| 1 | Detail of Work |
| 2 | Safely carriage of 11 KV O/G VCB (CTR 400/200/5A) 1250 AMP. from ESC, SRE to site of work including loading & unloading at both ends. |
| 3 | Safely Installation of 11 KV O/G VCB complete with fixing and making cable connection with proper alignment in all respect. |
| 4 | Removal of old & damaged 11 KV VCB after opening of all connection and nuts & bolts with carriage from site to ESC SRE including loading & unloading at both ends. |
| 5 | Water Level Earthing of 11 KV Incoming /Outgoing VCB by boring 60 ft. deep and providing & fixing 60 ft. G.I. pipe 1½ dia (Jindal class B) and connecting with G.I. strip of size 40x5 mm with providing of requireed charcoal and salt in the pipe properly. |
| 6 | Supply, laying, fixing and testing of electrical insulating rubber mats in front of VCB panels, control panels, and associated switchgear complete as per specifications. |
| 7 | Safely carriage of Battery set 24 Volt 200 Ah. (09 No) and battery charger 24 volt (09 No) from ESC, SRE to site of work including loading & unloading at both ends. |
| 8 | Installation of Battery set 24 Volt 200 Ah. (09 No) and battery charger 24 volt (09 No) complete with fixing and making cable connection with proper alignment in all respect. |
| 9 | Removal of old & damaged Battery set & charger (09 No Set) after opening of all connection and nuts & bolts with carriage from site to ESC SRE including loading & unloading at both ends. |
| 10 | Safely carriage of PCC Poles (11 Mtr. Long) from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 11 | Safely carriage of PCC Poles (09 Mtr. Long) from ESC, SRE/JE store to site of work including loading & unloading at both ends. |
| 12 | Safely carriage of other complete line material. (Except PCC ) from ESC, SRE/ JE store to site of work including loading, unloading at both ends. |
| 13 | Concreting of PCC Pole 9/11 Mtr long with cement concreting in block of 600x600x1500 mm in ration 1:4:8 with cement sand and Brick ballast size 1x1.5 sq mm. |
| 14 | Earthing of poles by earthing rod. |
| 15 | Erection of single support on PCC poles (9 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 16 | Erection of single support on PCC poles (9 Mtr long) Long with complete fitting of all accessories of 11 KV/LT line. complete. |
| 17 | Fixing of /33 KV stay rods (Stay Set) by digging of pits in block of 600X600X300 mm. & with nozzling of stay wire 7/10 / 7/8 SWG and fitting the same on the pole. |
| 18 | Providing and fixing of 33 KV X-Arm Holding clamp nut & bolts made of new MS flat iron 50x6 mm |
| 19 | Fixing of 33 KV X-Arm as per RESPO norms. |
| 20 | Providing and fixing Holding Clamp with nuts & bolt. |
| 21 | Providing and fixing 33 KV Clamp with nuts & bolt. |
| 22 | Fixing of 33 KV Polymeric Pin Insulator complete. |
| 23 | Fixing of 33 KV Disc Insulator complete. |
| 24 | Fixing of 33 KV Post Insulator complete. |
| 25 | Providing and fixing of stone ped complet. |
| 26 | Providing and fixing of GI barbed wire on the each pole. |
| 27 | Providing and fixing 33 KV Danger board with clamp and nuts&bolt |
| 28 | Providing & Fabrication charges of Angle 65x65x6/75x75x6x2028 completly |
| 29 | Providing & Fabrication charges of Chanal 100x50x6/125x65x1300 completly |
| 30 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Dog Conductor for 33KV Line complete properly. |
| 31 | Safely carriage of 33 KV Line Isolator 800 amp (3+5) from ESC, SRE to site of work including loading & unloading at both ends. |
| 32 | Making of New Structure for 33 KV Isolator |
| 33 | Safely installation 33 KV Line Isolator (3+5) on four Pole Structure. |
| 34 | Water level Earthing of 33 KV Line Isolator (03 No combind) completly |
| 35 | Constriction of plinth for four Pole of 33 KV Line Isolator (3 No) with cement & sand and plastered on outer surface of brick wall. |
| 36 | Removal of old & used and damaged STP pole (120 Kg) from the Existing 33 KV/11KV lines and shifting the same to ESC, SRE/J.E store including loading and unloading at both ends. Please Enable Macros to View BoQ information |