| 1 | Repair & Rehabilitation of divertion bridge Providing and Painting of structural steel surfaces of bridge members by grit blast cleaning or centrifugal blasting with a suitable abrasive materials like crushed slag in accordance with clause-III of IS 6586 : 1989 immediately before painting , to make the surface free from grease, oil, rust and other foreign materials. The rate includes supply of abrasivesand,fuel, cost of paint including all transportation, lead, lift and labour charges, consumables, tools & plants complete in all respect but exclusive of cost for staging/scaffolding. Painting of approved Zinc-phosphate primer of DFT 65 micron followed by finish coat of Micaceous iron oxide pigmented drying oil type paint of DFT 75 micron. |
| 2 | Hire and labour charges for staging with sal bullah for super structure of bridge (Major and Minor) including stripping off and removing clearing on completion of work as per design and drawing approved by the Engineer-in-charge. |
| 3 | M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc.(length of straight not less than 230 mm) |
| 4 | Welding by gas / electric plant including transportation of welding plant at site including cutting, forging & drilling to required shape. |
| 5 | Bullah pilling work Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed.(i) 100mm diameter |
| 6 | (iii) 150mm diameter |
| 7 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (i) 100mm diameter |
| 8 | (iii) 150mm diameter |
| 9 | Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts. |
| 10 | Coal tarring on wooden surfaces including cost of materials (a) Double coat. |
| 11 | Supplying empty Cement bags & Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. |
| 12 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement) (i) In ordinary soil |
| 13 | Pitching Work Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(i) With pumping out water including shoring as required. |
| 14 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m. |
| 15 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 16 | Single brick flat soling of picked jhamma bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.For Flooring |
| 17 | Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (a) M-15 Grade Using concrete mixer |
| 18 | Hire & labour charges for shuttering with centering and necessary staging upto 4.00 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (f) 25 to 30 mm thick shuttering without staging in foundation. |
| 19 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control,sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. Grade M25 I) Using concrete mixer |
| 20 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. |
| 21 | Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. |
| 22 | GST (Sl-01 to Sl-19) |
| 23 | CESS (SL-01 to Sl-20) Please Enable Macros to View BoQ information |