| 1 | For Bifercation of 11 KV Shyamnath Feeder under EDD, Sitapur .The following works involves. |
| 2 | Supply of Tee-of Channel Clamp |
| 3 | Supply of Holding for Top/Dropper Channel |
| 4 | Supply of Stay Clamp For PCC Pole |
| 5 | Supply of F Clamp For PCC Pole |
| 6 | Supply of Holding for PCC Pole |
| 7 | Supply of Gaurding Angle Clamp |
| 8 | Supply of GI Pipe 6\\" Dia |
| 9 | Supply of HDPE Pipe 120 mm Dia |
| 10 | Carriage of PCC Pole From ESC, Sitapur to Dump Site, Sitapur |
| 11 | Carriage of 11 KV Out going VCB 200/100/5 Amp. From ESC, Sitapur to Dump Site Sitapur |
| 12 | Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site |
| 13 | Carriage of 11 KV XLPE Cable 3x185 sqmm From ESC, Sitapur to Dump Site |
| 14 | Carriage of 11 KV 3x185 sqmm I/D/O/D Cable Box From ESC, Sitapur to Dump Site |
| 15 | Carriage of Straight Through 3x185 XLPE Sqmm Cable Box From ESC, Sitapur to Dump Site |
| 16 | Carriage of other Line Material From ESC, Sitapur to Dump Site, Sitapur |
| 17 | Shifting of PCC Pole From Dump Site, Sitapur to work site |
| 18 | Shifting of 11 KV Out going VCB 200/100/5 Amp. From Dump Site, Sitapur to work site |
| 19 | Shifting of ACSR Weaseal Conductor From Dump Site, Sitapur to work site |
| 20 | Shifting of 11 KV XLPE Cable 3x185 sqmm From Dump Site, Sitapur to work site |
| 21 | Shifting of 11 KV 3x185 sqmm I/D/O/D Cable Box From Dump Site, Sitapur to work site |
| 22 | Shifting of Straight Through 3x185 XLPE Sqmm Cable Box From Dump Site, Sitapur to work site |
| 23 | Shifting of other Line Material From Dump Site, Sitapur to work site |
| 24 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 25 | Erection of Double PCC Pole with all fitting |
| 26 | Erection of Single PCC Pole with all fitting |
| 27 | Laying of 11 KV XLPE Cable 3x185 sqmm (Drill Method) with HDPE Pipe 120 MM Dia |
| 28 | Making 11 KV 3x185 sqmm I/D/O/D Cable Box |
| 29 | Making Straight Through 3x185 XLPE Sqmm Cable Box |
| 30 | Installation of 11 KV Out going VCB 200/100/5 Amp. |
| 31 | Hosting of GI Pipe 6\\" Dia |
| 32 | Fixing of Stay |
| 33 | Laying Stringing and sagging of ACSR Weaseal |
| 34 | Earthing of Pole |
| 35 | Grouting of Pole |
| 36 | Grouting of stay |
| 37 | For Replacement of Old & Jarjar GI Wire of 11 KV Madhwapur under EDD, Sitapur .The following works involves. |
| 38 | Supply of Stay Clamp For PCC Pole |
| 39 | Supply of Stay Insulator |
| 40 | Supply of F Clamp For PCC Pole |
| 41 | Supply of Holding for PCC Pole |
| 42 | Carriage of PCC Pole From ESC, Sitapur to Dump Site, Sitapur |
| 43 | Carriage of ACSR Weaseal Conductor From ESC, Sitapur to Dump Site |
| 44 | Carriage of other Line Material From ESC, Sitapur to Dump Site, Sitapur |
| 45 | Shifting of PCC Pole From Dump Site, Sitapur to work site |
| 46 | Shifting of ACSR Weaseal Conductor From Dump Site, Sitapur to work site |
| 47 | Shifting of other Line Material From Dump Site, Sitapur to work site |
| 48 | Fabrication of Top, T-off, Dropper Chaneel etc. |
| 49 | Erection of Single PCC Pole with all fitting |
| 50 | Laying Stringing and sagging of ACSR Weaseal |
| 51 | Fixing of Stay |
| 52 | Earthing of Pole |
| 53 | Grouting of Pole |
| 54 | Grouting of stay |
| 55 | Safe Carriage of old used/Jarjar Scrap Material From work site to JE Store/ESC, Sitapur Please Enable Macros to View BoQ information |