV Cross arm holding clamp | 11 KV Cross arm holding clamp |
| 23 | F-Clamp | F-Clamp |
| 24 | Guarding Angle | Guarding Angle |
| 25 | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. |
| 26 | Errection of STP 55 Pole 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of STP 55 Pole 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 27 | Errection of PCC 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 28 | Errection of PCC 9 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 9 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 29 | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 30 | Grouting, Concreting and plinting of Single support Pole with cement, coarse sand & stone ballast as per RESPO norms. | Grouting, Concreting and plinting of Single support Pole with cement, coarse sand & stone ballast as per RESPO norms. |
| 31 | Laying, sagging and stringing and jumpering /binding of ACSR Weasel Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Weasel Conductor as per RESPO manual and as per direction of Executive engineer |
| 32 | Laying, sagging and stringing and jumpering /binding of ACSR Dog Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Dog Conductor as per RESPO manual and as per direction of Executive engineer |
| 33 | Received Back of old scrap Pole/material from pit site to JE store/store center Etawah including loading & unloading and proper stacking. | Received Back of old scrap Pole/material from pit site to JE store/store center Etawah including loading & unloading and proper stacking. |