| 1 | Deployment of manpower / tools etc for carrying out Preventive Maintenance / routine maintenance as 'B' check norms for DG Set of capacity 7.5 KVA to 40 KVA ( Make:- Kirloskar / Cummins / Greaves / Ruston) through authorised / approved agency by OEM, comprising Inspection and checking as per B-check parameter i.e. lubrication service, lube oil filter, cooling system, fuel system, fuel filter, servicing of air filter and bypass filter, servicing and testing carried out of batteries, engine including replacement of oil filters, fuel filters, air filter, 'O' rings and drain out the old engine oil and filling up with the new engine oil including testing of diesel generator, complete all as specified and directed. |
| 2 | Deployment of manpower / tools etc for carrying out Preventive Maintenance / routine maintenance as 'B' check norms for DG Set of capacity 55 KVA to 100 KVA ( Make:- Kirloskar / Cummins / Greaves / Ruston) through authorised / approved agency by OEM, comprising Inspection and checking as per B-check parameter i.e. lubrication service, lube oil filter, cooling system, fuel system, fuel filter, servicing of air filter and bypass filter, servicing and testing carried out of batteries, engine including replacement of oil filters, fuel filters, air filter, 'O' rings and drain out the old engine oil and filling up with the new engine oil including testing of diesel generator complete all as specified and directed. |
| 3 | Deployment of manpower / tools etc for carrying out Preventive Maintenance / routine maintenance as 'B' check norms for DG Set of capacity 125 KVA to 250 KVA (Make:- Kirloskar / Cummins / Greaves / Ruston) through authorised / approved agency by OEM, comprising Inspection and checking as per B-check parameter i.e. lubrication service, lube oil filter, cooling system, fuel system, fuel filter, servicing of air filter and bypass filter, servicing and testing carried out of batteries, engine including replacement of oil filters, fuel filters, air filter, 'O' rings and drain out the old engine oil and filling up with the new engine oil including testing of diesel generator complete all as specified and directed. |
| 4 | Note For Item No 1 to 3:(i) Engine oil, spares parts will be measured and paid separately as supply only under relevant items of this BOQ.(ii) Cleaning & maintenance of Radiator & Oil cooler will be measured and paid separately under relevant items of this BOQ. (iii) The contractor shall submit documentary evidence that maintenance / servicing done by OEM of DG set and same shall be defaced by Engineer-in-Charge. |
| 5 | Supply & Filling inhibitor corrosion anti freeze coolant filling in DG set of capacity 7.5 to 250 KVA, complete all as specified and as directed by the Engineer-in-Charge. |
| 6 | Supply only Engine oil 20W/40, complete all as specified and directed by Engr-in-charge. Make :- Castrol / Servo / Indian Oil |
| 7 | Supply only air cleaning element inner and outer with necessary ‘O’ rings suitable for DG Set of capacity 7.5 to 40 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 8 | Supply only air cleaning element inner and outer with necessary ‘O’ rings suitable for DG Set of capacity 55 to 100 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 9 | Supply only air cleaning element inner and outer with necessary ‘O’ rings suitable for DG Set of capacity 125 to 250 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 10 | Supply only fuel filter with ‘O’ rings suitable for DG Set of capacity 7.5 to 40 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 11 | Supply only fuel filter with ‘O’ rings suitable for DG Set of capacity 55 to 100 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 12 | Supply only fuel filter with ‘O’ rings suitable for DG Set of capacity 125 to 250 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 13 | Supply only Lub Oil filter with ‘O’ rings suitable for DG Set of capacity 7.5 to 40 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 14 | Supply only Lub Oil filter with ‘O’ rings suitable for DG Set of capacity 55 to 100 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 15 | Supply only Lub Oil filter with ‘O’ rings suitable for DG Set of capacity 125 to 250 KVA as per existing make and model, complete all as specified and as directed by the Engineer-in-Charge. |
| 16 | M&L for disconnecting the oil cooler from DG Set of capacity 55 to 100 KVA (Make:- Kirloskar / Cummins / Greaves / Ruston) from the the existing locations by removing of all mechanical connections and taking down from the engine for complete servicing, opening into parts and cleaning thoroughly by using chemical cleaning and pressure testing, refixing back to its original positions with 'O' rings / gaskets, complete all as specified and directed by the Engg- in- Charge |
| 17 | M&L for disconnecting the oil cooler from DG Set of capacity 125 to 250 KVA (Make:- Kirloskar / Cummins / Greaves / Ruston) from the the existing locations by removing of all mechanical connections and taking down from the engine for complete servicing, opening into parts and cleaning thoroughly by using chemical cleaning and pressure testing, refixing back to its original positions with 'O' rings / gaskets complete all as specified and directed by the Engr- in- Charge |
