|
| 1 | Supply and installation of new units for the 40 TR Accel SMC-100 compressors (Units II & III) |
| 2 | Charges for the decommissioning and removal of existing service valves from 40 TR Accel compressor blocks, including the supply and installation of new 2.5\\" diameter suction line service valves for Units I, II, and III. |
| 3 | Charges for the decommissioning and removal of existing service valves from 40 TR Accel compressor blocks, including the supply and installation of new 2\\" diameter delivery line service valves (Brand as approved by EIC) for Units I, II, and III. |
| 4 | Charges for checking the expansion valves and replacing the defective ones with new valves (Make:Emarson or its equivalent as approved by EIC) in their respective positions. |
| 5 | Charges for decommissioning defective 1.5\\" (Dia) liquid line hand shut-off valve & replacing the same with a new one (Make:Super or its equivalent as approved by EIC) |
| 6 | Repairing of 40 Ton capacity ACCEL make compressor block (Unit no. III) of A.C.Plant at Centenary Building, High Court, Kolkata. a) Charges for the complete mechanical overhauling and commissioning of a 40 TR Accel Sabro 4-piston compressor, involving component-level dismantling, defect identification, solvent cleaning (with kerosene & petrol), and precision re-assembly of spares. |
| 7 | b) Supply of spares for the aforementioned work : i)Seal-end bush bearing made with white metal & coller |
| 8 | ii)Shaft-end bush bearing made with white metal & coller |
| 9 | iii)Connecting rod in-shut bearing made with white metal (incl. matching & lapping) |
| 10 | iv)Connecting rod small-end bush bearing made with bronze |
| 11 | v)Linner |
| 12 | vi)Piston only |
| 13 | vii)Piston pin |
| 14 | viii)Piston pin lock |
| 15 | ix)Piston compresson ring & Oil ring |
| 16 | x)Suction & Delivery reed |
| 17 | xi)valve plate |
| 18 | xii)Suction & Delivery valve spring |
| 19 | xiii)Cap lock spring |
| 20 | xiv)Connecting rod nut (Nylex) |
| 21 | xv)Alluminium jointing washer |
| 22 | xvi)Loader spring |
| 23 | xvii)Discharge valve kit |
| 24 | xviii)Lock for valve kit |
| 25 | xix)Oil filter |
| 26 | xx)Shaft seal assembly |
| 27 | xxi)Compressor jointing gasket |
| 28 | xxii)Compressor Oil |
| 29 | c) Charges of grinding & polishing crank shaft- 4 points |
| 30 | d) Charges for reparing oil pump, replacing bush bearing with gun metal, grinding & polishing shaft & gear wheel complete with neoprin 'O' ring. |
| 31 | e) Charges for delivery of materials at the site |
| 32 | Add. G.S.T.@ 18% on total value. |
| 33 | Add. LWC.@ 1% on total value Please Enable Macros to View BoQ information |