| 1 | Installation of 250 KVA New Distribution Transformer Related Works- |
| 2 | Cartage of line Material from Central Store to JE store and JE store to different work site including loading & unloading at both ends. |
| 3 | Cartage of ST/PCC Pole (11 mter 81 No and 8.5 Meter 37 No. ) from central store to dump site with loding/unloading and from JE store/dump site to work site with loading/unloading etc. |
| 4 | Erection of 8.5 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 5 | Cartage of 34 No T/F 250 KVA from Central Store to JE store and JE store to site of work including loading & unloading at both ends. |
| 6 | Erection of 11 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 7 | Erection of Double Pole on STP/PCC Pole after digging of pit of required size in all type of Soil for each pole, including back filling of the pole with proper ramming after completion of work. |
| 8 | Fixing of Jointing kit suitable for 11 XLPE cable. |
| 9 | Providing and Fixing Nut and Bolts off size. |
| 10 | Providing & Fixing of Fencing (as per site requirement) at Various Distribution Transformers at Different Locations |
| 11 | Fixing of 11 KV TPMO set. |
| 12 | Making of Plinth / fixing of gatar/channel & chair of T/F by MS angle/garter(as per site requirement) |
| 13 | Providing and Fixing of 11 KV Fuse Set on 250 KVA Transformer properly complete work in all respect. |
| 14 | Water level earthing of neutral and body of distribution transformers of 11/0.4 kv transformers by boaring of earth upto water level (15 to 20 Mtr.) and lowering of GI Pipe 32 mm dia upto water level and connecting the same by ms flate of size 40x4 mm with transformers. The transformer will be earthed properly including/cutting, jointing, welding etc. of MS Earth Strip and connecting one earthing with the neutral bushing of transformer and other to the body of transformer at several points. The GI Pipes will be connected to each other with the help of G.I. Sockets and a cap will be provided on the upper part of the G.I. Pipe for pouring of water during summer season. |
| 15 | Providing and Fixing of Distribution Box |
| 16 | Providing of earthing rods and Earthing of poles with earthing rod complete in all respect. |
| 17 | Fixing of 11 KV Disc Insulator with fitting nuts. |
| 18 | Providing and Fixing Concreting of pole/stay |
| 19 | Fixing of 11 KV insulator with pin |
| 20 | Earthing & Grauting of each 11 KV Line Pole properly after drive of electrodes of size 20mmx250mm and connection the earthing point with GI Wire. |
| 21 | Grouting/Concreting of poles |
| 22 | Providing & Fixing of Piercing Connector |
| 23 | Providing & Fixing of all types of Clamps as per site requirement |
| 24 | Fixing of 250/400/630 Lt Lead XLPE Cable (All Size) |
| 25 | Providing and Fixing of LT Aluminum Crimping Lugs as per site requirement |
| 26 | Providing and Fixing of Copper L-piece 50x225x10 mm/ 62x225x12 mm |
| 27 | Laying of L.T. ABC all size |
| 28 | Laying /Fixing of Weasel Conductor |
| 29 | Laying /Fixing of Connecting lead |
| 30 | Fixing of Stay Set with Grouting |
| 31 | Providing and Fixing of Number & Danger Plate |
| 32 | Laying & fixing of line material like cross arm/channel etc. |
| 33 | Fabrication and fixing of Topper & Droper MS Channel & MS Angle (65x65x6) mm bracing with clamp, fixing of all 11 KV Accessories & Base Channel. |
| 34 | Laying of 11 KV XLPE cable Overhead of different size as per site requirement including binding etc. |
| 35 | Providing and Fixing Holding Clamps |
| 36 | Providing and Fixing of 11 KV Tail Less unit on 250 KVA Transformer properly complete work in all respect. (Single/Double Circuit) |
| 37 | Increasing Transformer Capacity Related Works- |
| 38 | Cartage of 1 No T/F 63 KVA and 1 No T/F 100 KVA from Central Store to JE store and JE store to site of work including loading & unloading at both ends. |
| 39 | Cartage of PCC Pole (8.5 Meter 06 No. ) from central store to dump site with loding/unloading and from JE store/dump site to work site with loading/unloading etc. |
| 40 | Erection of 8.5 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 41 | Erection of Double Pole on PCC Pole after digging of pit of required size in all type of Soil for each pole, including back filling of the pole with proper ramming after completion of work. |
| 42 | Cartage of line Material from Central Store to JE store and JE store to site of work including loading & unloading at both ends. |
| 43 | Re conditioning/Fixing of Existing Tilted Double pole properly complete in all respect. |
| 44 | Fixing of Trolly to Provide unintrupedted Electricity supply during the Maintenance work. |
| 45 | Safely mounted 63KVA/100KVA T/F on double pole structure/plinth/Chair Type structure suitable for site. and making jumpring and binding all connection properly. |
| 46 | Water level earthing of neutral and body of distribution transformers of 11/0.4 kv transformers by boaring of earth upto water level (15 to 20 Mtr.) and lowering of GI Pipe 32 mm dia upto water level and connecting the same by ms flate of size 40x4 mm with transformers. The transformer will be earthed properly including/cutting, jointing, welding etc. of MS Earth Strip and connecting one earthing with the neutral bushing of transformer and other to the body of transformer at several points. The GI Pipes will be connected to each other with the help of G.I. Sockets and a cap will be provided on the upper part of the G.I. Pipe for pouring of water during summer season. |
| 47 | Laying of L.T. ABC /(3X95 sq.mm) |
| 48 | Providing of earthing rods and Earthing of poles with earthing rod complete in all respect. |
| 49 | Grouting/Concreting of poles |
| 50 | Providing & Fabrication and fixing of Channel ,Angle as per site requirement . |
| 51 | Providing and Fixing of 11 KV Fuse Set on 250/400 KVA Transformer properly complete work in all respect. |
| 52 | Providing and Fixing of GI WIRE 5mm 6 SWG. |
| 53 | Providing and Fixing of connecting lead 1x16 sq.mm. |
| 54 | Providing and Fixing of all type off size Clamps(suspension,Dead end ,Holding,J-Huk) as per site requirement. |
| 55 | Providing & Fixing of Piercing Connector |
| 56 | Providing and Fixing Holding Clamps |
| 57 | Providing and Fixing Distribution Box |
| 58 | Received Back of Material |
| 59 | Cartage of 10/25/63 KVA T/F and other dismantling material from different site of work to JE store and JE store to Central store including loading & unloading at both ends. Please Enable Macros to View BoQ information |