|
| 1 | SETTING UP OF, ERECTION AND ALIGNMENT OF MS STRUCTURE OF SIZE OF MS STRUCTURE SIZE 10 M X 6M X 3M HEIGHT INCLUDING PROVISION OF A DOOR BY USING ZINC COATED MS HOLLOW SECTION OF 80MM X 80 MM WOULD LIKELY BE USED FOR PRIMARY LOAD BEARING COLUMNS AND MAIN BEAMS, WHILE THE 40 MM X 40MM WOULD BE SECONDARY FRAMING ELEMENTS, SUCH AS PURLING, BRACING OR INTERNAL PARTITIONING. INVOLVES PRECISE PLANNING, MATERIAL PREPARATION, JOINING AND ASSEMBLY, FOLLOWED BY CAREFUL ALIGNMENT TO ENSURE STRUCTURAL STRENGTH. THE DESIGN MUST ACCOUNT FOR STRUCTURAL LOAD, INCLUDING THE SELF-WEIGHT, GYPSUM OR PVC CEILING /WALL CLADDING AND POTENTIAL SEISMIC FORCES ETC. | SETTING UP OF, ERECTION AND ALIGNMENT OF MS STRUCTURE OF SIZE OF MS STRUCTURE SIZE 10 M X 6M X 3M HEIGHT INCLUDING PROVISION OF A DOOR BY USING ZINC COATED MS HOLLOW SECTION OF 80MM X 80 MM WOULD LIKELY BE USED FOR PRIMARY LOAD BEARING COLUMNS AND MAIN BEAMS, WHILE THE 40 MM X 40MM WOULD BE SECONDARY FRAMING ELEMENTS, SUCH AS PURLING, BRACING OR INTERNAL PARTITIONING. INVOLVES PRECISE PLANNING, MATERIAL PREPARATION, JOINING AND ASSEMBLY, FOLLOWED BY CAREFUL ALIGNMENT TO ENSURE STRUCTURAL STRENGTH. THE DESIGN MUST ACCOUNT FOR STRUCTURAL LOAD, INCLUDING THE SELF-WEIGHT, GYPSUM OR PVC CEILING /WALL CLADDING AND POTENTIAL SEISMIC FORCES ETC. |
| 2 | PROVIDING AND PLACEMENT OF 12MM THICK SUPERIOR QUALITY CHEMICALS PRESSURE TREATED EDGE GLUED FINGER JOINTED ISO SPECIFICATION VERTICAL PANELLING OF 300 MM WITH 10 MM TONGUED AND GROOVED. THE LUMBER FRAME WORK ON MS SQUARE PIPES STRUCTURAL WALL WILL BE DONE BY SCREWING / ADHESIVE OF HUAT WOOD/ HDHMR BOARD/ RUNNERS OF SIZE 50 MM X 18 MM. NECESSARY SPAN OF HORIZONTAL FRAME WORK TOP 150 MM - 600 MM. THE DESIGNED RUBBERWOOD SKIRTING WILL BE FIXED ON THE TOP PANEL. AFTER THE CARPENTRY WORK IS COMPLETE THE ENTIRE PANELLED SURFACE WILL BE SANDED WITH 60 AND 80 WOOD SANDING PAPER, WILL THEN APPLY SHELLAC/ BERGER MAKE FILLER WITH A MIXTURE OF NCD THINNER THEN STICK CHALK PUTTY ON THE WORN / NAILING AREA, WHICH WILL BE SANDED WITH 120 MM SANDING PAPER. AFTER THIS, WOOD SEALER WILL BE APPLIED, THEN RUBBED WITH 320 SANDPAPER. ONCE THE ABOVE PROCESS IS COMPLETED MELAMINE SPRAY POLISH WILL BE SPRAYED FOR BETTER SHINE, FINISHING AND DURABILITY. | PROVIDING AND PLACEMENT OF 12MM THICK SUPERIOR QUALITY CHEMICALS PRESSURE TREATED EDGE GLUED FINGER JOINTED ISO SPECIFICATION VERTICAL PANELLING OF 300 MM WITH 10 MM TONGUED AND GROOVED. THE LUMBER FRAME WORK ON MS SQUARE PIPES STRUCTURAL WALL WILL BE DONE BY SCREWING / ADHESIVE OF HUAT WOOD/ HDHMR BOARD/ RUNNERS OF SIZE 50 MM X 18 MM. NECESSARY SPAN OF HORIZONTAL FRAME WORK TOP 150 MM - 600 MM. THE DESIGNED RUBBERWOOD SKIRTING WILL BE FIXED ON THE TOP PANEL. AFTER THE CARPENTRY WORK IS COMPLETE THE ENTIRE PANELLED SURFACE WILL BE SANDED WITH 60 AND 80 WOOD SANDING PAPER, WILL THEN APPLY SHELLAC/ BERGER MAKE FILLER WITH A MIXTURE OF NCD THINNER THEN STICK CHALK PUTTY ON THE WORN / NAILING AREA, WHICH WILL BE SANDED WITH 120 MM SANDING PAPER. AFTER THIS, WOOD SEALER WILL BE APPLIED, THEN RUBBED WITH 320 SANDPAPER. ONCE THE ABOVE PROCESS IS COMPLETED MELAMINE SPRAY POLISH WILL BE SPRAYED FOR BETTER SHINE, FINISHING AND DURABILITY. |
