| 1 | Installing new Plummer Block, Gun metal Bush in place of missing one by new Bolts and other allied work including all cost of material , labour and T&P etc. for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 2 | Replacement of worm wheel, Coupling and Bearing overhauling of Redicon unit with replacing gear oil, damaged packing and seal cover of Redicon unit by new gear oil, packing and seal cover including cost of all material, and other allied work, labour, T&P etc. required for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 3 | Repairing of Jammed Plumber block by opening, dismantling parts, removing of old grease from GM bush, cleaning, greasing and refitting of plumber blocks including all material, labour and required T&P at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 4 | Repairing and overhauling of roller by detaching roller assembling from gate with help of jigs and fixture jacks, etc. cutting lock plate by gas cutter lifting roller assembling from gate by manila rope and shifting to woking plateform, dismantling roller assembling ,cleaning ,washing,repairing wornout roller shaft by remetaling machining ,polishing and reassembling including replacing , rubber seal, o ring, grease nipple, etc. shifting to gate and refitting in gate greasing and testing etc. by operating gate in including all cost of material , labour and T&P etc. for proper completion of work per rollerat Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 5 | Replacing of bottom rubber seal size 80x20 mm as par IS code 11855 by installing new steel strip and rubber seal by making hole and surface preparation including cost of all material, labour, T&P and scaffolding required for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 6 | Replacing of Side rubber seal size 250x15 mm as par IS code 11855 by installing new steel strip and rubber seal by making hole and surface preparation including cost of all material, labour, T&P and scaffolding required for proper completion of work at Rasin Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 7 | Replacing of side rubber seal size 80x20 mm as par IS code 11855 by installing new steel strip and rubber seal by making hole and surface preparation including cost of all material, labour, T&P and scaffolding required for proper completion of work at Rasin DamThe work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . |
| 8 | Supply and installation of brake lever mechansim by dismantling parts, removing residual system, cleaning, greasing and refitting including all material, labour and required T&P.at Rasin damThe work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . Please Enable Macros to View BoQ information |