| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20') in depth and earth work in embankment to be in 20cm (8\\") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5\\") lift and 30m (100') lead. The earth form cutting to be used in making embankent or to be deposited as spoil banks within 30m ('100') distance as directed by the EIC |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause |
| 3 | Providing and Laying separation Membrane of impermeable plastic sheeting 125 micron thick as per direction of engineer in charge. |
| 4 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer in-charge. Cement concrete prepared with batch mixing machine. |
| 5 | Disposal of excavated surplus earth upto 5km distance including loading, unloading, cartage etc complete including all labour and T&P etc. required for proper completion of the work . |
| 6 | M-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and toola and planta etc. required for proper completion of work. |
| 7 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 Coarse sand):Flush / Ruled/ Struck or weathered pointing . |
| 8 | RCC work with cement approved coarse sand and 20mm gauge approved stone ballast in the proportion of 1:1.5:3 in slabs including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc. and also including S/O all materials required for proper completion of the work. Binding wire to be supplied by the contractor free of cost. |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 2023 SI 10.25.2) Please Enable Macros to View BoQ information |