| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:Rate for a lead upto1 meter from cutting edge All kinds of soil |
| 2 | Providing and laying WBM GII with specified stone aggregate 63mm to 45 mm of size including stone screening 13.2 mm nominal size and binding material complete incl. sorting , spreading to template and consolidations with power road roller 8 to 10 tonne capacity. |
| 3 | Providing and laying WBM GIII with specified stone aggregate 53 mm to 22.4 mm of size including stone screening 11.2 mm nominal size and binding material complete incl. sorting , spreading to template and consolidations with power road roller 8 to 10 tonne capacity. |
| 4 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity |
| 5 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On W.B.M. @ 0.75 Kg/sqm. |
| 7 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm. |
| 8 | Disposal of mulba beyond municipal limits(10 km avg. lead). |
| 9 | Engaging Labour for clearance of road surface due to damage caused by PHE Department and other emergent work. |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 11 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 12 | Carriage of material by mechanical transportation upto a lead of 10 km Sand average lead 10 Km |
| 13 | Carriage of material by mechanical transportation upto a lead of 10 km Stone aggregate 40 mm nominal size and above |
| 14 | Carriage of material by mechanical transportation upto a lead of 10 km Stone aggregate Below 40 mm nominal size Please Enable Macros to View BoQ information |