| 1 | Erection of Main & Auxiliary structure |
| 2 | Erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material/ equipment from store to erection site including all other associated work to complete the job. |
| 3 | 33 KV Circuit Breaker |
| 4 | 33 KV Line Isolator |
| 5 | 33 KV Bus Isolator/Section Isolator |
| 6 | 33 KV CT 400-200/1-1A with junction box |
| 7 | 33 KV PT with junction box |
| 8 | Insttalion of ABT Meter with all termination. |
| 9 | Laying of following size of control cable in the cable trench from control & relay panel to various equipment in switchyard as per cable schedule its saddling at every 75mm distance with SM saddles of size 25x3mm size including carriage of cable drums form store to laying site and shifting of remaining cables back to store and all other associated works to complete the job. |
| 10 | 2 core |
| 11 | 4 core |
| 12 | 6 core |
| 13 | Termination of control cable of various euipment with switchyard to control panel and drilling of holes in control panel and marshalling box .complete with cable glands, ferrules and other associated works to complete the job. |
| 14 | Jumpering of various equipments i.e CT, PT, ISOLATOR, CB, main bus etc with ACSR panther conductor to equipments & Bus Bar to equipments including measuring,cutting of conductor & shifting of all other associated material from store to work site. |
| 15 | 2 Point earthing of structure & equipments with 50x6mm by digging of 0.7 meter deep trench in earth from equipments to sub-station earthmat which includes providing, cutting,welding and bending of MS flat as well as shifting of all other associated material from store to work site. All materials including MS flats to be provided by contractor. |
| 16 | Painting of Earthing strip 50x6 mm (R. Mtr.) with coat red oxide 2 coat paint with green ISI paint including vertical support.Paint to be provided by contractor |
| 17 | Carraige of structure through private truck from EFU Naini, Prayagraj to 132KV Sub-station, Asha along with sorting, shifting and loading at Naini and unloading and stacking at 132KV Sub-station, Asha:- |
| 18 | Sorting out and stacking of Main & auxiliary structure as per BOM at EFU Naini |
| 19 | Loading of structure on private truck at EFU Naini |
| 20 | Transportation of structure from EFU Naini to 132 KV Sub-station, Asha |
| 21 | Unloading and proper stacking of structure at 132 KV Sub-station, Asha as per BOM |
| 22 | Installation of name plate for new 33KV bay of size 150x150mm made of 2mm thick Aluminium sheet cover with 2mm retro reflective sheet with all cost of plate, nut bolts and T&P. |
| 23 | Carriage of 33 KV equipments (CT/PT/Isolators/LA) through private truck from various near by sub-stations to 132 KV Sub-station, Asha alongwith sorting, shifting and loading at sub-station and unloading, stacking at 132 KV Sub-station, Asha |
| 24 | Special earthing by way of boring & lowering of GI pipe 50x6mm, 60 feet long from ground upto water level & connecting it to the 33 KV equpments like CT, VCB, PT, LA etc. with 50x6mm MS strip by providing laying, cutting, welding, bending etc. All materials labour and T&P to be provided by the contractor. |
| 25 | Supply of PG Clamp duly made of LM-6 Aluminum alloy suitable for ACSR panther to panther conductor complete with 04 Nos. 16x90mm sisze GI Bolts & Nuts & spring/plain washers as per sample. |
| 26 | Supply of PG Clamp duly made of LM-6 Aluminum alloy suitable for ACSR Moose to Panther Conductor complete with 04 Nos. 16x90mm size GI Bolts & Nuts & spring/plain washers as per sample. |
| 27 | Supply of 33kV CT clamp suitable for panther conductor |
| 28 | Supply of 33kV Isolator clamp suitable for panther conductor |
| 29 | Supply of Rubber Mat with one side chequered and other side plane of size as per technical specification. |
| 30 | Supply of Copper Bond |
| 31 | Supply of GI perforated cable tray (75mm) |
| 32 | Supply of Sand Bucket stand suitable for 10 Nos of buckets |
| 33 | Supply of Sand Bucket as per technical specification |
| 34 | Supply of Manual fire extinguisher CO2 (4.5kg) |
| 35 | Supply of Manual fire extinguisher dry checmical (4.5kg) |
| 36 | Supply of LED flood light luminaries type FL-1 (150 W) As per technical specification. |
| 37 | IEC 61850 based SCADA Configuration and its integration with 33 KV bays. Work includes as SLD generation for feeder bay in existing Hariharpur bay IED'S ICD fiels configuration, data base creation for new bay, event alarm generation, interlocks and soft logics configuration and testing if any, GPS time synchronisation etc. |
| 38 | Supply of fiber optical multimode patch chords for ST-MTRJ ports (each 3/5 meter) |
| 39 | Supply of fiber optical multimode patch chords for LC-LCports (each 10 meter) Please Enable Macros to View BoQ information |