| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRTH Specification Clause 201. |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 |
| 3 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical meanswith a lead of 1 Km.. For Grading-I Material |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. |
| 5 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 |
| 6 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. |
| 7 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects for Grading-II(13 mm nominal size) Bitumen (VG-30) |
| 8 | Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 60 mm as per drawings and as per IS 15658:2006.and materials conforming to MoRTH Specification Clause 602 with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks.Category 'B' : Dentated only two side like I,Z,T shape as per IRC:SP:63-2004 |
| 9 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 10 | Barricading with sal ballies as per design including tying with vertical posts by coconut strings complete in all respect with two horizontal members and vertical supports upto 2.5m centre to centre and for 3 days period including removal and cleaning the site complete in all respect. Complete |
| 11 | Providing & covering by GOBAR LAP on Helipad as direction given by engineer-in-charge |
| 12 | Sprinkling of water around Helipad as direction given by engineer-in-charge |
| 13 | Supply of Hydraulic excavator 0.9 cum including Driver POL,T&P and Maintenance etc |
| 14 | Supply of Tractor with Trolley including Driver POL,T&P and Maintenance etc |
| 15 | Supply of Three wheel 80-100 KN Vibratory roller 80-100 kN including Driver POL,T&P and Maintenance etc |
| 16 | Total Cost of Work |
| 17 | GST 18% on BOQ Item Total Amount Rs 4237071 B31 as per FD Order no date 23-03-26 and The CE PWD Rajasthan Order No 21589477 Date 15.04.26\\" Please Enable Macros to View BoQ information |