| 18 | M&L for disconnecting all the incoming and out going rubber hoses and drain out the water from the choked radiator assembly of DG sets of capacity 7.5 to 40 KVA, taking down the radiator assembly by unscrewing all mechanical connections from the existing mounting, transporting the same to civil workshop for carrying out Chemical cleaning, opening the top and bottom covers of the radiator assembly cleaning thoroughly the chocked pipe of the radiator, cleaning of all the deposited sediments in the pipes / tubes including arresting of leakage by means of soldering, brazing and re-fixing the same to its original position with suitable size of nut, bolt and washers etc, complete all as specified and directed Engineer-in-Charge. |
| 19 | All as per ser item No 17.00 here in above for carrying out all the work mention under item No17.00 above and including replacement of old unserviceable copper core and fins completely with new Copper Core and fins, pressure testing, complete all as specified and directed Engineer-in-Charge. Note : - (i) Repair maintinance of rediater work shall be carried out through authorised agency by OEM.(ii) The contractor shall submit documentary evidence that maintenance / servicing done by OEM of DG set and same shall be defaced by Engineer-in-Charge. |
| 20 | M&L for disconnecting all the incoming and out going rubber hoses and drain out the water from the choked radiator assembly of DG sets of capacity 55 to 100 KVA, taking down the radiator assembly by unscrewing all mechanical connections from the existing mounting, transporting the same to civil workshop for carrying out Chemical cleaning, opening the top and bottom covers of the radiator assembly cleaning thoroughly the chocked pipe of the radiator, cleaning of all the deposited sediments in the pipes / tubes including arresting of leakage by means of soldering, brazing and re-fixing the same to its original position with suitable size of nut, bolt and washers etc, complete all as specified and directed Engineer-in-Charge. |
| 21 | All as per item No 19.00 here in above for carrying out all the work mention under item No 19.00 above and including replacement of old unserviceable copper core and fins completely with new Copper Core and fins, pressure testing, complete all as specified and directed Engineer-in-Charge. Note : (i) Repair maintinance of rediater work shall be carried out through authorised agency by OEM.(ii) The contractor shall submit documentary evidence that maintenance / servicing done by OEM of DG set and same shall be defaced by Engineer-in-Charge. |
| 22 | M&L for disconnecting all the incoming and out going rubber hoses and drain out the water from the choked radiator assembly of DG sets of capacity 125 to 250 KVA, taking down the radiator assembly by unscrewing all mechanical connections from the existing mounting, transporting the same to civil workshop for carrying out Chemical cleaning, opening the top and bottom covers of the radiator assembly cleaning thoroughly the chocked pipe of the radiator, cleaning of all the deposited sediments in the pipes / tubes including arresting of leakage by means of soldering, brazing and re-fixing the same to its original position with suitable size of nut, bolt and washers etc, complete all as specified and directed Engineer-in-Charge. |
| 23 | All as per ser item No 21.00 here in above for carrying out all the work mention under item No 21.00 above and including replacement of old unserviceable copper core and fins completely with new Copper Core and fins, pressure testing, complete all as specified and directed Engineer-in-Charge. Note : - (i) Repair maintinance of rediater work shall be carried out through authorised agency by OEM.(ii) The contractor shall submit documentary evidence that maintenance / servicing done by OEM of DG set and same shall be defaced by Engineer-in-Charge. |
| 24 | S&F in repairs battery cable leads of copper conductor single core, multistranded, 25 Sqmm to 35 Sqmm PVC insulated, with copper lugs at both ends and connecting from battery bank to self starter (Apprx. 1.00 m long) complete all as specified and as directed by the Engineer-in-Charge. |
| 25 | S&F in repairs battery cable leads of copper conductor single core, multistranded, 50 to 75 Sqmm, PVC insulated, with copper lugs at both ends and connecting from battery bank to self starter (Apprx. 1.00 m long) complete all as specified and as directed by the Engineer-in-Charge. |
| 26 | S&F in repairs V Belt of alternator of DG Set of capacity 7.5 to 40 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 27 | S&F in repairs V Belt of alternator of DG Set of capacity 55 to 100 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 28 | S&F in repairs V Belt of alternator of DG Set of capacity 125 to 250 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 29 | S&F in repairs V Belt of Water pumps of DG Set of capacity 55 to 100 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 30 | S&F in repairs V Belt of Water pumps of DG Set of capacity 125 to 250 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 31 | S&F in repairs V Belt of Fan of DG Set of capacity 7.5 to 40 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 32 | S&F in repairs V Belt of Fan of DG Set of capacity 55 to 100 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 33 | S&F in repairs V Belt of Fan of DG Set of capacity 125 to 250 KVA as per existing size complete all as specified and as directed by the Engineer-in-Charge. |
