| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50m as per MoRTH Specification Clause 305.3 |
| 2 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete.Earth, Sand, Lime, Morrum manure or sludge.for 6 km |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. By Mix in Place Method. For Grading II Material |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000m as per MoRTH Specification Clause 301.3 |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall inCement Mortar 1:4 ( 1-Cement : 4-Sand). |
| 7 | Plaster on new surface on wall in cement sand mortar 1:3 including racking of joints etc. complete fine finish :20mm thick |
| 8 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80 100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404.Using Crusher Broken Aggregate for culver By Manual Meanst |
| 9 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall sand parapets Clause 2905. 600 mm dia Please Enable Macros to View BoQ information |