| 3 | PROVIDING AND PLACEMENT OF FALSE CEILING AT ALL HEIGHT INCLUDING FIXING OF FRAME WORK MADE OF SPECIAL SECTIONS POWER PRESSED FROM MS SHEETS AND GALVANIZED WITH ZINC COATING OF 120 GRAMS/SQM AS PER IS:277 AND CONSISTING OF ANGLE DEATS. INCLUDING FIXING PERIMETER CHANNELS 0.5MM THICK HAVING FLANGES OF 20 MM AND 30 MM LONG. FIXING OF GYPSUM CEILING BOARD WITH THE HELP OF APPROPRIATE DISTEMPER. NECESSARY PROVISION OF OPENING FOR LIGHT FITTINGS. | PROVIDING AND PLACEMENT OF FALSE CEILING AT ALL HEIGHT INCLUDING FIXING OF FRAME WORK MADE OF SPECIAL SECTIONS POWER PRESSED FROM MS SHEETS AND GALVANIZED WITH ZINC COATING OF 120 GRAMS/SQM AS PER IS:277 AND CONSISTING OF ANGLE DEATS. INCLUDING FIXING PERIMETER CHANNELS 0.5MM THICK HAVING FLANGES OF 20 MM AND 30 MM LONG. FIXING OF GYPSUM CEILING BOARD WITH THE HELP OF APPROPRIATE DISTEMPER. NECESSARY PROVISION OF OPENING FOR LIGHT FITTINGS. |
| 4 | PROVIDING AND PLACEMENT OF POLYVINYL CHLORIDE (PVC) LOUVERS SHOULD BE WATERPROOF AND MOISTURE RESISTANT. | PROVIDING AND PLACEMENT OF POLYVINYL CHLORIDE (PVC) LOUVERS SHOULD BE WATERPROOF AND MOISTURE RESISTANT. |
| 5 | PROVIDING AND PLACEMENT OF U-SHAPED WOODEN CONFERENCE TABLE MADE WITH SUPERIOR QUALITY CHEMICALS PRESSURE TREATED EDGE GLUED FINGER JOINTED ISO SPECIFICATIONS PANEL BOARD AND LUMBER. PROVISIONS KEEPING FILE SHELVES AND FOOTREST. INCLUDING MELAMINE METHOD OF SPRY POLISH. SIZE- 40 FEET X 02 FEET 2½ FEET | PROVIDING AND PLACEMENT OF U-SHAPED WOODEN CONFERENCE TABLE MADE WITH SUPERIOR QUALITY CHEMICALS PRESSURE TREATED EDGE GLUED FINGER JOINTED ISO SPECIFICATIONS PANEL BOARD AND LUMBER. PROVISIONS KEEPING FILE SHELVES AND FOOTREST. INCLUDING MELAMINE METHOD OF SPRY POLISH. SIZE- 40 FEET X 02 FEET 2½ FEET |
| 6 | PROVING AND PLACEMENT ACP PANEL ON THE TOP VIEW OF THE CONFERENCE HALL AND ADJACENT SIDE TO BE FIXED WITH THE FRAME OF ALUMINIUM OR GS RECTANGULAR SECTIONS TO MANAGE LOADS AND ENSURE AN EVEN SURFACE | PROVING AND PLACEMENT ACP PANEL ON THE TOP VIEW OF THE CONFERENCE HALL AND ADJACENT SIDE TO BE FIXED WITH THE FRAME OF ALUMINIUM OR GS RECTANGULAR SECTIONS TO MANAGE LOADS AND ENSURE AN EVEN SURFACE |
| 7 | OFFICE HIGH BACK CUSHION CHAIR | OFFICE HIGH BACK CUSHION CHAIR |
| 8 | OFFICE MINI HIGH BACK CHAIR | OFFICE MINI HIGH BACK CHAIR |
| 9 | LECTURE PODIUM WITH GROSS NECK MICROPHONE | LECTURE PODIUM WITH GROSS NECK MICROPHONE |
| 10 | CONFERENCE PA SYSTEM 16+1 MICROPHONE INCLUDING AMPLIFIER AND MIXER, SPEAKER-04 NOS WITH LAYING OF CABLES AND INSTALLATION | CONFERENCE PA SYSTEM 16+1 MICROPHONE INCLUDING AMPLIFIER AND MIXER, SPEAKER-04 NOS WITH LAYING OF CABLES AND INSTALLATION |
| 11 | PROJECTOR CUM WALL SCREEN MANUAL TYPE INCLUDING ALL OTHER ACCESSORIES | PROJECTOR CUM WALL SCREEN MANUAL TYPE INCLUDING ALL OTHER ACCESSORIES |
| 12 | LED SQUARE TYPE LIGHT INCLUDING LAYING OF CABLES WITH CASING AND CAPPING | LED SQUARE TYPE LIGHT INCLUDING LAYING OF CABLES WITH CASING AND CAPPING |