|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. Vide Sor No 2.03 (i) A |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Vide Sor No 12.01B (i) |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Vide Sor No 4.01B (v) |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Vide Sor No 4.14 B |
| 5 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Vide Sor No 5.01 A (i) |
| 6 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Granular Surface Vide Sor No 5.02 (ii) |
| 7 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Vide Sor No 5.02 (i) |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. Vide Sor No 5.04 B |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects. Vide Sor No 5.05 B |
| 10 | 80mm thick C.C.paver block of M-40 grade with approved color design and pattern.Providing and laying factiry made chamfered edge Cement Concrete Paver block in foot Path, Park,lawns,drive ways or light traffic parking etc,of required strength,thickness & size/shape,made by table vibratory method using PU mould,laid in required colour & pattern over 50mm thick compacted bed of sand,compacting and proper embedding/laying of inter locking paver blocks in to the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern,finishing and sweeping extra sand.complete all as per direction of Engineer-in-Charge . S.O.R No. DSR 16.91.2 |
| 11 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Vide Sor No 8.13 |
| 12 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area not exceeding 0.9 sqm fixed over back support frame of min 35 x 35 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Vide Sor No 8.06 |
| 13 | Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973) Vide Sor No 8.35 SOR 2021-22 |
| 14 | Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail, 70cm above road/ ground level fixed on ISmc series chanel vertical post, 150 x75x5 mm spaced 2 m centre to centre, 1.8 m high, 1.1m below ground/ road level all steel parts and fitments to be galvanised by hot deep process, all fittings confirm to IS: 1367 and IS: 1364, metal beam rail to be fixed on the vertical post with a spacer of chanel section 150x75x5 mm, 330 mm long complete as per clause 810. Vide Sor No 8.23 A |
| 15 | Providing RCC NP4 Pipe (600mm dia) Vide Sor No M-1677 |
| 16 | Fixing of Reflective Sheeting including all Cost of Materials and fitting Charge Complete works .Vide Sor No NS |
| 17 | Painting on Wood Surfaces (Providing and applying two coats of ready mix paint of approved brand on wood surface after thorough cleaning of surface to give an even shade) Vide Sor No 8.10 |
| 18 | Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) Vide Sor No 8.08 |
| 19 | GST @18% of Total Civil Work |
| 20 | Labour Cess @1% (Civil Work + GST) Please Enable Macros to View BoQ information |