| 34 | S&F in repairs of Turbo charger from DG sets of capacity 55 to 100 KVA and carrying out maintenance wks i.e. opening, cleaning and replacement of turbo charger kit ( i.e. shaft, O ring, bearing / bush and nut bolts) clamps hoses including calibration of turbo charger, through authorised agency / work shop by OEM and refixing Turbo charger in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 35 | S&F in repairs of Turbo charger from DG sets of capacity 125 to 250 KVA and carrying out maintenance wks i.e. opening, cleaning and replacement of turbo charger kit ( i.e. shaft, O ring, bearing / bush and nut bolts) clamps hoses including calibration of turbo charger, through authorised agency / work shop by OEM and refixing Turbo charger in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 36 | S&F in repair/Maint of self starter from DG sets of capacity 7.5 to 40 KVA and carrying out maintenence wks i.e. opening, cleaning and replacement of starter winding, turbo bushes and bearings through authorised agency / work shop by OEM and refixing self starter in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 37 | S&F in repair/Maint of self starter from DG sets of capacity 55 to 100 KVA and carrying out maintenence wks i.e. opening, cleaning and replacement of starter winding, turbo bushes and bearings through authorised agency / work shop by OEM and refixing self starter in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 38 | S&F in repair/Maint of self starter from DG sets of capacity 125 to 250 KVA and carrying out maintenence wks i.e. opening, cleaning and replacement of starter winding, turbo bushes and bearings through authorised agency / work shop by OEM and refixing self starter in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 39 | M&L for taking out / dismentling of alternator assembly from DG sets of capacity 7.5 to 40 KVA and carrying out maintenence wks i.e. opening , cleaning, replacement of starter winding, carbon bushes , bearings and diodes through authorised agency / work shop by OEM and refixing self starter in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 40 | M&L for taking out / dismentling of alternator assembly from DG sets of capacity 55 to 100 KVA and carrying out maintenence wks i.e. opening , cleaning, replacement of starter winding, carbon bushes , bearings and diodes through authorised agency / work shop by OEM and refixing self starter in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 41 | M&L for taking out / dismentling of alternator assembly from DG sets of capacity 125 to 250 KVA and carrying out maintenence wks i.e. opening , cleaning, replacement of starter winding, carbon bushes , bearings and diodes through authorised agency / work shop by OEM and refixing self starter in same position after repairs, testing and commissioning, complete all as specified and directed. |
| 42 | S&F in repairs Hinges of door of acoustic enclosure of DG Set of any capacity by removing old hinges and welding new hinges as per existing pattern for smooth opening of door, complete all as specified and directed. |
| 43 | M&L for taking out / desmentling of unserviceable auto mains failures unit from DG set of capacity 7.5 KVA to 40 KVA and replace by new wiring harness via 2 Nos connectors of suitable capacity / specification of existing AMF unit installed at site including complete installation, testing and commissioning wks carried out through authorised agency / work shop, complete all as specified and directed. |
| 44 | All as per ser item No 42.00 here in above but DG Set of capacity 55 to 100 KVA. |
| 45 | All as per ser item No 42.00 here in above but DG Set of capacity 125 to 250 KVA. |
| 46 | S&F in repairs of fuel injector pump from DG Set, transporting to workshop for calibrating and replacement of worn out parts like TD piston,service kit including all types of filter and including filling of new engine oil 15W40 required, compressor spring, cam bush, alternator bush, supplier pump, TR pin bush, and packing kit including pressure setting, connecting to Lathe work and replacing unserviceable AVR complete with control wiring and refixing the same and complete installation, testing and commissioning wks carried out through authorised agency / work shop for the capacity of DG sets 7.5 to 40 KVA, complete all as specified and directed. |
| 47 | All as per ser item No 45.00 here in above but capacity of DG Set 55 to 100 KVA. |
| 48 | All as per ser item No 45.00 here in above but capacity of DG Set 125 to 250 KVA. Please Enable Macros to View BoQ information |
| 49 | All as per ser item No 45.00 here in above but capacity of DG Set 125 to 250 KVA. Please Enable Macros to View BoQ information |